Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Single European Secure Air-cargo Space (EUROSKY)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2017,

EUROSKY will deliver a high impact programme for advanced air-cargo security and facilitation measures to safeguard international supply chains and the security of citizens while fostering international co-operation and a broad stakeholder engagement from all segments of the air-cargo industry.The main outputs will be:1. The EUROSKY Blueprints to provide a Europe wide cooperative model for air car ...
Voir le projet

 24

 TERMINÉ 
Network operators are looking for cost effective solutions to manage and upgrade their networks to meet the user experience demanded by European citizens. The backhauling infrastructure is becoming a bottleneck.E3Network will design an E-band transceiver for the backhaul infrastructure of the future networks. It will work in the E-band, which enables highly focused "pencil beam" transmissions and ...
Voir le projet

 9

 TERMINÉ 

Biometrics Evaluation and Testing (BEAT)

Date du début: 1 mars 2012, Date de fin: 29 févr. 2016,

"Identity management using Biometrics is deployed in a growing number of applications ranging from identification platforms (e.g. biometric passports) to access control systems for border checks or banking transactions.Unfortunately, the reliability of these technologies remains difficult to compare. There are no european-wide standards for evaluating their accuracy, their robustness to attacks or ...
Voir le projet

 11

 TERMINÉ 

Innovative Reliable Chip Designs from Low-Powered Unreliable Components (i-RISC)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2016,

The ongoing miniaturization of data processing and storage devices and the imperative of low-energy consumption can only be sustained through low-powered components. Lower supply voltages and variations in technological process of emerging nanoelectronic devices make them inherently unreliable. As a consequence, the nanoscale integration of chips built out of unreliable components has emerged as ...
Voir le projet

 6

 TERMINÉ 
d-LIVER applies scenario-driven development methodologies to address an unmet need for bio-artificial liver support via continuous detoxification as remote transient therapy at the Point-of-Need. The liver is a complex organ with various vital functions in synthesis, detoxification and regulation; its failure is life-threatening and the only curative treatment is transplantation. Whilst awaiting t ...
Voir le projet

 15

 TERMINÉ 
Recent years have seen a rapidly growing demand from aeronautic industry regarding function-oriented, highly integrated, energy-efficient and lightweight structures. In advanced composites a promising material was found, which integrates these characteristics allowing for continuously elevating the complexity of new components concerning shape and internal structure. The consequences of this incre ...
Voir le projet

 12

 TERMINÉ 

Holistic Approaches for Integrity of ICT-Systems (HINT)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

The security of modern ICT (Information and Communication Technologies) systems relies fundamentally on the integrity of hardware components. This is the case for user identification and authentication as in smartcards, e-Id, e-Passports, e-health devices or for the integrity checking of computers and mobile systems as in trusted computing and TPMs. But it is also the case for telecommunication i ...
Voir le projet

 9

 TERMINÉ 
There is a continued need for higher compute performance: scientific grand challenges, engineering, geophysics, bioinformatics, etc. However, energy is increasingly becoming one of the most expensive resources and the dominant cost item for running a large supercomputing facility. In fact the total energy cost of a few years of operation can almost equal the cost of the hardware infrastructure. En ...
Voir le projet

 14

 TERMINÉ 

Self adaptive heterogeneous manycore based on Flexible Tiles (FlexTiles)

Date du début: 15 oct. 2011, Date de fin: 14 avr. 2015,

Description To develop an energy-efficient programmable heterogeneous manycore platform with self-adaptive capabilities that apply to cognitive radio, video processing, embedded devices and ambient computingA major challenge in computing is to leverage multi-core technology to develop energy-efficient high performance systems. This is cri ...
Voir le projet

 12

 TERMINÉ 

Wireless charging for Electic Vehicles (UNPLUGGED)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2015,

UNPLUGGED project aims to investigate how the use of inductive charging of Electric Vehicles (EV) in urban environments improves the convenience and sustainability of car-based mobility. In particular, it will be investigated how smart inductive charging infrastructure can facilitate full EV integration in the urban road systems while improving customer acceptance and perceived practicality. UNPLU ...
Voir le projet

 17

 TERMINÉ 

ICT-enabled Wearable Artificial Kidney and Personal Renal Care System (NEPHRON+)

