Rechercher des projets européens

31 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Intermittent Cerknica Lake (Cerknisko Jezero)

Date du début: 1 janv. 2007, Date de fin: 31 déc. 2009,

... natural watercourses with the aim of prolonging the drainage time and holding back the water in the driest summer months. This expected to raise the level of groundwater, particularly close to riverbeds or watercourses, crucial for conserving endangered habitat types and species. The project intended to purchase, remove trees from, mow and mulch abandoned wet grasslands to provide habitat for sp ...
Voir le projet

 4

 TERMINÉ 
...stitutions and local municipalities for management of valuable habitats in North-Livonia. 2)Planning local infrastrucuture. 3)Ecological restoration of aquatic habitats and promotion of ecotourism in river Salaca. 4) Planning and setting up a cross-border monitoring system is an important requirement for the management of transboundary Ramsar areas. The North-Livonian Wetland Complex is already a ...
Voir le projet

 2

 TERMINÉ 

Balancing nature and recreation in peri-urban and rural areas (BALANCE)

Date du début: 31 mai 2009, Date de fin: 30 déc. 2013,

...n Suffolk CountyPhysical accessibility and Investments- 5 regions with improved accessibility- partly realised greenway network in the region Schelde-Leie, development of tidal nature areas along the river Spui in Holland- development of 5 hectares of chalk grassland and 5 hectares of woodland in Kent- restoration and enhancement of heathlands, wetlands and coastal habitats in EnglandMental access ...
Voir le projet

 5

 TERMINÉ 

Restoring and conserving habitats and birds in Skocjanski Zatok N.R. (DOPPS)

Date du début: 1 juil. 2001, Date de fin: 30 juin 2007,

..., provided food and shelter for 41% of all amphibian and reptile species and 55% of all bird species in Slovenia. But the area was transformed into an industrial and commercial centre. The Badasevica river was diverted from the lagoon to a nearby bay and the area was used as a disposal site for mud extracted to expand the port capability. Industrial development resulted in a drastic loss of habita ...
Voir le projet

 2

 TERMINÉ 

Iron Gates Natural Park - habitat conservation and management (Iron Gates)

Date du début: 1 juin 2001, Date de fin: 31 oct. 2004,

Background The 'Iron Gates' Natural Park is located in the south-western part of Romania on the Yugoslavian border, on the left bank of the Danube river. This protected area hosts species and natural habitats of great importance at the European level and it is considered an Important Bird Area. The most interesting species present are wetland birds such a ...
Voir le projet

 1

 TERMINÉ 

DRAVA LIFE – Integrated River Management (DRAVA LIFE)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2020,

Background River ecosystems are extremely threatened in Europe. The Drava in the project area, along with the connected Mura and Danube reaches, is one of Europe's most important examples. The creation of a Transboundary UNESCO Biosphere Reserve "Mura-Drava-Danube" in Croatia, Austria, Hungary, Slovenia and Serbia is a central part of Europe's largest riv ...
Voir le projet

 6

 TERMINÉ 
...trarily drained the lagoon in 1987 because they thought that its salinity was having a negative impact on neighbouring farmland. Other factors, such as poor management of water resources, clearing of riverside woodland and human disturbance (principally from visitors and hunters), have further added to the degradation of the natural and ecological characteristics of the site. ...
Voir le projet

 2

 TERMINÉ 
...argaritifera auricularia is a large bivalve mollusc (measuring up to 20 cm). It belongs to the oldest family of freshwater mussels (also known as pearl mussels) and used to be common in all the large rivers of western Europe and northern Africa up to the 15th century. Since then its area of distribution has been drastically reduced to the point that it was considered largely extinct at the beginn ...
Voir le projet

 1

 TERMINÉ 

Restoration and protection of the River Simojoki (Simojoki)

Date du début: 1 mai 2002, Date de fin: 30 avr. 2007,

...and region contains numerous important but endangered natural habitats. The EU’s Natura 2000 programme designated 46 of them to be protected or restored to support biodiversity. The Simojoki river in southern Lapland is one area identified for conservation under the programme. It has survived in a near-natural state as one of Finland’s last undammed mid-size river systems. Most others have be ...
Voir le projet

 3

 TERMINÉ 

Protection and management of the Northern Gauja Valley (N Gauja)

Date du début: 1 oct. 2003, Date de fin: 31 déc. 2007,

Background The project focused on the middle section of the river Gauja in Latvia close to the Estonian border. The total project area (Ziemelgauja) consisted of more than 140km of extensive river valley and about 19 000 hectares of outstanding importance for a wide range of species and habitats. Due to the light sedimentary rocks, many bends have formed ...
Voir le projet

