Rechercher des projets européens

20 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...ess networks demands very efficient coding schemes, coupled with adaptive resource allocation strategies. Beside the recent progress made these last 15 years, coded modulation schemes presenting near-Shannon performance at high spectral efficiency with short blocks are still missing. Besides, whilst most of the European technology has focused on Turbo-Codes (3GPP, DVB-RCS, IEEE 802.16), it has fac ...
Voir le projet

 8

 TERMINÉ 
...ith societies ever increasing data-transmission requirements. It is now recognized that research results are within a factor of 2 of fundamental capacity limits, bounded by fibre nonlinearity and the Shannon Limit and radical approaches now need to be investigated if we are to avert grid-lock on the internet. Mode-Gap will develop multi-mode photonic band gap long haul transmission fibres, and ass ...
Voir le projet

 10

 TERMINÉ 

Phase-sensitive optical parametric amplifiers (PSOPA)

Date du début: 1 mars 2012, Date de fin: 28 févr. 2017,

...road optical bandwidth, and being an enabler of a range of ultrafast all-optical functionalities. In communication, there is an urgent need to develop new technologies that can break the ‘nonlinear Shannon capacity limit’, which is considered a serious barrier for continued capacity increase needed to meet the exponentially growing demand for bandwidth. The use of PSAs is expected to be an essenti ...
Voir le projet

 2

 TERMINÉ 

Controlled Environment Laboratory for Life Sciences (CELLS)

Date du début: 1 sept. 2011, Date de fin: 31 août 2013,

...mac Corporation at Kennedy Space Centre, Florida, U.S.A. in Florida to a new research centre at Limerick Institute of Technology (LIT) Ireland. (2) Advance the research capabilities of LIT’s “Shannon Applied Biotechnology Centre (Shannon ABC)” (www.shannonabc.com) with the ultimate goal of establishing LIT as a recognised centre of excellence for controlled environment production of plants. (3) De ...
Voir le projet

 1

 TERMINÉ 

Ultra-Low-Power Holistic Design for Smart Biosignals Computing Platforms (PHIDIAS)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

... based on the new Compressive Sampling paradigm and optimized for low power computational architectures that will generate the necessary front-end but will necessitate to depart from the traditional Shannon sampling methodologies,•\tThe efficient hardware implementation of components, both analog and digital, building upon the new ultra-low-power signal processing front-end,•\tThe joint architectu ...
Voir le projet

 5

 TERMINÉ 

Allied Initiative for Training and Education in Coherent Optical Networks (ICONE)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2018,

...eneration research and development focuses on system capacities of 10-100 Tbit/s or more . A holistic system view much be kept in mind when designing systems at very high capacities (approaching the Shannon limit of about 10 bit/s/Hz when aggregating/multiplexing the capacity of several systems in one fiber) since the influence of fiber nonlinearities may then be a strongly limiting design factor ...
Voir le projet

 12

 TERMINÉ 

Nonlinear Compensation in Hybrid Raman/EDFA Amplified Optical Systems (CHAOS)

Date du début: 1 avr. 2015, Date de fin: 31 mars 2017,

...ments. In recent years, worries have arisen regarding the theoretical capacity limits for fiber-optic technology, and several methods have been proposed to overcome the barrier posed by the nonlinear Shannon limit. The ambition of this proposal is to combine several of the most promising (both in terms of potential cost and performance) solutions to this problem, developing new methods for nonline ...
Voir le projet

 1

 TERMINÉ 
...tropotamobius pallipes) and the lesser horseshoe bat (Rhinolophus hipposideros). The Grand Canal – Barrow Line is a man-made watercourse stretching across Ireland from Dublin to the River Shannon and southwards down to the River Barrow. Taken together, it supports rich and diverse floral and faunal communities, including such Annex II species as the opposite-leaved pondweed (Groenlandia densa), ...
Voir le projet

 1

 TERMINÉ 

CANTATA2

Date du début: 31 mars 2009, Date de fin: 30 mars 2012,

...itiveness. The success of the pilot project exceeded expectations and was very well received among local business.The regions involved in the project, Poher (France), Montemor-O-Velho (Portugal), Shannon (Ireland), Galicia (Spain) and Denbighshire (Wales) are rural areas with strong character, tradition, history and gastronomy which often cross the path of the largest and most popular tourist dest ...
Voir le projet

 5

 TERMINÉ 
...d in response to a reduction in visiting angler numbers to the project counties, with significant effect on the local economy. Project partners – Leitrim County Council, Fermanagh District Council, Shannon Fisheries, DCAL, Leitrim Tourism and Fermanagh Lakelands Tourism with the assistance of Agri-Food and Bioscience Institute, Belfast and Central Fisheries Board, Dublin, felt that his drop in vis ...
Voir le projet

 1

 TERMINÉ 

Towards the sustainable region (DQE)

