Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Hydrogen Mobility Europe 2 (H2ME 2)

Date du début: 1 mai 2016, Date de fin: 30 juin 2022,

Hydrogen Mobility Europe 2 (H2ME 2) brings together action in 8 European countries to address the innovations required to make the hydrogen mobility sector truly ready for market. The project will perform a large-scale market test of hydrogen refuelling infrastructure, passenger and commercial fuel cell electric vehicles operated in real-world customer applications and demonstrate the system bene ...
Voir le projet

 37

 TERMINÉ 
The RUGGEDISED project will create urban spaces powered by secure, affordable and clean energy, smart electro-mobility, smart tools and services. The overall aims are:1. Improving the quality of life of the citizens, by offering the citizens a clean, safe, attractive, inclusive and affordable living environment.2. Reducing the environmental impacts of activities, by achieving a significant reducti ...
Voir le projet

 34

 TERMINÉ 

HYDROGEN MEETING FUTURE NEEDS OF LOW CARBON MANUFACTURING VALUE CHAINS (H2Future)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2021,

Under the coordination of VERBUND, VOESTALPINE, a steel manufacturer, and SIEMENS, a PEM electrolyser manufacturer, propose a 26 month demonstration of the 6MW electrolysis power plant installed at the VOESTALPINE LINZ plant (Austria). After pilot plant commissioning, the electrolyser is prequalified with the support of APG, the transmission operator of Austria, in order to provide grid-balancing ...
Voir le projet

 6

 TERMINÉ 
BIG HIT will create a replicable hydrogen territory in Orkney (Scotland) by implementing a fully integrated model of hydrogen production, storage, transportation and utilisation for heat, power and mobility. BIG HIT will absorb curtailed energy from two wind turbines and tidal turbines on the islands of Eday and Shapinsay, and use 1.5MW of PEM electrolysis to convert it into ~50 t pa of hydrogen. ...
Voir le projet

 12

 TERMINÉ 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Voir le projet

 31

 TERMINÉ 
A step change in our noise mitigation strategies is required in order to meet the environmental targets set for a number of sectors of activity affecting people through noise exposure. Besides being a hindrance to our daily life and subject to regulations, noise emission is also a competitive issue in today’s global market. To address these issues, new technologies have been emerging recently, bas ...
Voir le projet

 13

 TERMINÉ 

Sharing Cities (SHAR-LLM)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Voir le projet

 36

 TERMINÉ 

Fishfriendly Innovative Technologies for Hydropower (FIThydro)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2020,

FIThydro addresses the decision support in commissioning and operating hydropower plants (HPP) by use of existing and innovative technologies. It concentrates on mitigation measures and strategies to develop cost-efficient environmental solutions and on strategies to avoid individual fish damage and enhancing population developments. Therefore HPPS all over Europe are involved as test sites. The f ...
Voir le projet

 26

 TERMINÉ 

HOLIstic optimisation of SHIP design and operation for life cycle (HOLISHIP)

Date du début: 1 sept. 2016, Date de fin: 31 août 2020,

Most maritime products are typically associated with large investments and are seldom built in large series. Where other modes of transport benefit from the economy of series production, this is not the case for maritime products which are typically designed to refined customer requirements increasingly determined by the need for high efficiency, flexibility and low environmental impact at a compe ...
Voir le projet

 39

 TERMINÉ 

EMMC Mechatronic Engineering

Date du début: 1 août 2015, Date de fin: 31 juil. 2020,

...er Universities (the University of Oviedo, Spain, the Karlsruhe University of Applied Sciences, Germany, the National Engineering Institute in Mechanics and Microtechniques, France, the Ivanovo State Power Engineering University, Russian Federation, and the Nile University, Egypt), and by other 11 educative and 23 non-educative associated partners located in France, Germany, Spain, Egypt, Russia, ...
Voir le projet

