Rechercher des projets européens

14 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Advanced European Infrastructures for Detectors at Accelerators (AIDA-2020)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2019,

Particle physics is at the forefront of the ERA, attracting a global community of more than 10,000 scientists. With the upgrade of the LHC and the preparation of new experiments, the community will have to overcome unprecedented challenges in order to answer fundamental questions concerning the Higgs boson, neutrinos, and physics beyond the Standard Model. Major developments in detector technology ...
Voir le projet

 38

 TERMINÉ 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Date du début: 1 mars 2011, Date de fin: 29 févr. 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Voir le projet

 17

 TERMINÉ 

Realizing the European Network in Biodosimetry (RENEB)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

Creating a sustainable network in biological dosimetry that involves a large number of experienced laboratories throughout the EU will significantly improve the accident and emergency response capabilities in case of a large-scale radiological emergency. A well organised cooperated action involving EU laboratories will offer the only chance for a fast and trustworthy dose assessment urgently neede ...
Voir le projet

 28

 TERMINÉ 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Voir le projet

 143

 TERMINÉ 

Real Time Wide Area Radiation Surveillance System (REWARD)

Date du début: 1 déc. 2011, Date de fin: 30 nov. 2014,

"We propose a novel mobile system for real time, wide area radiation surveillance. The system is based on the integration of new miniaturized solid-state radiation sensors: a CdZnTe detector for gamma radiation and a high efficiency neutron detector based on novel silicon technologies. The sensing unit will include a wireless communication interface to send the data remotely to a monitoring base s ...
Voir le projet

 9

 TERMINÉ 

TRAINING SCHEMES ON NUCLEAR SAFETY CULTURE (TRASNUSAFE)

Date du début: 1 nov. 2010, Date de fin: 31 oct. 2014,

Nuclear Safety Culture is a topic of paramount importance for all nuclear operators as well as for all operators of installations dedicated to radiology and radiotherapy. It concerns also the regulators and related support organisations. Its efficient practice is an absolute must for nuclear power plants, for production and transport of fissile materials and radioisotopes, and for related research ...
Voir le projet

 19

 TERMINÉ 

Accurate Nuclear Data for nuclear Energy Sustainability (ANDES)

Date du début: 1 mai 2010, Date de fin: 31 oct. 2013,

"According to the recent publications of the European Technological Platform for a Sustainable Nuclear Energy (SNETP) (Vision report and Strategic Research Agenda) the sustainability require the combination of the present LWR, future Advanced Fast reactors and the waste minimization in closed cycles with Partitioning and Transmutation. To implement these new nuclear systems and their fuel cycles i ...
Voir le projet

 21

 TERMINÉ 

Support of Public and Industrial Research using Ion Beam Technology (SPIRIT)

Date du début: 1 mars 2009, Date de fin: 31 août 2013,

"SPIRIT is an Integrating Activities project integrating 7 leading ion beam facilities and 4 research providers from 7 Member States and 1 Associated State. The 7 partners providing TransNational Access supply ions in an energy range from ~10 keV to 100 MeV for modification and analysis of solid surfaces, interfaces, thin films and nanostructured systems. The techniques cover materials, biomedical ...
Voir le projet

 12

 TERMINÉ 
"As is the case with all nuclear expertise, there is a trend of a decreasing number of experts in radiation protection due to various reasons. On the other hand, current activities in the nuclear domain are expanding: the nuclear industry faces a so-called "renaissance", high-tech medical examinations based on ionising radiation are increasingly used, and research and non-nuclear industry also mak ...
Voir le projet

 13

 TERMINÉ 
"Besides the European Global Energy Policy, the European Council adopted an action plan that covers nuclear technologies and supports research in order to ""further improve nuclear safety and the management of radioactive waste"". To obtain a more efficient and sustainable management of radioactive waste and hence reduce the burden on geological storage, one can apply partitioning and transmutatio ...
Voir le projet

 20

 TERMINÉ 

Actinide reCycling by SEParation and Transmutation (ACSEPT)

Date du début: 1 mars 2008, Date de fin: 30 sept. 2012,

"Actinide recycling by separation and transmutation is considered worldwide and particularly in several European countries as one of the most promising strategies to reduce the inventory of radioactive waste, thus contributing to make nuclear energy sustainable. Consistently with potentially viable recycling strategies, the Collaborative Project ACSEPT will provide a structured R&D framework to de ...
Voir le projet

 35

 TERMINÉ 
The aim of this proposal is to enable present and future professionals on radioactive waste management in Europe, whatever their initial disciplinary background, to follow a training programme on geological disposal which would be widely recognized across Europe. This ambitious aim will only be achieved over a close collaboration between all stakeholders and through an effective and flexible use o ...
Voir le projet

 16

 TERMINÉ 

Fusion Energy Materials Science – Coordination Action (FEMaS-CA)

Date du début: 1 oct. 2008, Date de fin: 30 sept. 2011,

The timely availability of qualified materials for use in fusion power reactors is a necessity for the fast deployment of fusion power. 27 European institutions have joined together in the FEMaS-CA to advance fusion materials science in Europe and in close cooperation with EFDA, the European Fusion Development Agreement. The overarching objective of this Coordination Action is: The FEMaS-CA w ...
Voir le projet

 31

 TERMINÉ 

Enabling Grids for E-sciencE III (EGEE-III)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2010,

A globally distributed computing Grid now plays an essential role for large-scale, data intensive science in many fields of research. The concept has been proven viable through the Enabling Grids for E-sciencE project (EGEE and EGEE-II, 2004-2008) and its related projects. EGEE-II is consolidating the operations and middleware of this Grid for use by a wide range of scientific communities, such as ...
Voir le projet

 167