 6

 TERMINÉ 

New public uses in management and planning of a basin resources (LIFE-CORBONES)

Date du début: 1 nov. 2003, Date de fin: 28 févr. 2006,

Background The Corbones is a left-bank tributary of the Guadalquivir river. It has a low water level, and for long periods during the summer the river dries up. Many factors are responsible for the poor condition of the river including water-bearings imbalance, illegal wells, the La Puebla de Cazalla dam, inadequate plant cover protection and plugging. Al ...
Voir le projet

 3

 TERMINÉ 

Actions to preserve the NATURA 2000 sites in Alta Tuscia Viterbese (Alta Tuscia)

Date du début: 1 sept. 2004, Date de fin: 31 août 2007,

...ostly carried out in the Selva the Lamone Reserve in a total of 140ha. About 1,500 of riparian channels were restored and phytodepuration interventions were carried out along 800m of the Olpeta river and 650m of the Mezzano lake. Light infrastructures were installed in Crostoletto and Vallerosa SCIs to protect important orchids habitats and about 15km of paths were restored. Water monitoring of ...
Voir le projet

 2

 TERMINÉ 

Living Rhine floodplain near Karlsruhe (Rheinauen Karlsruhe)

Date du début: 1 déc. 2004, Date de fin: 31 mai 2010,

Background The river Rhine is a very busy shipping route in Europe and flows through densely settled terrain, so regulation of its hydrology began long ago and has continued until today. Some impacts of these interventions on the natural river and floodplain ecosystems are immediate and obvious; others such as desiccation and stagnation are long-term and ...
Voir le projet

 19

 TERMINÉ 
...s are to: Produce a strategic plan for new urban development based on the promotion of the local timber industry and the sustainable management of forests; Identify and valorise the Linear River Park, formed by the Miño, Rato and Fervedoira basins, as a Green Climatic Protection infrastructure; Improve the environmental connectivity of the action plan area by implementing a multifunctional op ...
Voir le projet

 3

 TERMINÉ 

Conservation of Senne and Medzibodrozie SPAs in Slovakia (SENNERESTSK)

Date du début: 15 nov. 2005, Date de fin: 14 mai 2011,

...tional importance of both sites is recognised in their status as Important Bird Areas and designation as RAMSAR sites. The Senne depression and Medzibodrozie plains flooded regularly before river regulation took place in the 1960s and 70s. In 1970s, a fishpond system was built in the Senne depression to support commercial fishing as well as bird protection. Nowadays, however, due to the unfavoura ...
Voir le projet

 8

 TERMINÉ 
... family of freshwater fish that comprise carp, true minnow and their relatives. Recent studies show a decline in the populations of some threatened endemic cyprinid fish species in the Duero and Tajo river basins. In order of importance, the main reasons for this decline are the existence of obstacles in the river channel, the increasing presence of invasive species, the loss of habitats due to h ...
Voir le projet

 4

 TERMINÉ 

Conservation of biodiversity of the Mura river in Slovenia (BIOMURA)

Date du début: 31 oct. 2006, Date de fin: 31 oct. 2011,

Background The bed of the river Mura that flows through NE Slovenia is well preserved, especially in the middle and lower stream, where it is characterised by embankment erosion, deposition of the sand, flooding and side-channels. Deepening of the riverbed due to send accumulation behind the dams of hydropower stations in Austria, however, has resulted in ...
Voir le projet

 9

 TERMINÉ 

Restoration of Brackish Marsh for Root Vole, Waders and Terns (Brackish Marsh)

Date du début: 31 juil. 2006, Date de fin: 31 mai 2011,

...n the late 1990s the Dutch government, the province of Zeeland and local organisations started a joint restoration programme. Its focus is the restoration of estuarine gradients between estuarine, river and inland habitats, the protection of tidal salt marshes including sand flats against erosion, and the restoration of the inland brackish marshes. This LIFE project was part of this programme: It ...
Voir le projet

 3

 TERMINÉ 
... improved. Pumping, sanitation and the partial distribution of water extracted unnecessarily, along with repair and maintenance work, add to environmental damage. The project was located in the Arno river plain, upstream of the town of Pisa. It includes a significant water district consisting of some 1 000 km of network pipes supplying water to nine municipalities. Approximately 95% of the water ...
Voir le projet

