Rechercher des projets européens

37 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

...$) and overall device volume a factor of 60 smaller (only a few cubic centimetres). IRIS is strongly oriented toward industrialization as it is led by a major European telecom equipment manufacturer (Ericsson) and participated by a major European Silicon manufacturing company (STMicroelectronics), already committed to the industrialization of Silicon Photonics.
Voir le projet

 8

 TERMINÉ 

Baltic Sea Innovation Network Centres (BaSIC)

Date du début: 31 déc. 2008, Date de fin: 23 janv. 2012,

...- a catalyst for more than 120 bilateral cooperation meetings, - a frontman for more than 30 SMEs presentations on trade shows and congresses, - a door opener to big industry players like Ericsson, Telia Sonera, Microsoft or Google, - a moderator between public and private sector. To make the internationalization support for SME sustainable also after the project lifetime the so-called Market ...
Voir le projet

 18

 TERMINÉ 
...d many European countries are now beginning to replace these with more individualised, integratedservices which aim to support inclusion of people with intellectual disabilities in society (Mansell & Ericsson, 1996). Moreover,importance of health & social services is increasing as unemployment and relocation across Europe increases. This growing demandfor services in many Member States is creating ...
Voir le projet

 7

 TERMINÉ 

Geographic mapping of radio signals (MapCOM)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2016,

...and societal benefit. Funded by the Western Sweden Innovation Office, we have already taken initial steps in this direction and have established possible innovation potential through meetings with Ericsson and Alcatel-Lucent, two equipment manufacturers. In this ERC Proof of Concept, we plan to demonstrate the technology and determine the market potential by: (i) confirming that the performance g ...
Voir le projet

 2

 TERMINÉ 

Complex and Open Innovation for Networked Society (COINS)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2019,

...ble of finding solutions for some of the greatest challenges facing our planet. The COINS objectives will be achieved by establishing a long-term partnership between the University of Leeds and Ericsson AB. They are joined by technology start-up Diamentech.
Voir le projet

 2

 TERMINÉ 
...d internet access to mobile communication devices in urban environment. The key technology end-user driving the primary prototype development and demonstration of a complete THz communication link is Ericsson. A secondary prototype developed in M3TERA is on a multi-function adaptive THz sensor platform for different millimeter-wave sensing applications in society, including food quality control an ...
Voir le projet

 8

 TERMINÉ 
...bile broadband services for mobile users, supporting UHD/3D streaming, immersive applications and ultra-responsive cloud services.The consortium brings together major infrastructure vendors (Samsung, Ericsson, Alcatel-Lucent, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Univer ...
Voir le projet

 19

 TERMINÉ 

Training network on tRAcking in compleX sensor systems (TRAX)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

...mplex Sensor Systems, covering interdisciplinary and intersectoral aspects in this newly emerging supra-disciplinary field. The TRAX consortium comprises two large companies (Thales Nederland B.V., Ericsson A.B.); two SMEs (Rinicom Limited, Xsens Technologies B.V.); a research institute ( Fraunhofer) and three universities (University of Lancaster, Linköping University and University of Twente); a ...
Voir le projet

 8

 TERMINÉ 
...ty for 13 ESRs and one ER in a network comprising seven partners and nine associate partners. The METRICS network comprises four strong academic partners (Aalto, UC3M, UCAM, UCL), three vendors (NEC, Ericsson, Narus), four ISPs (BT, TID, IIJ, Elisa), two operators of global measurement infrastructures (SamKnows, RIPE), and three partners for business education (EOI, IE, Principae). It thus offers ...
Voir le projet

 7

 TERMINÉ 
...eam to attract young and talented researchers for careers in ICT Europe, 4) European industrial competitiveness by turning scientific findings into innovation via the fellow’s background at Ericsson.
Voir le projet

 1

 TERMINÉ 

Property-based Testing (ProTest)

Date du début: 1 mai 2008, Date de fin: 31 déc. 2011,

...s are required, what properties will need to be checked and strategies to maximise industrial impact. The initial implementation vehicle will be Erlang/OTP (Open Telecom Platform) developed by Ericsson in the early nineties. It is an open-source concurrent functional language aimed at telecoms and internet services and represents a common instrument for our research that simplifies the transfer of ...
Voir le projet

 10

 TERMINÉ 
...seen. The thermal energy (waste heat) of the system can be applied for heating purposes as well as for cooling applying, e.g. an absorption cooling system. The system demonstration will take place at Ericsson as a real TLC site
Voir le projet