Date du début: 1 avr. 2010, Date de fin: 31 déc. 2014,

Description Renal patients can stay at home with wearable, artificial kidney.NEPHRON+ aims to provide a major leap forward in renal care: The project experts are developing a wearable artificial kidney for on-body blood purification - a next generation, integrated solution for personalized treatment and management of patients with chronic ...
Voir le projet

 10

 TERMINÉ 
Description SPADnet aims to develop a new generation of smart, CMOS-based large area networked image sensors for photon-starved biomedical applications, build ring-assembly modules for Positron Emission Tomography (PET) imaging, and carry out performance tests in a PET system evaluation testbed.While suited to applications offering repetitiv ...
Voir le projet

 9

 TERMINÉ 

SCUBA - Self-organising, Cooperative, and robUst\n Building Automation (SCUBA)

Date du début: 1 nov. 2011, Date de fin: 31 déc. 2014,

Large scale embedded Monitoring and Control (M&C) systems in energy management, transporta-tion, security and safety often co-exist alongside each other with little cooperation within and among heterogeneous systems which hampers the increasing demand to operate the whole system optimally. A good example is building management, a market worth in excess of $36 billion annually by 2015, where a wide ...
Voir le projet

 9

 TERMINÉ 

uBiquitous, secUre inTernet-of-things with Location and contExt-awaReness (BUTLER)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Voir le projet

 23

 TERMINÉ 

Smart miniature low-power wireless microsystem for Body Area Networks (WiserBAN)

Date du début: 1 sept. 2010, Date de fin: 30 sept. 2014,

The WiserBAN project will create an ultra-miniature and ultra low-power RF microsystem for wireless Body Area Networks (BAN) targeting primarily wearable and implanted devices for healthcare, biomedical and lifestyle applications.The proposed research concerns the extreme miniaturization of the BAN with primarily the areas of ultra low-power radio SoC (System on Chip), RF and Low-frequency MEMS, m ...
Voir le projet

 14

 TERMINÉ 

EM safety and Hazards Mitigation by proper EV design (EM-Safety)

Date du début: 1 mai 2011, Date de fin: 30 avr. 2014,

The project aims at increasing the public confidence in the safety regarding electromagneticfields (EMF) in the fully electric vehicles (FEV).Public expectations to move towards the electrification of road transport are driven by a multitudeof factors and concerns including: climate change, primary energy dependence and public healthas well as cost and scarcity of raw materials. Road transport rem ...
Voir le projet

 11

 TERMINÉ 

Smart and Efficient Location, idEntification, and Cooperation Techniques (SELECT)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2014,

The project focus on studying innovative solutions enabling high-accuracy detection, identification, and location of objects/persons equipped with small ultra-low power tags using a network of intelligent self-configuring radio devices. Network functionalities will be enhanced to include the detection and tracking of moving objects/persons without tags eventually present in the same area.To achiev ...
Voir le projet

 9

 TERMINÉ 
The malevolent use of Anthrax spores on civilians in late 2001 has shown the necessity to protect European citizens from criminal use of biological agents and viruses. Although these attacks had been punctual and crude, more sophisticated attacks on dozens or hundreds of injured or killed people are conceivable. When launching such an attack its success depends on concentrating a sufficient amount ...
Voir le projet

 9

 TERMINÉ 
"Citizens are getting older and are increasingly living with chronic diseases, because although their health condition is better than that of earlier generations, they live longer helped by advanced medical care ending up to chronic conditions and minor disabilities well manageable by home care. This has highlighted shared concerns by regional Governments about implications for future provision of ...
Voir le projet

 42

 TERMINÉ 
The emerging System-of-Systems (SoS) concept describes the large scale integration of many independent self-contained systems to satisfy global needs or multiple requests. The increasing number of interacting (mostly embedded) systems in our strongly connected society and industry as well as the growing overall complexity of systems have triggered a paradigm shift and the need to enhance the class ...
Voir le projet

 7

 TERMINÉ 

Internet of Things Architecture (IoT-A)

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

Description The Lighthouse Project IoT-A proposes the creation of an architectural reference model for the IoT as well as the definition of a set of key building blocks to lay the foundation for a ubiquitous IoT.There has been much hype about the “Internet of Things”. The idea of a globally interconnected continuum of devices, objects and ...
Voir le projet

