Rechercher des projets européens

10 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
... Sciences and Mathematics, University Ss. Cyril and Methodius, in Skopje, Republic of Macedonia has gained international recognition due to its scientific results and collaboration with distinguished research groups from European universities and research centres. It is nominated as a potential centre of excellence due to its competence supported by the fact that 28.3 % of all scientific papers pu ...
Voir le projet

 1

 TERMINÉ 

OceaNET

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

...ll aligned with the European Energy Strategic Plan and the Horizon 2020 programme.It aims at contributing to develop specific technologies and enabling technologies common to both energy sources. The research activities are structured in a number of research projects, which will provide the opportunity for a set of young researchers to be trained in first class European Research & Development (R&D ...
Voir le projet

 10

 TERMINÉ 

InnoEnergy Pathways

Date du début: 15 déc. 2012, Date de fin: 14 déc. 2017,

INNOENERGY PATHWAYS is addressed to experienced researchers and offers them the possibility of contributing to the development of the full range of projects within the KIC InnoEnergy.KIC InnoEnergy is one of the three Knowledge and Innovation communities selected by the European Institute of Technology. It is an innovation driven community gathering key actors of knowledge triangle: research organ ...
Voir le projet

 1

 TERMINÉ 
...ent demands of industrial companies, especially those involved in advanced manufacturing (CNC, virtual welding, robotics...).- Improve the access of companies, specially SMEs, to the knowledge of research and innovation centres to apply it to their own economic activity.- Increase cooperation between VET centres, research and innovation centres and companies, enhancing the triangle education-innov ...
Voir le projet

 6

 TERMINÉ 

Green Logistics e-Training in Cereal/Rice Sector

Date du début: 1 sept. 2015, Date de fin: 30 juin 2018,

...rs) in four Euro-med countries (Greece, Spain, Portugal & Cyprus), based on an extended survey detecting their training needs. Building on the integration of the knowledge triangle (higher education, research and business), a training requirements survey mapping the current skills & competencies profiles of the logisticians in alignment with the best practices provided by the cereal and rice secto ...
Voir le projet

 6

 TERMINÉ 
...aditional policy division of competencies and traditional industries:demographic trend demands innovative policy approach,strengthening creative interaction in the knowledge triangle(business-private-research);from economic point of view,intelligent home solutions means cutting local edge techn- and system-level approach to design new electromechanical systems merging mechanical,electrical control ...
Voir le projet

 15

 TERMINÉ 
The objective of the caLIBRAte project is to establish a state-of-the-art versatile Risk Governance framework for assessment and management of human and environmental risks of MN and MN-enabled products. The framework will be a web-based “system-of-systems” linking different models and methods for: 1) screening of apparent and perceived risks and trends in nanotechnology, 2) control banding, quali ...
Voir le projet

 26

 TERMINÉ 

Safety Evaluation of Adverse Reactions in Diabetes (SAFEGUARD)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2015,

"In 2010 a widely marketed drug for the treatment of type 2 diabetes (T2DM) (rosiglitazone) was taken from the market as it was associated with an increased risk of myocardial infarction, a T2DM complication it was actually supposed to prevent. This example shows several things. First, the approval requirements do not guarantee a longer term positive benefit risk profile. Second, large scale postm ...
Voir le projet

 19

 TERMINÉ 

Pan European Grid Advanced Simulation and state Estimation (PEGASE)

Date du début: 1 juil. 2008, Date de fin: 30 juin 2012,

...gh and Extra High Voltage transmission and sub-transmission networks in Europe (designated as ETN) and implemented by a Consortium composed of 20 Partners including TSOs, expert companies and leading research centre’s in power system analysis and applied mathematics. Its overall objectives are to define the most appropriate state estimation, optimization and simulation frameworks, their performanc ...
Voir le projet

 25

 TERMINÉ 

Safety Of non-Steroidal anti-inflammatory drugs (SOS)

Date du début: 1 nov. 2008, Date de fin: 30 avr. 2012,

"The Safety Of non-Steroidal anti-inflammatory drugs (SOS) proposal aims to assess the relative cardiovascular (CVD) and gastrointestinal (GI) safety of non-steroidal anti-inflammatory drugs (NSAIDs). The NSAIDs are divided in traditional NSAIDs (tNSAIDs) and the newer COX-II inhibitors(coxibs). The aim will be fulfilled by a two-phase approach comprising systematic reviews and synthesis of CVD an ...
Voir le projet

 11