Rechercher des projets européens

39 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...s (Ávila), which has serious problems of euthophication, the Confederación Hidrográfica del Duero is fostering the implementation of a similar system; The Spanish Ministry of Environment and the Regional Government of Castilla-León are weighing up the implementation of a strategy inspired by the project in Sanabria Lake Natural Park (the largest glacial lake in Spain); The Provincial Council ...
Voir le projet

 1

 TERMINÉ 
...vel of separate collection is essential. However, WEEE collected in Slovenia has been lagging behind the collection target set by the European Union. The beneficiary previously established, with the Ministry of the Environment and Spatial Planning, a system for the collection and further treatment and recovery of WEEE. However, there is still significant potential for increasing collection rates ...
Voir le projet

 1

 TERMINÉ 
...howed that at least one wildcat migrated between these sites using a green corridor. Following on from the LIFE project, the Wildcat Leap Project, sponsored by the German Federal Environment Ministry, provides the opportunity to protect the wildcat in the long-term. Moreover, the Pathway Plan for the Wildcat has been incorporated in the state development plans of Hesse and Thuringia. The right pla ...
Voir le projet

 8

 TERMINÉ 

Inventories and planning for the marine Natura 2000 network in Finland (FINMARINET)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2013,

... habitats and species. Other planned actions included supporting the implementation and proposed extension of the Natura 2000 network in marine areas through the production of new information for the Ministry of the Environment; the construction of an Internet-based information service to provide marine spatial data and information for experts and the general public; and to raise public awareness ...
Voir le projet

 6

 TERMINÉ 

LIFE Capacity Building Slovenia (LIFE CB SI)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2018,

...-based approach to tackling environmental challenges. Expected results: Through this capacity building project and its training activities, newly-recruited and existing personnel in the Slovenian Ministry of Environment and Spatial Planning will gain much-needed experience, knowledge and know-how in LIFE project planning, implementation and evaluation processes. This will consist of activities ...
Voir le projet

 1

 TERMINÉ 
...h level of separate collection is essential. However, WEEE and WPBA collection in Slovenia has lagged behind the collection target set by the European Union. The beneficiary has established, with the Ministry of the Environment and Spatial Planning, a system for the collection and further treatment and recovery of WEEE and WPBA. However, there is still significant potential for increasing collecti ...
Voir le projet

 1

 TERMINÉ 
...f the Waste Communication Platform and extension of hazwaste cooperation activities throughout the BSR was developed and backed by the provision of an interim 12-month solution – sponsored by the Ministry of the Environment of Schleswig-Holstein - to host ongoing cooperation until new funding resources are found.
Voir le projet

 7

 TERMINÉ 

Bioenergy Technology Transfer Network (BTN)

Date du début: 4 juin 2002, Date de fin: 3 sept. 2005,

...e been organised. Seminar on Bioenergy Interacting between Rural and Urban Areas attracted participants from several countries. The keynote speaker of the seminar was Minister Mauri Pekkarinen, Ministry of Trade and Industry of Finland.The resources, production and use of bioenergy in partner regions have been analysed and bottlenecks in the chain of bio energy utilization have been identified. Th ...
Voir le projet

 7

 TERMINÉ 

Network of European Delta Regions - Sustainable Delta Governance (DeltaNet)

Date du début: 28 févr. 2010, Date de fin: 27 févr. 2013,

...f contaminated dredged material of the Elbe river (Germany) and its posterior deposition ashore. From the beginning of the 80s, a project was commissioned with the aid of the German Federal Ministry of Research and Technology. This project concerned the construction of the METHA I test plant (MEchanical Treatment and dewatering of HArbour sediments), and the METHA II pilot plant. The METHA plant i ...
Voir le projet

 9

 TERMINÉ 
Background The Slovenian sea is home to a significant portion (11.4 % or around 2 000 individuals in non-breeding period) of the biogeographical population of Mediterranean shag (Phalacrocorax aristotelis desmarestii). Other seabirds, such as the Mediterranean shearwater (Puffinus yelkouan) and Mediterranean gull (Larus melanocephalus) can also be found h ...
Voir le projet

