Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

ERA-NET for materials research and innovation (M-ERA.NET 2)

Date du début: 1 mars 2016, Date de fin: 28 févr. 2021,

M-ERA.NET 2 aims at coordinating the research efforts of the participating EU Member States, Associated States and Regions as well as of selected global partners in materials research and innovation, including materials for low carbon energy technologies and related production technologies.A large network of 43 national and regional funding organisations from 23 EU Members States and Associated St ...
Voir le projet

 43

 TERMINÉ 

ACTivating InnoVative IoT smart living environments for AGEing well (ACTIVAGE)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2020,

ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Voir le projet

 50

 TERMINÉ 

Simulation Supported Real Time Energy Management in Building Blocks (Sim4Blocks)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2020,

The growing share of variable renewable energy necessitates flexibility in the electricity system, which flexible energy generation, demand side participation and energy storage systems can provide. SIMBLOCK will develop innovative demand response (DR) services for smaller residential and commercial customers, implement and test these services in three pilot sites and transfer successful DR models ...
Voir le projet

 17

 TERMINÉ 

Sustainable Market Actors for Responsible Trade (SMART)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

This Project aims to address an increasingly pressing global challenge: How to achieve the EU’s development goals and the UN’s Sustainable Development Goals, while meeting the global target of staying within two degrees global warming and avoid transgressing other planetary boundaries.EU policies must align with sustainable development goals (Article 11 TFEU). The impacts of climate change and glo ...
Voir le projet

 25

 TERMINÉ 

Analysis System for Gathered Raw Data (ASGARD)

Date du début: 1 sept. 2016, Date de fin: 29 févr. 2020,

ASGARD has a singular goal, contribute to Law Enforcement Agencies Technological Autonomy and effective use of technology. Technologies will be transferred to end users under an open source scheme focusing on Forensics, Intelligence and Foresight (Intelligence led prevention and anticipation). ASGARD will drive progress in the processing of seized data, availability of massive amounts of data and ...
Voir le projet

 34

 TERMINÉ 

ACTRIS PPP - Aerosols, Clouds and Trace gases Preparatory Phase Project (ACTRIS PPP)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The Research Infrastructure (RI) ACTRIS – Aerosols, Clouds and Trace Gases - is the pan-European RI that consolidates activities amongst European partners for observations of aerosols, clouds, and trace gases and for understanding of the related atmospheric processes, to provide RI services to wide user groups. ACTRIS is composed of 8 connected elements: distributed National Facilities (observatio ...
Voir le projet

 28

 TERMINÉ 

Ophthalmic OCT on a Chip (OCTCHIP)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

Silicon photonics is expected to leverage-off many of the advances made in CMOS electronics. International R&D efforts in this field have so far been mainly focused on the silicon-on-insulator (SOI) photonic integrated circuit (PIC) technology platform because it is predestined for datacom, high-performance computing and telecom applications. However, SOI based integrated optical waveguides cannot ...
Voir le projet

 7

 TERMINÉ 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Voir le projet

 43

 TERMINÉ 

Integrated Smart Spatial Exploration System (INSPEX)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

"The objective of INSPEX is to make obstacle detection capabilities that are currently only feasible on autonomous vehicles available as a personal portable/wearable multi-sensor, miniaturised, low power spatial exploration system. The INSPEX System will be used for real-time 3D detection, location and warning of obstacles under all environmental conditions in indoor and outdoor environments with ...
Voir le projet

 9

 TERMINÉ 
Life cycle cost of electricity generated by marine renewable technologies is determined by multiple factors including energy production capability, capital costs, and operating and maintenance (O&M) costs, as well as multiple other logistical, permitting, environmental, and finance cost factors. ORPC’s direct experience has been that operating and maintenance costs are dominant in the cost structu ...
Voir le projet

 5

 TERMINÉ 

Renewables in a Stable Electric Grid (RE-SERVE)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

Future energy systems will use renewable energy sources to minimise CO2 emissions. Currently large generators powered by fossil fuel turbines maintain the stability and quality of energy supplies through their inertia. The inertia of these generator-turbine groups gives providers a significant time window in which to react to network events. We urgently need to find ways to stabilise energy sys ...
Voir le projet

 11

 TERMINÉ 

Integrated Technology Ecosystem for ProACTive Patient Centred Care (ProACT)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2019,

ProACT targets Europe’s 50 million multimorbid patients to proactively self-manage and offset the EU’s annual €700billion cost of chronic disease management. ProACT aims at providing and evaluating an open application programming interface to integrate a variety of new and existing technologies to advance ‘home based’ integrated care (IC). Cloud based data analytics will determine correlations bet ...
Voir le projet

 14

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 
MOEEBIUS introduces a Holistic Energy Performance Optimization Framework that enhances current (passive and active building elements) modelling approaches and delivers innovative simulation tools which (i) deeply grasp and describe real-life building operation complexities in accurate simulation predictions that significantly reduce the “performance gap” and, (ii) enhance multi-fold, continuous op ...
Voir le projet

