Rechercher des projets européens

34 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Socioeconomic sciences: Communicating Outcomes Oriented to Policy (SCOOP)

Date du début: 1 oct. 2009, Date de fin: 30 sept. 2012,

SCOOP seeks to maximise the potential for dissemination and knowledge transfer of socioeconomic sciences and humanities (SSH) research funded primarily under the Framework 7, but also including key research findings from Framework 6 funded programmes. The project specifically focuses on improving the uptake of SSH research into policy at local, regional, national and European level, with the aim o ...
Voir le projet

 3

 TERMINÉ 
SCOOP is focussed on OLED technology, microdisplays based on the combination of OLED with CMOS technology, and innovative visualisation systems. OLED microdisplays are based on "Above-IC" integration with the principal value chain being located in Europe. SCOOP intends to improve the competitiveness of European industry by helping the industrial partners to maintain and improve their technological ...
Voir le projet

 7

 TERMINÉ 

Solar Collectors made of Polymers (SCOOP)

Date du début: 1 déc. 2011, Date de fin: 31 mai 2015,

The international solar thermal market has progressed strongly over the last years. Especially in China, the USA and Europe, the manufacturing and commissioning of installations has grown rapidly. The major share of worldwide installed solar-thermal collectors consists of vacuum tube and glazed flat plate collectors. Both types are currently produced by time-consuming and cost-intensive manufactur ...
Voir le projet

 13

 TERMINÉ 

SLD and Icing tests on an Ice Protected Scoop Intake and Channel (SLD_scoop)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2011,

This propopsal concerns the planning, execution and reporting of a series of environemntal icing tests to be conducted on an intake sccop and channel. The equipment will be manufactured under a separate EU contract. This proposal will test the supplied equipment under a range of conditions including in-flight icing (CS-25 Appendix C), freezing fog, super-cooled large droplets (FAR 25 Appendix X) a ...
Voir le projet

 1

 TERMINÉ 
"B.1.1 Concept and Objectives The concept of this project is to design and build a composite prototype scoop intake, incorporating the following key aspects of design • Acoustic panelling • Electro thermal ice protection • Lightning protection (if necessary) • Erosion protection • Temperature sensing The objective of the consortium team is to effectively trade the various design requirements to pr ...
Voir le projet

 2

 TERMINÉ 
"This proposal supports the supply of an innovative scoop and NACA divergent intake, qualified to a sufficientlevel to support flight trial activities.With a successful pedigree in intake design, coupled with a wealth of experience in complex structures andhaving gained a detailed understanding of scoop intake design from successful delivery of the original JTI funded scoop program, GKN and its pa ...
Voir le projet

 4

 TERMINÉ 

Cuba's Wild Revolution

Date du début: 25 nov. 2015, Date de fin: 24 mai 2018,

...es found almost nowhere else on the planet – from the jumping crocodiles of the Zapata swamp to the vultures living among Havana’s crumbling mansions, to giant fish-eating bats that scoop their prey from pristine Cuban backwaters. The film will reveal a tropical paradise with many places as unspoiled as when Columbus first set foot on its glistening beaches over 500 years ago.‘Cuba’s Wild Revoluti ...
Voir le projet

 1

 TERMINÉ 
...tools in classroom change teaching and learning? - Learning basic media content production skills using (text photo and audio, pdf...) - Top 20 Curation tools to build awesome online magazines like Scoop.it ect - 20 tablet apps to curate the web, short review - Application of curation tools and social media in the professional context of the participants, Develop classroom ready practical reso ...
Voir le projet

 2

 TERMINÉ 
...tools in classroom change teaching and learning? - Learning basic media content production skills using (text photo and audio, pdf...) - Top 20 Curation tools to build awesome online magazines like Scoop.it ect - 20 tablet apps to curate the web, short review -Application of curation tools and social media in the professional context of the participants, Develop classroom ready practical resourc ...
Voir le projet

 2

 TERMINÉ 

Communicate, connect with the world! For better job, better life!

Date du début: 5 août 2014, Date de fin: 4 févr. 2015,

...uth exchange through the Youth in Action Program. The project was named “Youth Unemployment: Lost and Found” and was a partnership with Youthfully Yours, a Greek youth NGO and Scoop Welzijn as a coordinating Dutch youth organization with whom we had some interactions before. Then, we discovered that youth unemployment is a major problem in the EU mostly caused by the lack of work experience and al ...
Voir le projet

 4

 TERMINÉ 

préparer les métiers de demain en milieu rural

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

6 partners were involved in this partnership : Fédération Régionale des Maisons familiales Rurales (FR MFR) from Midi-Pyrénées (Mipy), Leader Center for Leader Programme and Agricultural Training Methodology (PLZMMC) in Lithuania, Scuola Centrale Formazione (SCF) in Italy, Salford City College in UK, Greek Scientific Association of Therapeutic Riding and Hippotherapy (GSATRH) in Greece and Union N ...
Voir le projet