 8

 TERMINÉ 
...dentities.To study the aesthetic focus, this inductive multi-case study uses both qualitative and quantitative content analysis approaches. I will collect press releases for Apple, Dell, Nokia, and Ericsson as well as product reviews for the entire personal computer and mobile phone industries from the past two decades. I will use these texts to compare the ways in which both firms and journalists ...
Voir le projet

 1

 TERMINÉ 
...Phone industry is a recent major business success story, with the EU significantly contributing and gaining from this opportunity. (Three of 4 cell phone network equipment manufacturers are European (Ericsson; Nokia-Siemens; and Alcatel-Lucent) and many global cell phone companies are based in the EU (e.g. Vodafone, Orange, Telefonica etc).The developed markets are saturated, and growth is focusse ...
Voir le projet

 5

 TERMINÉ 

"Ammonia based, fuel cell power for off-grid cell phone towers" (NH34PWR)

Date du début: 1 sept. 2010, Date de fin: 31 août 2013,

...he Cell Phone industry is a recent major business success story, with the EU significantly contributing and gaining from this success. (Three of the 5 cell phone equipment manufacturers are European (Ericsson; Nokia-Siemens; and Alcatel-Lucent) and many global cell phone companies are based in the EU (e.g. Vodafone, Orange, Telefonica).The developed markets are saturated, and growth is focussed in ...
Voir le projet

 6

 TERMINÉ 
"o ""CONCEPT""o List of locations involved: Budapest, Miskolctapolcao Venues: Museum of Literature Petőfi, Klebelsberg Community Centre, Campus of BZAKA; the medieval building of Collegium Budapest; Ericsson Building; Campus of BME University; Planetarium; the Cave Bath of Miskolctapolca and its surroundings; secondary school.o Main type of activities planned: shows, demos, exhibitions, competiti ...
Voir le projet

 5

 TERMINÉ 

Adaptive Transceivers for Wireless Communications (ATWC)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2014,

...rent areas of expertise: University of Pavia and the University of Lund in RF integrated circuit design, Marvell on the definition of the targets and on the industrial compatibility of the solutions, Ericsson on communications and system aspects. They are all well known for their contributions to the design and implementation of electronic circuits and systems for mobile terminals. As such they re ...
Voir le projet

 5

 TERMINÉ 
...ese types of devices more practical and more attractive for consumers and professionals. Several European companies could benefit from this research being pursued from within Europe, for example Sony Ericsson and Nokia. My intention is to seek a faculty position at a European university after the fellowship and start a research group in this research area."
Voir le projet

 1

 TERMINÉ 

Mobile Web 2.0 (MobiWeb2.0)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2009,

...n 440 members from research and industry headed by the Web's inventor, Tim Berners-Lee. MobiWeb2.0 is integrated with W3C's "Mobile Web Initiative" (MWI) which has many European supporters, including Ericsson, France Telecom, Nokia, TIM Italia, Vodafone and Opera. With its center of gravity in Europe, MWI is unique within W3C. MobiWeb2.0 serves to further increase European participation in MWI.Mob ...
Voir le projet

 1

 TERMINÉ 
To handle the unprecedented demand for mobile data traffic, different vendors, operators and research programmes have aimed to develop radio access technologies (RATs) that boost physical-layer link capacity, utilize millimeter wave radio, or further densify network topology. Notable steps have also been made towards shifting baseband processing from the (currently) ultra dense network edge to a c ...
Voir le projet

 10

 TERMINÉ 
The continuously growing need for higher data-rates and, therefore, more signal bandwidth in wireless communications, requires the use of multi-antenna base stations employing the recently introduced massive Multiple-Input-Multiple-Output (MIMO) concept and operating at millimeter-wave frequencies, e.g. 30 GHz. However, the implementation of such complex antenna systems into highly-integrated, ene ...
Voir le projet

 6

 TERMINÉ 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Voir le projet

 14

 TERMINÉ 

Renewables in a Stable Electric Grid (RE-SERVE)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

Future energy systems will use renewable energy sources to minimise CO2 emissions. Currently large generators powered by fossil fuel turbines maintain the stability and quality of energy supplies through their inertia. The inertia of these generator-turbine groups gives providers a significant time window in which to react to network events. We urgently need to find ways to stabilise energy sys ...
Voir le projet

 11

 TERMINÉ 

A network slice for every service (5GPagoda)