 20

 TERMINÉ 

SmartSantander

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

SmartSantander proposes a unique in the world city-scale experimental research facility in support of typical applications and services for a smart city. Tangible results are expected to greatly influence definition and specification of Future Internet architecture design from viewpoints of Internet of Things and Internet of Services.This unique experimental facility will be sufficiently large, op ...
Voir le projet

 24

 TERMINÉ 
The overall objective of FoodMicroSystems is to initiate the implementation of microsystems & smart miniaturised systems in the food sector by improving cooperation between suppliers and users of microsystems for food/beverage quality and safety. The project has five specific objectives:1.\tTo improve the coordination of national and EU programmes for the development of food applications2.\tTo fac ...
Voir le projet

 13

 TERMINÉ 

Wireless Hybrid Enhanced Mobile Radio Estimators - Phase 2 (WHERE2)

Date du début: 1 juil. 2010, Date de fin: 31 oct. 2013,

The availability of position information plays an increasing role in wireless communications networks already today and will be an integral part of future systems. They inherently can offer the ability for stand-alone positioning especially in situations where conventional satellite based positioning systems such as GPS fail (e.g., indoor). In this framework, positioning information is an importan ...
Voir le projet

 17

 TERMINÉ 
Energy storage is recognised as a key element for energy networks in the near future. Regarding short-term power delivery and high duty cycle applications, such as stabilization of grids, traction networks and drive-trains of hybrid or full-electric vehicles, it is widely accepted that the use of energy storage systems (ESS) can lead to energy savings. This kind of networks needs ESS capable of st ...
Voir le projet

 7

 TERMINÉ 
"The objective of POLLUX is to develop a distributed real time embedded systems platform for next generation electric vehicles, by using a component and programming-based design methodology. Reference designs and embedded systems architectures for high efficiency innovative mechatronics systems will be addressed with regard to requirements on composability, networking, security, robustness, diagno ...
Voir le projet

 37

 TERMINÉ 
The goal of OUTSMART is to contribute to the Future Internet (FI) by aiming at the development of five innovation eco-systems. These eco-systems facilitate the creation of a large variety of pilot services and technologies that contribute to optimised supply and access to services and resources in urban areas. This will contribute to more sustainable utility provision and, through increased effici ...
Voir le projet

 29

 TERMINÉ 

Quality of Service and MObility driven cognitive radio Systems (QoSMOS)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

QoSMOS is a 3-year Integrated Project that aims at researching, developing and integrating a Cognitive Radio (CR) framework to enable mobile broadband systems to improve utilisation of licensed and/or unlicensed bands, by adding dynamic exploitation of under-utilised spectrum. The technical focus is on opportunistic use of spectrum combined with managed Quality of Service (QoS) and seamless mobili ...
Voir le projet

 15

 TERMINÉ 
The promise of a truly mobile experience is to have the freedom to roam around anywhere and not be bound to a single location. However, the energy required to keep mobile devices connected to the network over extended periods of time quickly dissipates. In fact, the operational time, has been identified as the number one criteria by the majority of the consumers purchasing a mobile device. Moreove ...
Voir le projet

 11

 TERMINÉ 
Electronic devices of the latest generations, being those integrated circuits or discrete components, are often required to operate in harsh environmental conditions, where the temperature may reach over hundred degrees centigrade. Obviously, this has negative impact on several parameters of the electronic devices, ranging from slow-down and transient, recoverable errors to permanent failures and ...
Voir le projet

 21

 TERMINÉ 

Internet of Things Initiative (IoT-i)

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2012,

Internet of Things (IoT) is one of the most important areas of a Future Internet with significant potential to positively impact European economy and society. The current IoT research community is however highly fragmented, featuring diverging approaches and technologies. This inevitably leads to a lack of coherency that hinders the realisation of an interoperable IoT, preventing the IoT to achiev ...
Voir le projet

 17

 TERMINÉ 

Access to research results on semiconductor design (R&D ACCESS)