 5

 TERMINÉ 
... for the hydrogen reactions on the acidic side.Polymer-electrolyte FC & EL based on those concepts will be evaluated for targeted applications, i.e. photovoltaic electricity storage, off-grid back-up power and H2 production. The targeted market is distributed small-scale systems.
Voir le projet

 13

 TERMINÉ 
Certain industries, such as chemical production or petroleum refining have been identified as producing quantities of by-product hydrogen that can be used to produce clean, load-following power on a distributed basis, reducing reliance on fossil fuels. While the chemical production industry generally acknowledges the potential value of stationary fuel cell applications, the lack of multiple megawa ...
Voir le projet

 8

 TERMINÉ 

Hydrogen Mobility Europe (H2ME)

Date du début: 1 juin 2015, Date de fin: 31 mai 2020,

Hydrogen Mobility Europe (H2ME) brings together Europe’s 4 most ambitious national initiatives on hydrogen mobility (Germany, Scandinavia, France and the UK). The project will expand their developing networks of HRS and the fleets of fuel cell vehicles (FCEVs) operating on Europe’s roads, to significantly expand the activities in each country and start the creation of a pan-European hydrogen fuell ...
Voir le projet

 27

 TERMINÉ 
WiseGRID has two intertwined and equally important strategic goals: on the one hand, it aims at successfully putting in the market, within a horizon of 24 months after project completion, a set of solutions and technologies which increase the smartness, stability and security of an open, consumer-centric European energy grid, with an enhanced use of storage technologies and a highly increased shar ...
Voir le projet

 21

 TERMINÉ 

Collaborative European NeuroTrauma Effectiveness Research in TBI (CENTER-TBI)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2020,

Traumatic Brain Injury (TBI) is a major cause of death and disability, leading to great personal suffering to victim and relatives, as well as huge direct and indirect costs to society. Strong ethical, medical, social and health economic reasons therefore exist for improving treatment. The CENTER-TBI project will collect a prospective, contemporary, highly granular, observational dataset of 5400 p ...
Voir le projet

 44

 TERMINÉ 
This initiative proposes an innovative training environment for 3 ESRs in a supportive environment provided by an award-winning progressive wave energy company (Aquamarine Power Ltd) and a research centre at the forefront of innovation in wave energy device optimisation and control (the Centre for Ocean Energy Research at NUIM). The ESRs will be recruited by COER and will be seconded for 50% of th ...
Voir le projet

 2

 TERMINÉ 
The ACHIEVE Consortium will bring together their world-leading expertise in the design and manufacturing of electrical machines for aircraft Advanced Generation Systems (AGS), integrated Power Electronics (PE), advanced control systems and intelligent thermal management, to develop an innovative advanced mechatronic device for electrical power management system of Turboprop. The ACHIEVE Consortiu ...
Voir le projet

 3

 TERMINÉ 

Living space in the estuary stretch of the river Traisen (Traisen)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2019,

...h the Natura 2000 site, Tullnfelder Donau-Auen. This site is the largest alluvial forest in Austria. However, the River Traisen is a heavily modified water body following the construction of the hydropower plant, Altenwörth, in 1976. The regulated river is missing aquatic and terrestrial habitats that are usually found on flood plains. The connection between the river and the surrounding riparian ...
Voir le projet

 3

 TERMINÉ 

Standardized Qualifying tests of electrolysers for grid services (QualyGridS)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The overall objective of the QualyGridS project is the establishing of standardized tests for electrolysers performing electrical grid services. Alkaline electrolysers as well as PEM electrolysers will be considered individually in performance analysis and in an assessment of business cases for these electrolysers’ use. A variety of different grid services will be addressed as well as multiple hyd ...
Voir le projet

 10

 TERMINÉ 
From aeronautics to oil&gas, complex metal parts embrace major challenges across their lifecycles from the green field intensive manufacturing to the numerous maintenance and repairing operations worldwide distributed. The synergic combination of additive and subtractive processes could overcome individual shortcomings, going beyond the simple succession of steps. 'Plug and produce' modular approa ...
Voir le projet