 17

 TERMINÉ 
The Marina proposal overall aim is to create an all-inclusive Knowledge Sharing Platform (KSP) catalysing and organising the convergence of already existing networks, communities, on-line platforms and services providing an online socio-technical environment that facilitates and stimulates the direct engagement of researchers, Civil Society Organisations (CSOs), citizens, industry stakeholders, po ...
Voir le projet

 14

 TERMINÉ 
Money underpins all terrorist activities (without money propaganda, training, recruitment, and support are less effective or null). The disruption of terrorist financing activity is a key element in any fight against terrorism.DANTE will deliver effective, efficient and automated data mining, analytics solutions and an integrated system to detect, retrieve, and analyse huge amounts of heterogeneou ...
Voir le projet

 18

 TERMINÉ 

Energy Efficient Optimised District Heating and Cooling (E2District)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2019,

Intelligent Energy Europe expects district heating to double its share of the European heat market by 2020 while district cooling will grow to 25%. While this expansion will translate into 2.6% reduction in the European primary energy need and 9.3% of all carbon emissions, it will not be achieved through modernization and expansion alone but requires fundamental technological innovation to make th ...
Voir le projet

 5

 TERMINÉ 
The TBVAC2020 proposal builds on the highly successful and long-standing collaborations in subsequent EC-FP5-, FP6- and FP7-funded TB vaccine and biomarker projects, but also brings in a large number of new key partners from excellent laboratories from Europe, USA, Asia, Africa and Australia, many of which are global leaders in the TB field. This was initiated by launching an open call for Express ...
Voir le projet

 49

 TERMINÉ 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2018,

...point for harmonisation and exploitation of research and technology for insuring the integrity of European food. Comprising an inner core of project participants from industry, academia, research institutes, technology providers and a global network of stakeholders, FOODINTEGRITY will rationalise and harmonise capability to provide a coherent structure and process for assuring the food supply.FOOD ...
Voir le projet

 64

 TERMINÉ 

Variety, Veracity, VaLue: Handling the Multiplicity of Urban Sensors (VaVeL)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

Urban environments are awash with data from fixed and mobile sensors and monitoring infrastructures from public, private, or industry sources. Making such data useful would enable developing novel big data applications to benefit the citizens of Europe in areas such as transportation, infrastructures, and crime prevention. Urban data is heterogeneous, noisy, and unlabeled, which severely reduces ...
Voir le projet

 10

 TERMINÉ 
Emerging evidence indicates that the gut microbiome contributes to our ability to extract energy from the diet and influences development and function of the immune, endocrine and nervous systems, which regulate energy balance and behaviour. This has led to hypothesize that developing microbiome-based dietary interventions can be cost-effective measures to prevent diet-related and behavioural diso ...
Voir le projet

 30

 TERMINÉ 

Models of Child Health Appraised (MOCHA)

Date du début: 1 juin 2015, Date de fin: 30 nov. 2018,

Children’s health affects the future of Europe – children are citizens, future workers, parents and carers. Children are dependent on society to provide effective health services (UN Convention on the Rights of the Child). Models of child primary health care vary widely across Europe based on two broad alternatives (primary care paediatricians or generic family doctors), and a variety of models of ...
Voir le projet

 20

 TERMINÉ 

Tools for cOntinuous building Performance Auditing (TOPAs)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2018,

As occupant behaviour can be considered as one of the main drivers of the performance gap, TOPAs will focus on reducing the gap from an operational perspective, hence supporting Post Occupancy Evaluation. Quantifying the performance gap is non-trivial, the performance gap is dependent on time and contextual factors, and individual buildings will have a particular performance gap. The delivery of e ...
Voir le projet

 9

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

...gical innovation and economic growth.To realise this vision, we have brought together a larger European consortium with about 150 partners in 23 countries. The partners represent academia, research institutes and industries, which work closely together in 15 technical work packages and five supporting work packages covering the entire value chain from materials to components and systems. As time p ...
Voir le projet

 158

 TERMINÉ 

Federated Interoperable Semantic IoT/cloud Testbeds and Applications (FIESTA)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

Despite the proliferation of IoT and smart cities testbeds, there is still no easy way to conduct large scale experiments that leverage data and resources from multiple geographically and administratively distributed IoT platforms. Recent advances in IoT semantic interoperability provide a sound basis for implementing novel cloud-based infrastructures that could allow testbed-agnostic access to Io ...
Voir le projet

 15

 TERMINÉ 

Strengthening joint programming in Europe (ERA-LEARN 2020)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

Building on the ERA-LEARN, NETWATCH & JPIs To Co Work predecessor projects ERA-LEARN 2020 will provide an integrated framework to make P2P more efficient and effective and support national and regional funding organisations in the preparation, implementation and monitoring of joint actions. ERA-LEARN 2020 will increase mutual learning within the P2P community and will thereby support the implement ...
Voir le projet