Date du début: 1 nov. 2009, Date de fin: 31 oct. 2012,

The objective of the R&D ACCESS proposal is to identify R&D results on semiconductor design from FP7 projects and to provide these results to partners from outside the consortia. The R&D results are divided into four categories: 1) Training and Education, 2) Intellectual Properties, 3) Design Tools and 4) Design Methodologies.A dissemination platform will facilitate the access to project results g ...
Voir le projet

 5

 TERMINÉ 

Unobtrusive wearable human to machine wireless interface (Wear-a-BAN)

Date du début: 1 juin 2010, Date de fin: 31 oct. 2012,

The objective of Wear-a-BAN is to investigate and demonstrate ultra low-power wireless body-area-network (WBAN) technologies for enabling unobtrusive human to machine interfaces (HMI) into SME-driven market segments of smart fabrics / interactive textiles (SFIT), robotics for augmented reality assistance and rehabilitation, and natural interfacing devices for video gaming. The proposed research wi ...
Voir le projet

 16

 TERMINÉ 

Broadband Evolved FEMTO Networks (BeFEMTO)

Date du début: 1 janv. 2010, Date de fin: 31 juil. 2012,

BeFEMTO is a timely proposal to address broadband communications, an important stimulus to the European economy. It aims to research and develop evolved femtocell technologies that accelerate cost-effective provision of ubiquitous broadband services by smoother convergence between fixed and wireless broadband.The approach adopted is pragmatic in two ways: near-term solutions as enabler for early d ...
Voir le projet

 14

 TERMINÉ 

Advanced Radio Interface Technologies for 4G Systems (ARTIST4G)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

The first 3GPP Long Term Evolution standard version is complete and ready to be deployed. Although it increases peak data rate and spectral efficiency compared to legacy techniques, cell-edge and average user throughputs are still significantly lower than the peak rates. In the LTE-Advanced Study Item, ways to extend LTE are being explored. However, some of the considered techniques are complex an ...
Voir le projet

 18

 TERMINÉ 

Energy Aware Radio and neTwork tecHnologies (EARTH)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

Telecommunication networks and in particular mobile communications are increasingly contributing to global energy consumption. The EARTH proposal tackles the important issue of energy saving by enhancing the energy efficiency of mobile broadband systems thereby reducing CO2 emissions. It is a highly ambitious and unique proposal, applying an integrated approach to investigate the energy efficiency ...
Voir le projet

 15

 TERMINÉ 

Seamless Communication for Crisis Management (SECRICOM)

Date du début: 1 sept. 2008, Date de fin: 30 avr. 2012,

"SECRICOM is proposed as a collaborative research project aiming at development of a reference security platform for EU crisis management operations with two essential ambitions: (A) Solve or mitigate problems of contemporary crisis communication infrastructures (Tetra, GSM, Citizen Band, IP) such as poor interoperability of specialized communication means, vulnerability against tapping and misuse ...
Voir le projet

 14

 TERMINÉ 

MEMS ATOMIC CLOCKS FOR TIMING, FREQUENCY CONTROL AND COMMUNICATIONS (MAC-TFC)

Date du début: 1 sept. 2008, Date de fin: 29 févr. 2012,

Atomic clocks provide enhanced accuracy, stability, and timing precision compared to quartz-based technologies. However, the size and power consumption of existing atomic clocks far exceeds that those of quartz-based clocks, not preventing their deployment in portable applications.The goal of the MAC-TFC proposal is to develop and demonstrate all the necessary technology to achieve an ultra-miniat ...
Voir le projet

 12

 TERMINÉ 

Cooperative Hybrid Objects in SEnsor Networks (CHOSEN)

Date du début: 1 juin 2008, Date de fin: 30 nov. 2011,

CHOSeN will develop appropriate technology, including advanced configurable RF and digital baseband transceiver hardware, networking protocols with scalable Quality of Service in respect of transmission speed, robustness, security, and low-power support, and a generic collaboration middleware that abstracts from the diversity and heterogeneity provided by the layers below, and it will thereby impr ...
Voir le projet

 11

 TERMINÉ 
In Medicine and Biology a fast, low cost and accurate analysis of samples, such as cancerous tissues or bio-molecules is of crucial importance. Nowadays, several medical instruments making use of different regions of the electromagnetic spectrum are available to carry out analysis of samples, but their size, complexity and cost remain very high. Moreover, not all the regions of the electromagnetic ...
Voir le projet

 6