 20

 TERMINÉ 

GrowSmarter

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

GrowSmarter aims to:• Improve the quality of life for European citizens by better mobility, housing and the quality of urban infrastructure while improving the citizens economy by lower energy costs and creating as much as 1500 new jobs (on the demonstration level).• Reduce the environmental impact by lower energy needs by 60 % and increased use of renewable energy thus reducing GHG emissions eve ...
Voir le projet

 41

 TERMINÉ 

Environmentally Friendly, Efficient Electric Motion (3EMOTION)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

The 3EMOTION project will provide policymakers and financing institutions with the necessary arguments to invest in Fuel Cell Buses (FCB) as a cost effective strategy to accelerate the reduction of harmful local emissions while offering attractive co-modality options for commuters. By leveraging the experiences of earlier FCB demonstrations in overcoming the last technical and economic barriers, a ...
Voir le projet

 15

 TERMINÉ 

Massive InteGRATion of power Electronic devices (MIGRATE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

By 2020, several areas of the HVAC pan-European transmission system will be operated with extremely high penetrations of Power Electronics(PE)-interfaced generators, thus becoming the only generating units for some periods of the day or of the year – due to renewable (wind, solar) electricity. This will result in i) growing dynamic stability issues for the power system (possibly a new major barrie ...
Voir le projet

 24

 TERMINÉ 

PROMOTioN - Progress on Meshed HVDC Offshore Transmission Networks (PROMOTION)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance componen ...
Voir le projet

 35

 TERMINÉ 
...at retain the advantages of ferrites –availability, sustainability, cost, recyclability, eco-friendliness- and which have the potential to substitute currently used RE magnets (CRM) in the electric power system.Our targeted application is an electric energy storage device: we will substitute RE magnets by AMPHIBIAN ones in a demonstrator of a flywheel and evaluate its performance against cost, eco ...
Voir le projet

 11

 TERMINÉ 

Induction Starter Generator (ISG)

Date du début: 1 avr. 2016, Date de fin: 31 déc. 2019,

...novation that leads, thanks to the development to be performed in this project to a viable solution for demonstration as required by the CFP.The main idea is to use an induction machine associated to power electronics over options like the classic aeronautic Wound Field or brush DC machine, but also over common ground applications like high powered PMG machines, variable reluctance machines or cla ...
Voir le projet

 1

 TERMINÉ 
...ep wells in different geologies, will deliver new innovative solutions and models for wider deployments of EGS reservoirs with sufficient permeability for delivering significant amounts of geothermal power across Europe. DEEPEGS will demonstrate advanced technologies in three geothermal reservoir types that provide all unique condition for demonstrating the applicability of this “tool bag” on diff ...
Voir le projet

 10

 TERMINÉ 
URBANREC project aims to develop and implement an eco-innovative and integral bulky waste management system (enhancing prevention, improving logistics and allowing new waste treatments to obtain high added value recycled products) and demonstrate its effectiveness in different regions. In URBANREC project, Northern, Mediterranean, Eastern and South-eastern areas in Europe are represented by Belgiu ...
Voir le projet

 22

 TERMINÉ 
Development of fuel injection equipment (FIE) able to reduce pollutant emissions from liquid-fueled transportation and power generation systems is a top industrial priority in order to meet the forthcoming EU 2020 emission legislations. However, design of new FIE is currently constrained by the incomplete physical understanding of complex micro-scale processes, such as in-nozzle cavitation, primar ...
Voir le projet

 10

 TERMINÉ 
Medium- to large-scale bioenergy utilisation for electricity and combined industrial or district heating is predicted to increase by 160% in 2020 compared to 2010, while carbon emission quotas are becoming stricter. Finding new ways to efficiently utilise cheap and currently unused feedstocks are necessary in order to meet these challenges.Within the project Biofficiency we will investigate how to ...
Voir le projet

 11

 TERMINÉ 

Closed Loop Wind Farm Control (CL-Windcon)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