 6

 TERMINÉ 
...2017 (150 participants) , presentations on Conferences nationally and internationally, publication by Open University Netherlands and social media, in particular curation via Scoop.it Deliverables will be freely accessible via the website until the end of the Erasmus plus programme A KA1 course on the use of Open Badges for informal learning will be o
Voir le projet

 6

 TERMINÉ 

Make me a European

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

...whole project. The work on the three kinds of products will be accompanied by an ongoing ICT course, which will be organised in four stages, each lasting six months: 1)Scoop it up! (Curation) 2)Team it up! (Collaboration) 3)Show it! (Presentation) 4)Praise it! (Evaluation) Every second week participants will be offered a new tool to try and use for project-related products. There will a webinar go ...
Voir le projet

 5

 TERMINÉ 
...s and knowledge by exchanging information through numerique tools between different schools and educational institutions in Europe. We will shared knowledge in useing to Netvibes, Information's Site, Scoop'it, plateforme e-learning and numerique bookOBJECTIVES OF THE PROJECT:- the acceptance of European cultural diversity and universality- Share ideas about scientific innovation and political issu ...
Voir le projet

 6

 TERMINÉ 
...ools and lessons for other teachers of the school. They created a project website and FB page www.clil7.webnode.sk CLIL- výu?bové materiály. The materials are shared in other teachers' groups e.g. SCOOP.IT. Useful experience with CLIL method was published in teachers magazines and local media. All team members have been participating in eTwinning projects focusing on CLIL. Based on the analysis of ...
Voir le projet

 1

 TERMINÉ 

Scooping Device for Aerial Forest Fire Suppressant (SCODEV)

Date du début: 1 févr. 2016, Date de fin: 31 juil. 2017,

The topic of this proposal is to determine the final production model of a scooping-device that allows non-amphibious conventional airtankers to scoop water from a body of water (sea, lake, river or a dam-reservoir) flying at an altitude of +/- 10 metres, in order to suppress forest fires much more quicker by 5 times. Today only dedicated amphibious airtankers, like the so-called Canadairs CL 415, ...
Voir le projet

 3

 TERMINÉ 

COoperative ITS DEployment Coordination Support (CODECS)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

...t Transport Systems and Services (C-ITS) to contribute to a safer, more flexible, mobile, sustainable and comfortable future society. In first deployment activities like the Cooperative ITS Corridor, SCOOP@F and COMPASS4D pilot projects,users will precociously experience the benefits of cooperative traffic safety and efficiency services, enabled by the integration of new technology (e.g. ETSI ITS ...
Voir le projet

 11

 TERMINÉ 

Concurrency Made Easy (CME)

Date du début: 1 avr. 2012, Date de fin: 31 mars 2017,

...ements.1. Sound conceptual model for concurrency. The starting point is the influential previous work of the PI: concepts of object-oriented design, particularly Design by Contract, and the SCOOP concurrency model.2. Reference implementation, integrated into an IDE.3. Performance analysis.4. Theory and formal basis, including full semantics.5. Proof techniques, compatible with proof techniques for ...
Voir le projet

 2

 TERMINÉ 

Towards Smart Zero CO2 Cities across Europe (SmartEnCity)

Date du début: 1 févr. 2016, Date de fin: 31 juil. 2021,

SmartEnCity’s main Objective is to develop a highly adaptable and replicable systemic approach towards urban transformation into sustainable, smart and resource-efficient urban environments in Europe through the integrated planning and implementation of measures aimed at improving energy efficiency in main consuming sectors in cities, while increasing their supply of renewable energy, and demonstr ...
Voir le projet

 35

 TERMINÉ 
The overall objective for iBUS is to develop and demonstrate by 2018 an innovative internet based business model for the sustainable supply of traditional toy and furniture products that is demand driven, manufactured locally and sustainably, meeting all product safety guidelines, within the EU. The iBUS model focuses on the capture, creation and delivery of value for all stakeholders – consumers, ...
Voir le projet

 10

 TERMINÉ 

Breakthrough solutions for adaptable envelopes for building refurbishment (BRESAER)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2019,

The overall objective of BRESAER project is to design, develop and demonstrate an innovative, cost-effective, adaptable and industrialized envelope system for buildings refurbishment including combined active and passive pre-fabricated solutions integrated in a versatile lightweight structural mesh:‒ Dynamic window with automatic and controlled air-tightness and insulated solar blinds complementin ...
Voir le projet

 17

 TERMINÉ 
BIO4SELF aims at fully biobased self-reinforced polymer composites (SRPC). To produce the SRPCs two polylactic acid (PLA) grades are required: a low melting temperature (Tm) one to form the matrix and an ultra high stiffness and high Tm one to form the reinforcing fibres. To reach unprecedented stiffness in the reinforcing PLA fibres, we will combine PLA with bio-LCP (liquid crystalline polymer) f ...
Voir le projet