 4

 TERMINÉ 
Background The ‘Alam-Pedja’ Natura 2000 site is situated by the Emajõgi River and contains numerous oxbow lakes and meanders. All species of Estonian freshwater fish have been found in this area, and for asp (Aspius aspius), spined loach (Gobitis taenia), Eurasian weather loach (Misgumus fossilis) and European bullhead (Cottus gobio), it is the key h ...
Voir le projet

 3

 TERMINÉ 

Irfon Special Area of Conservation Project (ISAC 08)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

Background The River Wye has historically been the most productive river in Wales for Atlantic salmon (Salmo salar). However, in recent decades numbers have declined to around 15% of previous levels. Though present throughout most of the river catchment, salmon are unable to survive in its strongly acidic headwaters. Many of the problems affecting the hea ...
Voir le projet

 3

 TERMINÉ 
Background The Lomme river basin is located in the Libin high plateau in the centre of the Ardennes in Belgium’s Walloon region. The Libin plateau sits between the Saint-Hubert and Croix-Scaille plateaux, both of which have benefited from LIFE restoration projects. The Lomme river basin is made up of a network of peaty and wetland habitats included in t ...
Voir le projet

 2

 TERMINÉ 
...in Belarus, with other major breeding populations in Poland and Ukraine. There is a small aquatic warbler breeding population in Lithuania (c. 100 pairs), principally located in the Neman river delta. Conservation and maintenance of aquatic warbler populations in a stable state on Lithuanian territory, which is situated on the periphery of the main distribution range, is not possible without mai ...
Voir le projet

 5

 TERMINÉ 
...ugh the Alfacada lagoon is a protected area, it was until recently a private estate used for hunting. It is also vulnerable to the effects of climate change on the water and sediment flux of the Ebro river, which has accelerated the rise in sea level and coastal erosion processes. Therefore specific management and restoration measures are necessary to mitigate these negative effects. The target ...
Voir le projet

 4

 TERMINÉ 
...lped to conserve the area’s valuable natural habitats, including species rich hay meadows, hydrophilous grassland and petrifying springs with tufa formation, hedgerows, and dry grasslands in the river valleys and outside the large forests. Boasting a wide variety of habitat types, occurring over a relatively small area, the area around Iphofen is one of the most species-rich in Bavaria. To date ...
Voir le projet

 4

 TERMINÉ 
Background River ecosystems throughout Europe have been severely impacted by engineering projects for flood protection, navigation, water supply and hydroelectricity. It is estimated that less than 20% of Europe’s rivers and floodplains are in their natural state. Sustainable river restoration, which re-establishes ecosystems and their functions, serves ...
Voir le projet

 6

 TERMINÉ 
...use contamination of the lake water generated by agricultural activity through a perimeter vegetation band; Prevention of lake silting by controlling sediments provided by the river network; Establishment of forest uses in the catchment basin in order to change the run-off dynamics of water, bringing it back to that existing before agricultural intensification; Re-establishment of the lake’s ...
Voir le projet

 4

 TERMINÉ 
Background Medium-sized and large rivers flowing through densely populated urban areas typically fall under more than one jurisdiction in Germany. The national level is guardian of waterways development and security, whilst the local municipality has responsibility for local requirements. Their interests can overlap and compete in the management of rivers ...
Voir le projet

 4

 TERMINÉ 
... Grassland habitats will be restored on 150 ha; Grazing as traditional habitat management will be established on 185 ha; Water and wetland habitats will be restored at six localities (3 000 m of river branches re-connected and/or restored, decrease of human disturbance will be achieved on 12 ha); Rocky habitats and caves will be targeted by restoration and protection measures on their whole are ...
Voir le projet

 5

 TERMINÉ 

Danube Network (Netzwerk Donau)

Date du début: 1 sept. 2011, Date de fin: 31 déc. 2017,

Background Some 352 km of the Danube flows through Austria. Its course has been shaped by measures taken to regulate the river flow, with the exception of the two sections in the Wachau and east of Vienna. The development of the Danube for hydroelectric power has additionally reshaped about 80% of its course. The dams have a significant ecological impact ...
Voir le projet

 1

 TERMINÉ 
The planned two bridges will play a crucial role in the crossborder transportinfrastructure connecting Busince and Nogradszakall as well as Vrdovka andOrhalom through the river. Theses bridges will promote and in the long termstrengthen the economic and social integration on this section of the border betweenHungary and Slovakia with the co-operation of Nógrád County and Banska Bystricadistrict. T ...
Voir le projet

 2