 3

 TERMINÉ 

Capitalising Climate Change Knowledge for Adaptation in the Alpine Space (C3-Alps)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

C3-Alps will synthesize, transfer and implement in policy and practice results of previous Alpine Space projects on climate change adaptation. The capitalisation approach aims at a) generating new and directly usable forms of state-of-the-art synthesis adaptation knowledge in the Alps, harmonised across sectors and useful to adaptation decision-makers, b) its effective and tailor-made communicatio ...
Voir le projet

 17

 TERMINÉ 
Rivers in SEE region are often threatened by unsustainable use, increasing human pressure, and problems of increased floods and droughts driven by climate change. Inhabitation of floodplain areas, hydropower utilization, navigation, gravel and sand extraction, unsustainable tourism etc. lead to changes in morphology, increased pollution, degradation of aquatic habitats, as well as land use conflic ...
Voir le projet

 15

 TERMINÉ 
The Alpine and the Carpathian Conventions state sustainable tourism mobility as a challenge and call for cooperation on this topic among the countries of these mountain regions. In particular sustainable tourist mobility is not well-developed in mountainous regions, especially in South-East Europe, as mountain regions are lacking sufficient sustainable transport facilities and facing major ecologi ...
Voir le projet

 32

 TERMINÉ 
The EU territory has an enormous under-valorised natural asset: marginal terrains (exhausted landfills, mines & quarries, brownfields & contaminated terrains, former military sites, etc). The project aims at re-qualifying marginal areas through investments programmes that focus on the installation of RES (PV, Wind, Biomass, geothermal, biogas, etc) that will contribute to a significant amount of r ...
Voir le projet

 14

 TERMINÉ 
BIOREGIO Carpathians is aimed at enhancing the integrated management of the Carpathians protected areas and natural assets in a transnational context and thereby increase the attractiveness of the region. The Carpathians, the largest mountain range of Europe, harbour a unique natural heritage and act as a major ecological link within Europe. Experiences e.g. from the Alpine Space demonstrate that ...
Voir le projet

 24

 TERMINÉ 
The ESPONTrain Project is aiming at making ESPON2013 knowledge operational in a coordinated and transnational way for practical use at regional and local level, and translating ESPON Europe-wide information and findings to the regional/local level. Specifically, the project is aiming at: •Stimulating a transnational educational and training ESPON activity facilitated by both an e-learning procedur ...
Voir le projet

 10

 TERMINÉ 

Sustainable flood management strategies for cross border river basins (FLOOD-WISE)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

Meuse, Roer, Elbe, Sava, Western Bug and Tisza-Somes) represented by 15 selected partners. Overall objective of the project is identification, sharing and transfer of good practices on sustainable cross-border flood management in European river basins, using the instruments of the FRMD. Therefore, the project is divided in three phases, following the steps of the FRMD and addressing the three diff ...
Voir le projet

 12

 TERMINÉ 

Transalpine Transport Architects (TRANSITECTS)

Date du début: 30 juin 2009, Date de fin: 29 juin 2012,

In TRANSITECTS public institutions design common transnational intermodal solutions for freight transport in the Alpine Space. In the partnership different interests (economy, environment and transport) are integrated which is of crucial importance for a sustainable solution. Main aim of the project is to make the rail network more attractive and hence to foster its accessibility and functionality ...
Voir le projet

 16

 TERMINÉ 
SEE HYDROPOWER is based on the European Directive on the promotion of Electricity from Renewable Energy Sources (RES-e) respect to the Kyoto protocol targets, that aims to establish an overall binding target of 20% share of renewable energy sources in energy consumption and a 10% binding minimum target for biofuels in transport to be achieved by each Member State, as well as binding national targe ...
Voir le projet

 18

 TERMINÉ 

Climate Change and Impacts on Water Supply (CC-WaterS)

Date du début: 30 avr. 2009, Date de fin: 29 avr. 2012,

Climate change (CC) affects fresh water resources and may have significant influence on public drinking water supply. Land use activities exert pressure on water resources and will change according to CC. It is crucial for safeguarding future water supply to anticipate these climate and land use changes and to assess their impacts on water resources. Transnational action is needed to prepare SEE f ...
Voir le projet

