Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
This proposal presented by Indra Sistemas and CEIT jointly, try to answer in the best way the call JTI-CS2-2014-CFP01-SYS-02-02.The referred call and this associated proposal are framed inside of the packet 4.1.2.4 (Modular power controller for advanced landing system) of the System ITD for the Cleansky2 project.This project will develop a next generation power controller for electric taxi. This c ...
Voir le projet

 4

 TERMINÉ 

Cross Border SESAR Trials for Enhanced Arrival Management (PJ25 XSTREAM)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

There are periods during the day when variation in aircraft arrival times combine to exceed the capacity of the destination airport to handle them without incurring airborne delay. Such delay causes increased emissions and noise in the vicinity of the airport, as well as increasing the aircraft operator’s fuel costs. Greater congestion increases the air traffic control workload and can result in l ...
Voir le projet

 21

 TERMINÉ 

Increased Runway and Airport Throughput (PJ02 EARTH)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

EUROCONTROL’s 2013 Challenges of Growth Report “by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours per day … drives ATFCM airport delay up from around 1 minute/flight in 2012 to 5-6 minutes in 2035.”Whereas social, economic and environmental constraints impede building new runways, secondary airports are hindered by technical, infrastructure and meteorologic ...
Voir le projet

 35

 TERMINÉ 

Integrated Surface Management (PJ03a SUMO)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03 ...
Voir le projet

 37

 TERMINÉ 

Total Airport Management (PJ04 TAM)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

"Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinforcing the collaborative decision making process through the Airport Operations Centre (APOC). Validation activities stressed the need to further develop the Performance Monitoring and Management services promoting the evolution from a reactive (“firefighting” ...
Voir le projet

 30

 TERMINÉ 

Flight Object Interoperability VLD Demonstration (PJ27 IOPVLD)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

"One essential goal of the Single European Sky is to improve the Interoperability of the Air Traffic Management (ATM) network. The SESAR approach towards this goal is the introduction of a 4D-trajectory, which is common across all ATM stakeholders, called Reference Business Trajectory (RBT). The Flight Object concept is seen as a key enabler for implementing the RBT for Air Navigation Service Prov ...
Voir le projet

 14

 TERMINÉ 

PJ24 VLD Network Collaborative Management (PJ24 NCM)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

The Network Collaborative Management (NCM) project is based on a collaborative approach involving the whole spectrum of ATM actors: Airspace Users (AUs), Airports, Air Navigation Service Providers (ANSPs) and Network Manager (NM). In Air Traffic Flow and Capacity Management (ATFCM), the performance targets and expectations at the network and local level could to be better achieved only through a c ...
Voir le projet

 20

 TERMINÉ 

Initial Trajectory Information Sharing (PJ31 DIGITS)

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2019,

"DIGITS will contribute to reinforce the “Enabling Aviation infrastructure” key feature of SESAR 2020 by demonstrating the ATM benefits that can be realized through the use of downlinked 4D trajectory data in ground systems.The project proposes, in a close to operational environment and in fully representative operational conditions, a set of tightly coordinated development and demonstration actio ...
Voir le projet

 18

 TERMINÉ 

Controller Working Position / Human Machine Interface - CWP/HMI (PJ16 CWP HMI)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

PJ.16 project aims to reduce development and operating costs of Air Navigation Service Providers (ANSP). These savings will ultimately benefit airlines and their customers. It achieves this by delivering the ATM Master Plan goals (defined by the European Air Traffic Management (ATM) community) for a more efficient deployment of human resources, a progressive increase in automation support, the im ...
Voir le projet

 28

 TERMINÉ 

Common Services (PJ15 COSER)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

The legacy of Air Traffic Management (ATM) evolution in Europe has resulted in today’s highly fragmented, country-based, services. A consequence of this fragmentation, there is a negative impact on the cost in the provision of ATM service in Europe. A fundamental goal of the Single European Sky initiative is to “provide ATM services to airspace users at a cost of at least 50 % less”. The notion ...
Voir le projet