Date du début: 31 déc. 2003, Date de fin: 29 juin 2007,

...w ways of work at SME and regional level. B) ACTIVITIES TO DATE: CP1 Project management: local and interregional management activities, according to the project plan; 8th (last) ISC took place in Shannon May 23rd 2007. CP2 Regional Operations: DQE tool was tested in 17 SMEs in 4 EU regions, and 17 new products have reached markets with positive feedback; CP2 was completed in the 6th sem. CP 3 Join ...
Voir le projet

 16

 TERMINÉ 

ROADEX Network Implementing Accessibility 4.1 (ROADEX IV)

Date du début: 30 juin 2009, Date de fin: 29 juin 2012,

...ctions in January/February 2011; GPR & FWD road surveys carried out on identified sections of the N56 and N59 public roads; Interpretation of survey data underway; Workshop to be held in Carrick-on-Shannon, 27 October 2011; Report on ROADEX in Ireland being prepared. D6 Health and Vibration. Johan Granlund of Vectura Consulting AB appointed as lead researcher for the Task; Contacts established w ...
Voir le projet

 11

 TERMINÉ 

Social Farming Across Borders

Date du début: 31 juil. 2011, Date de fin: 29 sept. 2014,

...ed Living an Ordinary Life attended by 200 people from the health and social care services, farming and rural development sectors as well as representatives of service users at Carrick on Shannon in June 2013· A network of service providers and users has been established in the cross border region which has been active through the combination of network meetings as well as field trips and web-base ...
Voir le projet

 4

 TERMINÉ 

Territories of Rivers Action Plans (TRAP)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...integrated river territory management model.PROJECT PARTNERSHIP: 10 project partners (PP), out of which 5 are regional policy makers and have provable policy impact potential: Kainuu (FI)-LP, Shannon, MidWest & SouthWest (IE), Wales (UK), SI, Bucarest (RO), Western Macedonia (GR), Zemgale (LV), and (NL). During the prepration period we identified 23 GPs to analyse and transfer, covering both the F ...
Voir le projet

 10

 TERMINÉ 

Burren Tourism for Conservation (Burren Tourism)

Date du début: 1 oct. 2012, Date de fin: 31 déc. 2017,

Background The Burren area of the Republic of Ireland is an internationally renowned karst limestone area that supports a rich and diverse range of flora and fauna, archaeological monuments and traditional cultural practices. The pressures of tourism (congestion and the use of resources) on the area, however, are considerable. Its seasonal nature presents ...
Voir le projet

 9

 TERMINÉ 
Rising markets, as well as investors, often neglect rural areas because of their lack of attractiveness and competitiveness. In order to develop their economy and employment level, rural regions have to innovate and attract investors. Tourism remains one of the most effective drivers for increased dynamism and job creation as part of economic diversification of these territories.The ICER project b ...
Voir le projet

 7

 TERMINÉ 

Rural Innovation and Business Systems (RIBS)

Date du début: 30 juin 2010, Date de fin: 30 déc. 2012,

The Rural Innovation and Business Systems (RIBS) project will specifically help SMEs in rural regions of Ireland, Scotland, Iceland, Sweden and Finland to address the effects of the economic downturn and strengthen their competitiveness and growth potential. Based on the needs analysis of the SMEs and the business support community in the target regions, RIBS will develop Business Growth Programme ...
Voir le projet

 6

 TERMINÉ 

Biomass Mobilisation (BioMob)

Date du début: 1 déc. 2009, Date de fin: 30 nov. 2011,

The overall concept of BioMob is the development of research-driven clusters for biomass-mobilisation. The project, built on the outputs of a previous Altener-funded project, has a strong business focus and its ultimate goal is to see knowledge-based enterprises grow and thrive in the biomass sectors. This will support the sustainable use of biomass and the meeting of regions' renewable energ ...
Voir le projet

 13

 TERMINÉ 

Managing the Industrial Territories in the Knowledge Era (MITKE)

Date du début: 31 oct. 2008, Date de fin: 30 oct. 2011,

Business Areas and Industrial Parks (BAIPs) are important policy and planning instrument for local and regional development. Well planned and equipped BAIPs stimulate the relocation of industries and help to relieve congestion and pollution in metropolitan areas. The successful development of a region depends fundamentally on the region's capacity to support and sustain the competitiveness of its ...
Voir le projet

 11

 TERMINÉ 

Digital Age in Rural and Remote Areas 1.12 (DARRA)

Date du début: 31 déc. 2007, Date de fin: 30 déc. 2010,

The objective of DARRA project is to decrease the digital divide in remote and rural areas among the partner regions, through boosting the usage of ICT by SMEs and the public sector, and improve the overall regional competitiveness. DARRA capitalises on the findings of BIRRA project. The digital divide is a handicap inter-and intra-regionally and one indicator of a region’s peripherality. DARRA pr ...
Voir le projet

 12