 18

 TERMINÉ 

ESPON in Integrated Territorial Strategies (INTERSTRAT)

Date du début: 31 janv. 2010, Date de fin: 29 févr. 2012,

The aim of this project is to encourage and facilitate the use of ESPON findings in the creation and monitoring of integrated territorial development strategies and to support transnational learning about the actual and potential contribution of ESPON to integrated policy-making. Its focus is active learning, using ESPON analysis and related data in the development of integrated territorial develo ...
Voir le projet

 9

 TERMINÉ 
Based on existing partnership among Protected Areas (PA) along the river Danube the "Danube River Network of Protected Areas" will be established in accordance with the appeal launched by the "Declaration of Tulcea" in April 2007 (http://www.ramsar.org/mtg/mtg_danube_regional_2007a.htm). For the first step, the partnership includes 10 PAs from 6 Danube countries, additional partners (e.g. in Germa ...
Voir le projet

 23

 TERMINÉ 
BACKGROUND and addressed PROBLEM: Climate change, with its manifold aspects, is one of the biggest global challenges we face currently and in the future. Guidelines for the general direction of action developed on the international or national level are a first step but do not equal implementation. Concrete action in dealing with climate change issues is required on the local and regional level, f ...
Voir le projet

 23

 TERMINÉ 

Climate Change: Impacts, Costs and Adaptation in the Baltic Sea Region (BaltCICA)

Date du début: 31 déc. 2008, Date de fin: 23 janv. 2012,

Climate change was recognized not only in terms of mitigation but also because of the need of adaptation as a major challenge that cannot be solved solely by single actors and territorial restricted actions, but asks for a coordination and support at a higher level. This is highlighted by the EU Green Paper on Adaptation to Climate Change, but also by other documents such as the EC Thematic Strate ...
Voir le projet

 24

 TERMINÉ 
PAYS.MED.URBAN understands high quality of landscape as a key factor of sustainability and competitiveness of urban areas. High quality of landscape is not only important for the identity, the ecological health and the quality of life of urban areas but also is a key factor of the attractiveness and distinctiveness of these areas. For this reason, it is an territorial capital and soft locational f ...
Voir le projet

 15

 TERMINÉ 

Climate Change Adaptation by Spatial Planning in the Alpine Space (CLISP)

Date du début: 31 août 2008, Date de fin: 30 août 2011,

Climate change impacts, esp. growing risks from natural hazards, increasingly threaten settlements, infrastructure, lives and future development in the Alpine Space. CLISP aims at preventing increasing climate change-related spatial conflicts, vulnerability, damages and costs by providing "climate proof" spatial planning solutions as a substantial basis for future sustainable territorial developme ...
Voir le projet

 14

 TERMINÉ 
The aim of NATREG project is to acknowledge, realise and promote the potentials of natural assets and protected areas (PA) (e.g. Natura 2000, IBA, parks, nature reserves etc.) as drives rather than obstacles for sustainable regional development. This aim will be achieved through the establishment of trans-national and multi-sectorial cooperation network which will develop the "Joint Strategy for I ...
Voir le projet

 12

 TERMINÉ 
The countries and regions located along the Danube river are in need of planning co-ordination regarding spatial development. The insufficient availability of information for planning is a severe constraint regarding investments in the regions. This can be overcome by a development strategy involving various Danube countries. Already in the period from 1997 to 2002 a comprehensive strategy for the ...
Voir le projet

 10

 TERMINÉ 
...itizens' identities. Parks&Economy brings together public authorities responsible for the management of nature and national parks, local NGO partners and scientific institutions as well as a national ministry. The project targets actors within the eight involved park areas, such as park authorities and environmental organisations, as well as other stakeholders, such as business representatives, NG ...
Voir le projet

 14

 TERMINÉ 
The Trans-European railway Rail Baltica, linking Helsinki – Tallinn – Riga – Kaunas – Warsaw and continuing on to Berlin, is to be developed within the territories of the co-operating EU Member States.The Interreg IIIB project Rail Baltica had two main goals: (a) the definition of the most favourable route for the Rail Baltica railway link in terms of spatial planning and regional development, and ...
Voir le projet