 19

 TERMINÉ 
Single European Sky – the vision is clearly described in the ATM Masterplan. Reaching the goals for the European Airspace is only possible with focused technical developments on European level.The air traffic controller is the main player in the traffic management at tactical level. This project aims at providing the air traffic controller with more automated tools, thus freeing capacity for situa ...
Voir le projet

 30

 TERMINÉ 

4D Trajectory Management (PJ18 4DTM)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

One of the main obstacles of reaching Single European Sky’s objectives is management of flight trajectories. Inaccuracies are difficult to spot and information given to stakeholders about the trajectory is limited, arriving late, and full of inconsistencies and wrong assumptions. Military Flights are currently not integrated in the ATM-system, so demanding special treatment.Additionally, there is ...
Voir le projet

 29

 TERMINÉ 

Content Integration (PJ19 CI)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

SESAR 2020 Programme aims to modernise and harmonise the European ATM System from operational and technological perspective. It will develop and validate different ATM solutions that will contribute to achieving its high level performance objectives. In this complex context, it is crucial to have a transversal activity that generates a consolidated big picture of the future European ATM System – t ...
Voir le projet

 28

 TERMINÉ 

SWIM Technical Infrastructure (PJ17 SWIM-TI)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Single European Sky – the vision is clearly described in the European ATM Master Plan. Reaching the goals for the European Airspace is only possible with focused and extensive technical developments on European level. One of the major challenges is making sure every actor in ATM has the right information at the right time and in a consistent manner, as ATM information is the key to many concepts d ...
Voir le projet

 29

 TERMINÉ 
The PJ 14 CNS aims to specify and develop the future Technologies coming from the Communication, Navigation and Surveillance domains in order to support and manage the Operational Services, like the 4D Trajectory Management, in the future ATM System.Performance requirements for CNS systems are becoming increasingly complex and demanding and need to be considered as part of an integrated and holist ...
Voir le projet

 30

 TERMINÉ 

Enhanced Air and Ground Safety Nets (PJ11 CAPITO)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Safety is at the core of ATC. However, safety is interrelated with efficiency. Air and Ground Safety Nets have been developed to increase the achieved level of safety. Necessarily, Ground and Air Safety Nets have to evolve to keep up with the challenges originating from ever increasing traffic density and complexity.ATM evolutions necessary to safely handle increasing traffic demand or to improve ...
Voir le projet

 14

 TERMINÉ 

Airport Safety Nets (PJ03b SAFE)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Safety is aviation’s top priority. To work for even safer airports, Project 03b SAFE will define, consolidate and validate additional safety bareers to mitigate the risks of runway incursion, runway excursion and more generally the risk of incidents and accidents involving aircraft at the airport. They will be declined into four Solutions:Solution ‘Enhanced airport safety support tools for control ...
Voir le projet

 28

 TERMINÉ 

Enhanced Arrivals and Departures (PJ01 EAD)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

In order to meet forecast traffic growth, PJ01 will develop concepts, tools and procedures to increase the capacity of Terminal Manoeuvring Areas (TMAs) in a safe, cost-effective and environmentally sustainable manner. This will be achieved by taking advantage of the latest technological developments from both an airborne and a ground-system perspective and through the secure sharing of data. The ...
Voir le projet

 25

 TERMINÉ 

Trajectory based Free Routing (PJ06 ToBeFREE)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

The Free Routing concept enables Airspace Users (AU) to fly as close as possible to their preferred trajectory, without being constrained by fixed airspace structures or fixed route networks.Free Routing (FR) implementation represents a step towards a less fragmented European airspace foreseen by Single European Sky (SES) and provides the AUs with the possibility to fly their user preferred routes ...
Voir le projet