Current practice in wind turbines operation is that every turbine has its own controller that optimizes its own performance in terms of energy capture and loading. This way of operating wind farms means that each wind turbine operates based only on the available information on its own measurements. This gets the wind farm to operate in a non-optimum way, since wind turbines are not operating as pl ...
Voir le projet

 15

 TERMINÉ 
The NextBase project, involving 8 research institutions and 6 companies, deals with the development of innovative high-performance c-Si solar cells and modules based on the interdigitated back-contacted silicon heterojunction (IBC-SHJ) solar cell concept targeting cells with efficiency above 26.0% and corresponding solar modules with efficiency above 22.0%. In particular, a number of new design an ...
Voir le projet

 15

 TERMINÉ 

European Industrial DoCtorate on Offshore WiNd and Wave ENergy (ICONN)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2019,

...lead market position globally in this sector.The ICONN EID willi) provide state-of-the art training to Early Stage Researchers jointly with industries in the scientific and engineering disciplines of power take-off (PTO) and structural control, wave mechanics and hydrodynamics, CFD, sensing and system identification; ii) advance expertise, and research capacity, in the techno-economic-environmenta ...
Voir le projet

 3

 TERMINÉ 
...cenarios will generate against the current situation (i.e., baseline). Moreover sound training and replication strategies involving a number of other public authorities have been set-up towards the empowerment of the expected project impacts.
Voir le projet

 13

 TERMINÉ 
Smart factories are characterized by increasing automation and increasing customization. In these dynamic environments flexible and adaptive work organization is crucial both for productivity and work satisfaction. Factory2Fit project will support this development by developing adaptation solutions with which people with different skills, capabilities and preferences can be engaged, motivated and ...
Voir le projet

 9

 TERMINÉ 
... methylal. The market for methylal is estimated to be worth about €5.2 billion/year. It is used in various industries due to its low toxicity, low viscosity and especially its high solvent power making it a sustainable alternative to petrol-based solvents. Therefore, the project addresses two major problems: the recovery of "difficult" plastic waste and the dependency on fossil fuel-derived mate ...
Voir le projet

 5

 TERMINÉ 

Advanced Smart-grid Power dIstRibution systEm (ASPIRE)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

The ASPIRE Consortium will bring together their world-leading expertise in aircraft Electrical Power Systems (EPS) and Power Electronics (PE) in order to design, develop and manufacture an innovative DC/DC resonant cellular converter with automatic inversion functionality. This will be a key component in the creation and demonstration of an advanced Electrical Power Distribution System (EPDS) with ...
Voir le projet

 3

 TERMINÉ 
MATChING goal is the reduction of cooling water demand in the energy sector through innovative technological solutions, to be demonstrated in thermal and geothermal power plants. The project targets include an overall saving of water withdrawal of 30% in thermal power generation, and a decrease of evaporative losses up to 15% in geothermal sector. The use of advanced and nano-technology based mate ...
Voir le projet

 17

 TERMINÉ 

The Developing Human Connectome Project (dHCP)

Date du début: 1 sept. 2013, Date de fin: 31 août 2019,

Few advances in neuroscience could have as much impact as a precise global description of human brain connectivity and its variability. Understanding this ‘connectome’ in detail will provide insights into fundamental neural processes and intractable neuropsychiatric diseases.The connectome can be studied at millimetre scale in humans by neuroimaging, particularly diffusion and functional connectiv ...
Voir le projet

 4

 TERMINÉ 

LNG PILOTS

Date du début: 15 janv. 2016, Date de fin: 30 juin 2019,

De introductie van LNG als nieuwe brandstof en energiebron voor de industrie brengt een onder-zoeks- en ontwikkelingsbehoefte met zich mee. Investeringen op dit gebied zullen de kwaliteit van de regionaal gevestigde onderzoeksinstellingen ten goede komen en de vestiging van hoogwaardige technologische ondernemingen op het gebied van logistiek, voertuigbouw, scheepsbouw, energietechniek en energiev ...
Voir le projet

 36