 23

 TERMINÉ 
Effective public sector action is a cornerstone of spatially balanced and sustainable development in the Baltic Sea Region. Especially rural areas need administrative support for compensating lower economic potentials for the benefit of their population. ASAP created innovative solutions to meet the most urgent challenges for rural development in the Baltic Sea Region in an integrated way: Demogra ...
Voir le projet

 38

 TERMINÉ 
The topics of spatial planning and sustainable spatial development are only seldom considered in the curricula of primary and secondary schools. One consequence is a lack of knowledge of the general public about spatial planning and the value of space. Citizens only rarely assume an active role in discussions concerning spatial issues. However, spatial planning should be based on both expert decis ...
Voir le projet

 9

 TERMINÉ 
The project aims to connect planners and stakeholders in different regions to study and discuss good and bad practice in relation to built heritage. The project will specifically focus on built heritage in rural areas and the urban-rural partnership, as well as cultural heritage as an instrument of regional development. ...
Voir le projet

 14

 TERMINÉ 

moting Spatial Development by Creating COMon MINdscapes (COMMIN)

Date du début: 31 août 2004, Date de fin: 30 août 2007,

Transnational and cross-border co-operation have a growing need (e.g. EU-enlargement) for a precise understanding of the partner’s concepts and the planning systems they are embedded in. The improvement of solving similar problems in different BSR countries and on transnational activities can best be achieved by exchange of experiences and ideas, mutual training and further education as well as pr ...
Voir le projet

 28

 TERMINÉ 

Restoring and conserving habitats and birds in Skocjanski Zatok N.R. (DOPPS)

Date du début: 1 juil. 2001, Date de fin: 30 juin 2007,

Background Situated between the harbour and the centre of the city of Koper, the third largest city in Slovenia, the Skocjanski zatok nature reserve is the only large brackish wetland in the country. Thirty years ago the brackish lagoon, with its shallow water areas and mudflats, its reed beds and meadows, provided food and shelter for 41% of all amphibia ...
Voir le projet

 2

 TERMINÉ 
REPUS focuses on new EU Member States and addresses the challenge of a more balanced and sustainable urban development. The European Spatial Development Perspective (ESDP) points out that urban polycentric systems are essential for a balanced and sustainable economic development of Europe. The main aim of the project is to build a Regional Polycentric Urban System (REPUS) in Central-Eastern Europe ...
Voir le projet

 6

 TERMINÉ 

Establishing long-term protection of Crex crex in Slovenia (Crex Slovenia)

Date du début: 1 janv. 2004, Date de fin: 31 mars 2007,

...d wet grassland birds in priority Natura 2000 sites. This scheme falls within the Rural development Programme for the Republic of Slovenia 2007- 2013 and was introduced in cooperation with the Ministry for Agriculture, Forestry and Food. The new scheme offers new incentives to farmers for Corncrake habitat management in key Natura 2000 sites. To increase the potential habitat for Crex crex, plots ...
Voir le projet

 5

 TERMINÉ 

LAnners NETwork for CENtral and South East Europe (PLANET CENSE)

Date du début: 31 oct. 2003, Date de fin: 17 févr. 2007,

PLANET CENSE is a network of national spatial planning institutions and experts established as a consequence of the VISION PLANET project. It aims at pursuing and developing further the policy options laid down in the VISION PLANET project documents. The network will foster spatial integration and a cross-sector dialogue with: - The European Spatial Planning Gateway (ESP GATEWAY): an expert dialog ...
Voir le projet

 25

 TERMINÉ 

Territorial dimension of the Lisbon/Gothenburg Process (Lisbon strategy)

Date du début: 22 juil. 2004, Date de fin: 12 févr. 2007,

Studying the territorial dimension of the Lisbon/Gothenburg Agenda comprises a multitude of very complex and broad processes and contexts. It will neither be feasible to conduct an analysis of the impact of the Lisbon/Gothenburg strategy nor to embrace all factors of competitiveness.The main scope of the study is to develop a number of basic analytical elements that can introduce territorial cohes ...
Voir le projet

 6