 18

 TERMINÉ 

Master Plan Maintenance (PJ20 AMPLE)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Within the Single European Sky technological pillar, the European ATM Master Plan (ATM MP) is the roadmap to the horizon 2035+ to guide and connect ATM Research and Innovation and Deployment in building the future European ATM System. The European ATM Master Plan Edition 2015 approved by the SESAR Joint Undertaking (SJU) Administrative Board and the European Commission and recently published, set ...
Voir le projet

 29

 TERMINÉ 

Integrated Airport Operations (PJ28 IAO)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2019,

"This project PJ28 which is part of the SESAR 2020 Multi annual Program (S2020 MAWP) for the period 2016-2019, will demonstrate the benefits that specific promising SESAR solutions will bring in a large and two mid-size airports, where traffic congestion daily takes place during the peak season and where new SESAR solutions are expected to assist controllers in their duty. PJ28 proposal addresses ...
Voir le projet

 15

 TERMINÉ 

Remote Tower for Multiple Airports (PJ05 Remote Tower)

Date du début: 1 nov. 2016, Date de fin: 30 nov. 2019,

"Cost-effectiveness, clearly described in the topic SESAR.IR-VLD.Wave1-08-2015 as the main key performance area (KPA), is the principal KPA addressed by “PJ05 Remote Tower” project. It proposes the development of a remotely provided aerodrome air traffic service by a "multiple" and/or "center" setting. Those settings help to combine ATS services from various aerodromes in a centralized control roo ...
Voir le projet

 31

 TERMINÉ 

Industry 4.0 for wood and furniture manufacturers

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

The EU supports the 4th industrial revolution through its industrial policy and through research and infrastructure funding. However, challenges like training workers and future professionals remain. Furthermore the furniture and wood sector has identified that it has a shortage of professionals with high qualification in ICTs and other emerging technologies. Some of the specific skills and compe ...
Voir le projet

 13

 TERMINÉ 

PJ22:Validation and Demonstration Engineering (PJ22 SEabird)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

The aim of SESAR2020.PJ22 is to address one of the Transversal Activities, specifically Validation & Demonstration Engineering. In SESAR 1, the application of an engineering methodology defining the process for development of verification and validation platforms, was optionally mandated to the primary projects, leading to a different level of information available across the Programme. The delive ...
Voir le projet

 12

 TERMINÉ 

Advanced Airspace Management (PJ08 AAM)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

According to EUROCONTROL’s 2013 Challenges of Growth Report, Air traffic in the ECAC region is forecast to increase by 50% between 2012-2035 (most-likely scenario).Air traffic diversity is expected to become even more complex with the emergence of Remotely Piloted aircraft Systems (RPAS) and the multi-task nature of military aerial missions. The extension of free route operations will also imply m ...
Voir le projet

 20

 TERMINÉ 

Advanced DCB (PJ09 DCB)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

The S2020 project “PJ09 Advanced DCB” evolves the existing DCB process to a powerful distributed network management function which takes full advantage from the SESAR Layered Collaborative Planning, Trajectory Management principles and SWIM Technology to improve the effectiveness of ATM resource planning and the network performance of the ATM system in Europe. Solution 1 develops shared situation ...
Voir le projet

 30

 TERMINÉ 

PJ07 Optimised Airspace Users Operations (PJ07 OAUO)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

The SES Performance Scheme established the principles of performance-driven ATM and Network-wide Collaborative decision making including Civil and State Airspace Users. Hence, it is critical that Flight and Wings Operation Centres processes and tools be enriched for more efficient interaction with ATM Network stakeholders including Airports. Improved performance of ATM depends on a higher certaint ...
Voir le projet

 14

 TERMINÉ 

Start-up activities for Advanced Signalling and Automation Systems (X2Rail-1)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

X2Rail-1 addresses the S2R-CFM-IP2-01-2015 “Start-up activities for Advanced Signalling and Automation System” call issued by the Shift2Rail Joint Undertaking as part of the Innovation Programme 2 “Advanced Traffic Management & Control Systems”.The X2Rail-1 project aims to research and develop six selected key technologies to foster innovations in the field of railway signalling and automation sys ...
Voir le projet