Date du début: 1 juil. 2016, Date de fin: 30 juin 2019,

5G!Pagoda represents the next evolution step in softwarized networks as supported by NFV, SDN and aimed at by the 5G network evolution. The top objectives of 5G!Pagoda are i) the development of a scalable 5G slicing architecture towards supporting specialized network slices composed on multi-vendor network functions, through the development of ii) a scalable network slice management and orchestrat ...
Voir le projet

 7

 TERMINÉ 
Information access on the Internet is exploding. Usage is shifting to multimedia applications, social networking and IoE. Cellular networks are moving to the next generation. Networking technology is shifting towards virtualization, with SDN and NFV likely to change the infrastructure landscape. The cloud concept is transforming the Internet to a network of data centers, with a communication model ...
Voir le projet

 7

 TERMINÉ 
The fifth-generation (5G) is coming.Quo vadis 5G?What architectures, network topologies and technologies will define it?Are methodologies to the analysis, design and optimization of current cellular networks still applicable to 5G? 5Gwireless is the first integrated and multi-disciplinary training-through-research network of ESRs and Senior Supervisors fully committed to re-architecting current ce ...
Voir le projet

 10

 TERMINÉ 

High density scalable optically interconnected Tb/s Board (Teraboard)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

Optical communications are becoming always more relevant because of the continuous growth of the requiested bandwidth. In the last decade we assisted a continuous growing of transport and metro netwotks, presently the bottleneck is in the processing of the huge amount of data constituted by the growing number of users, the capacity of the content that is exchanged and the convergence of Telecom an ...
Voir le projet

 10

 TERMINÉ 
Living in a safe and secure society is a fundamental human need. The security of critical infrastructures must be maintained so that supplies of power, water or other resources are secured. Modern critical infrastructures are increasingly complex and they are turning into Cyber-Physical Infrastructures because ICT is growing in importance in infrastructure management.The SUCCESS project will dev ...
Voir le projet

 19

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

5G Exchange (5GEx)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2018,

The goal of the 5G Exchange (5GEx) project is to enable cross-domain orchestration of services over multiple administrations or over multi-domain single administrations. This will allow end-to-end network and service elements to mix in multi-vendor, heterogeneous technology and resource environments. Market fragmentation has resulted in a multitude of network operators each focused on different co ...
Voir le projet

 20

 TERMINÉ 
SoftFIRE+ partners are aiming at Research and Innovation actions pursuing the integration of existing experimental facilities, testbeds and laboratories into FIRE+. The project focuses on new technologies like SDN and NFV in order to create a reliable, secure, interoperable and programmable experimental network infrastructure within the FIRE+ initiative. The Consortium will federate existing exper ...
Voir le projet

 8

 TERMINÉ 

THINGS2DO (THINGS2D0)

Date du début: 1 janv. 2014, Date de fin: 1 janv. 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Voir le projet

 44

 TERMINÉ 

5G-Crosshaul: The 5G Integrated fronthaul/backhaul (5G-Crosshaul)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Mobile data traffic is forecasted to increase 11-fold between 2013 and 2018. 5G networks serving this mobile data tsunami will require fronthaul and backhaul solutions between the RAN and the packet core capable of dealing with this increased traffic load while fulfilling new stringent 5G service requirements in a cost-efficient manner.The 5G-Crosshaul project aims at developing a 5G integrated ba ...
Voir le projet

 21

 TERMINÉ 

Large-scale RINA benchmark on FIRE (ARCFIRE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

ARCFIRE will bring RINA from labs into the real-world. RINA, the Recursive InterNetwork Architecture, is an innovative “back-to-basics” network architecture that solves current limitations and facilitates full integration between distributed computing and networking. RINA addresses the challenges that drive the communications industry in moving from dedicated hardware to almost completely virtuali ...
Voir le projet

 8

 TERMINÉ 

In-Network Programmability for next-generation personal cloUd service supporT (INPUT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The INPUT Project aims at designing a novel infrastructure and paradigm to support Future Internet personal cloud services in a more scalable and sustainable way and with innovative added-value capabilities. The INPUT technologies will enable next-generation cloud applications to go beyond classical service models, and even to replace physical Smart Devices, usually placed in users’ homes (e.g., s ...
Voir le projet

 9

 TERMINÉ 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Voir le projet

 16

 TERMINÉ 
SATORI is a 45-month project, comprising 17 partners from 13 countries, including an intergovernmental organisation, the aim of which is to improve respect of ethics principles and laws in research and innovation, and to make sure that they are adequately adapted to the evolution of technologies and societal concerns. The partners will develop an ethics assessment framework based on thorough analy ...
Voir le projet

 19