 11

 TERMINÉ 
5G will realise a true Internet of Things, a network capable of supporting potentially trillions of wireless connected devices and with overall bandwidth one thousand times higher that today’s wireless networks. Current 4G technology is approaching the limits of what is possible with this generation of radio technology and to address this, one of the key requirements of 5G will be to create a netw ...
Voir le projet

 11

 TERMINÉ 
Rapidly developing markets such as green construction, energy harvesting and storage, advanced materials for aerospace, electronics, medical implants and environmental remediation are potential key application targets for nanomaterials. There, nanotechnology has the potential to make qualitative improvements or indeed even to enable the technology. Impacts range from increased efficiency of energy ...
Voir le projet

 26

 TERMINÉ 
A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the developm ...
Voir le projet

 32

 TERMINÉ 

Sustainable Innovative Mobilisation of Wood (SIMWOOD)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

"SIMWOOD presents a novel idea for an innovative, integrated approach to multifunctional forestry and enhanced wood mobilisation across European forest regions. The project targets a multitude of forest owners and stakeholders to spread integrated, transferable solutions and viable policies to unlock immobile forest resources and ensure sustainable forest functions. A novel pan-European Informatio ...
Voir le projet

 29

 TERMINÉ 

Access CenTer for PHotonics innovAtion Solutions and Technology support (ACTPHAST)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

ACTPHAST is a unique "one-stop-shop" European access centre for photonics innovation solutions and technology support (Access CenTre for PHotonics innovAtion Solutions and Technology support). ACTPHAST will support and accelerate the innovation capacity of European SMEs by providing them with direct access to the expertise and state-of-the-art facilities of Europe's leading photonics research cent ...
Voir le projet

 29

 TERMINÉ 
Buildings Operational stage represents 80% of building’s life-cycle cost of which 50% is consequence of the energy use. Up to 90% of the buildings’ life cycle carbon emissions occur during their operational phase, mainly as consequence of the HVAC, lighting and appliances’ energy use. Therefore, energy and cost saving strategies addressing this building operation phase will have a major impact in ...
Voir le projet

 13

 TERMINÉ 

Take the energy bill back to the promised building performance (TRIBUTE)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

Today, Building Energy Performance Simulation (BEPS) analysis tends to show a large discrepancy with real energy performance. Most cases are due to gross mistakes rather than fundamental inadequacy of available technology and methods. The reasons are manifold. Highly simplified calculation methods are used far beyond their domain of validity. Assumed boundary conditions such as occupant behaviour ...
Voir le projet

 18

 TERMINÉ 

CI-NERGY Smart cities with sustainable energy systems (CI-NERGY)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

The CI-NERGY Marie Curie Initial Training Network (ITN) aims to train young scientists to develop urban decision making and operational optimisation software tools to minimise non-renewable energy use in cities. The training will be carried out by a close collaboration of six of the best academic research centres and four leading industrial companies from the energy and software technology sector ...
Voir le projet

 11

 TERMINÉ 

Fixed Point Open Ocean Observatories Network (FIXO3)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

The Fixed point Open Ocean Observatory network (FixO3) seeks to integrate European open ocean fixed point observatories and to improve access to these key installations for the broader community. These will provide multidisciplinary observations in all parts of the oceans from the air-sea interface to the deep seafloor. Coordinated by the National Oceanography Centre, UK, FixO3 will build on the s ...
Voir le projet

 29

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

MOINHOS II – Formar para Inovar

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

The Consortium MOINHOS was established in 2014 in order to participate in the Erasmus + by the following organisations: (1) Municipality of Torres Vedras, as leader of the Consortium, and vocational schools in the region, which assumed the role of sending entity: (2) Escola de Comércio e Serviços do Oeste (SEFO/ESCO), (3) Escola Profissional e Agrícola Fernando Barros Leal (EPAFBL), (4) Externato ...
Voir le projet

 42

 TERMINÉ 

Integrated Approaches to Food Allergen and Allergy Risk Management (IFAAM)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

Up to 20 million European citizens suffer from food allergy. However management of both food allergy (by patients and health practitioners) and allergens (by industry) is thwarted by lack of evidence to either prevent food allergy developing or protect adequately those who are already allergic. iFAAM will develop evidence-based approaches and tools for MANAGEMENT of ALLERGENS in FOOD and integrate ...
Voir le projet

 46

 TERMINÉ 
LeanBigData aims at addressing three open challenges in big data analytics: 1) The cost, in terms of resources, of scaling big data analytics for streaming and static data sources; 2) The lack of integration of existing big data management technologies and their high response time; 3) The insufficient end-user support leading to extremely lengthy big data analysis cycles. LeanBigData will address ...
Voir le projet

 11

 TERMINÉ 
ARIADNE is a proposal to bring together and integrate the existing archaeological research data infrastructures so that researchers can use the various distributed datasets and new and powerful technologies as an integral component of the archaeological research methodology. There is now a large availability of archaeological digital datasets that altogether span different periods, domains and reg ...
Voir le projet

 24