 22

 TERMINÉ 

Transforming Transport (TT)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Voir le projet

 48

 TERMINÉ 

CO-modal journey re-ACcommodation on associated Travel serVices (Co-Active)

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2018,

Conceptually, the CO-ACTIVE project addresses the general enrichment of the ‘one-stop-shop’ capability as initiated in the IT2Rail project and further completes the scope of functionality by addressing post-sale business transactions, and an underlying payment-settlement solution for comodally retailed products and services. This provides the opportunity to focus specifically on those aspects of c ...
Voir le projet

 6

 TERMINÉ 

Advanced Travel Companion and Tracking Services (ATTRACkTIVE)

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2018,

Mankind’s carbon footprint is the underlying cause of global warming. Reducing it drastically within the next few years is imperative and favouring public transportation will be a deciding factor in this race. New technologies have the potential to enable the creation of better public transportation systems, thus enticing citizens away from using private means.Today’s travellers indeed consider pu ...
Voir le projet

 7

 TERMINÉ 

Storage-Enabled Sustainable Energy for Buildings and Communities (SENSIBLE)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2018,

The project SENSIBLE addresses the call LCE-08-2014 by integrating electro-chemical, electro-mechanical and thermal storage technologies as well micro-generation (CHP, heat pumps) and renewable energy sources (PV) into power and energy networks as well as homes and buildings. The benefits of storage integration will be demonstrated with three demonstrators in Portugal, UK and Germany. Évora (Portu ...
Voir le projet

 16

 TERMINÉ 

Building European Links toward South East Asia in the field of GNSS (BELS)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

The project implements a set of coordinated actions to promote EGNSS technology in South East Asia (SEA), meanwhile supporting the competitiveness of EU enterprises facilitating their contacts with relevant GNSS stakeholders in SEA, a fast growing market of more than 600 million people. Exploiting the facilities offered in Hanoi by the NAVIS Centre - a strategic asset for Europe, setup with FP7 EU ...
Voir le projet

 13

 TERMINÉ 

Innovative Intelligent Rail (IN2RAIL)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Voir le projet

 56

 TERMINÉ 
Smart cyber-physical systems (CPS) are considered to be the next revolution in ICT with lots of game-changing business potential for integrated services and products.Mastering the engineering of complex and trustworthy CPS is key to implementing CPS-based business models. Current CPS, however, are often engineered and maintained at very high cost and sometimes with unknown risks, and recent techno ...
Voir le projet

 11

 TERMINÉ 

ABC GATES FOR EUROPE (ABC4EU)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

During the last years, many ABC Gates have been deployed in the main European airports, most of them as pilot projects intended to test their capability to improve the border crossing processes in aspects such as speed, security, automation, false rejection reduction, etc.Experience gained from these pilots has been periodically assessed within the Frontex ABC Workshops, where the need for a harmo ...
Voir le projet

 17

 TERMINÉ 

INFORMATION TECHNOLOGIES FOR SHIFT TO RAIL (IT2RAIL)

Date du début: 1 mai 2015, Date de fin: 31 oct. 2017,

The IT²RAIL -“Information Technologies for Shift to rail” proposal, first step towards the long term IP4 -“IT for an Attractive Railway” SHIFT²RAIL Innovation Programme, aims at providing a new seamless travel experience, giving access to a complete multimodal travel offer which connects the first and last mile to long distance journeys.This is achieved through the introduction of a ground breakin ...
Voir le projet

 33

 TERMINÉ 
The INDIGO-DataCloud project (INDIGO for short) aims at developing a data/computing platform targeted at scientific communities, deployable on multiple hardware, and provisioned over hybrid (private or public) e-infrastructures. This platform will be built by leading European developers, resource providers, e-infrastructures and scientific communities in order to ensure its successful exploitation ...
Voir le projet

 27

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87