 16

 TERMINÉ 

RepliCable and InnovaTive Future Efficient Districts and cities (CITYFIED)

Date du début: 1 avr. 2014, Date de fin: 31 mars 2019,

"CITyFiED project aims to develop a replicable, systemic and integrated strategy to adapt European cities and urban ecosystems into the smart city of the future, focusing on reducing the energy demand and GHG emissions and increasing the use of renewable energy sources by developing and implementing innovative technologies and methodologies for building renovation, smart grid and district heating ...
Voir le projet

 18

 TERMINÉ 

Erosion and Ice Resistant cOmposite for Severe operating conditions (EIROS)

Date du début: 8 mars 2016, Date de fin: 7 mars 2019,

In the wind power generation, aerospace and other industry sectors there is an emerging need to operate in the low temperature and highly erosive environments of extreme weather conditions. Such conditions mean current materials either have a very short operational lifetime or demand such significant maintenance as to render many applications either very expensive to operate or in some cases non-v ...
Voir le projet

 18

 TERMINÉ 

SportVoice

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

The overall objective of the project is to build capacity in civil society organisations to engage in active advocacy for the implementation of the EU PA GuidelinesThe European Partners are umbrella organisations with experience in advocacy on the EU level. They will, in turn, engage with their member associations (National Project Partners and beyond) to deliver capacity building, alliance creati ...
Voir le projet

 11

 TERMINÉ 
Within Trash-2-Cash, growing problems with paper fibre waste from the paper industry and textile fibre waste, originating from a continuously increasing textile consumption, will be solved through design-driven innovation. This will be performed by using the wastes to regenerate fibres that will be included into fashion, interior and other products. The cotton production suffers from non-sustainab ...
Voir le projet

 18

 TERMINÉ 
In the frame of previous FP6 and FP7 projects with involvement of IZADI-NANO2INDUSTRY consortium members nanotechnologies have demonstrated their effectiveness for enhancing materials and manufacturing processes performance up to a certain level tested in intended environment (TRL 5). Different nanotechnology based strategies have been addressed to develop methods to improve thermoplastics and m ...
Voir le projet

 14

 TERMINÉ 

Business Experiments in Cyber Physical Production Systems (BEinCPPS)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2018,

BEinCPPS Innovation Action aims to integrate and experiment a CPS-oriented Future Internet-based machine-factory-cloud service platform firstly intensively in five selected Smart Specialization Strategy Vanguard regions (Lombardia in Italy, Euskadi in Spain, Baden Wuertemberg in Germany, Norte in Portugal, Rhone Alpes in France), afterwards extensively in all European regions, by involving local c ...
Voir le projet

 23

 TERMINÉ 

Peat Valley: repositioning education in the region

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

Context/background of project and objectives of your project Education institutes play a central role in a knowledge-based economy. Evidence shows – consistently, and over time – that countries that invest heavily in education and skills, benefit economically and socially from that choice. Research shows that it requires schools to be flexible, responsive to the needs of the labour market and the ...
Voir le projet

 6

 TERMINÉ 

Flexibility Activated Zero Energy Districts (REnnovates)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

The Ren(n)ovates proposal focuses on the deployment and demonstration of an innovative systemic, 4-step holistic approach comprising state-of-the-art renovation with state-or-the-art smart ICT control. Deep renovation of residential buildings will be carried out including the installation of a standardised pre-fabricated energy module equipped with communication technology converting the buildings ...
Voir le projet

 9

 TERMINÉ 
Present approaches to increasing resource efficiency in manufacturing companies are mainly focused on single process optimisation. A wider and integrated optimisation is assumed to have significantly higher savings potential.In fact, a pilot study has been performed by Greenovate!Europe, showing resource saving potentials of 70%Such a strategy should include optimisation across the interfaces betw ...
Voir le projet

 16

 TERMINÉ 

Cyber Physical System based Proactive Collaborative Maintenance (MANTIS)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Voir le projet

 47

 TERMINÉ 
This R&I action will focus on optimally combining traditional roll-to-roll (R2R) compatible fabrication technologies such as printing with unique R2R sputtering, ALD and heterogeneous integration for flexible, thin, large-area electronics applications. It is seen that the different R2R fabrication methods all have their strengths and weaknesses such that using a cost-performance-optimized combinat ...
Voir le projet

 11

 TERMINÉ 

ForProve theatre

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2017,

According to the European Commission, in the second quarter of 2014 over 5 million young people (under 25) were unemployed in the EU-28. This represents an unemployment rate of 21.7% (23.2% in the euro area), which is more than twice as high as the adult unemployment rate (9.0%). Unemployment among youths has been a top priority for EU countries. One of the reasons for the unemployment is the lack ...
Voir le projet

 6