Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Background The part of the Apennines which runs through Tuscany and the historic region of Emilia has acted as a corridor for the northward expansion of the wolf (Canis lupus). From the 1970s, when the species hit a historical low, it has gradually spread from packs concentrated in Central Italy and is now even colonising the Alpine areas between France a ...
Voir le projet

 4

 TERMINÉ 
Background The importance of the Emilia Romagna region in terms of biodiversity is well known. The area includes evaporites, a sedimentary rock formed by the precipitation of salts, and the chalky outcrops on the hills that run from Reggio Emilia to Ravenna are among the largest in Europe. The project actions will be carried out in all six of the regionâ ...
Voir le projet

 5

 TERMINÉ 

Statistical networks in Tourism sector of Adriatic Regions (S.T.A.R)

Date du début: 31 janv. 2011, Date de fin: 30 août 2013,

...and services. The project is build jointly from 10 Partners from 5 countries of the IPA Adriatic cooperation area (Italy, Bosnia and Herzegovina, Albania, Greece, Croatia) under the leadership of the Emilia-Romagna Region and will last 30 months. Projects activities will be implemented through a concrete collaboration among all Beneficiaries and involving, from its start, all the relevant stakehol ...
Voir le projet

 10

 TERMINÉ 

T O R R E - Organized tourism recover rural ecology (TORRE)

Date du début: 20 oct. 2001, Date de fin: 19 oct. 2004,

Background Oriolo del Fichi is a very attractive rural area in the Emilia-Romagna region, with a rich flora and fauna which makes it a real green getaway from Faenza and other urban areas located in its vicinity. However the potential of this area has suffered from poor upkeep of the natural assets and the unachieved exploitation of an old sand quarry. Mo ...
Voir le projet

 1

 TERMINÉ 
...en, with the technical support of ICLEI, and with the cities of Dresden and Heidelberg from the German pilot project, as well as the Environmental Protection Agency for the Emilia Romagna Region in Italy, as observers. The municipalities implementing the project were Amaroussion and Kalithea (Greece), Bologna and Ferrara (Italy), Lewes (UK) and Växjö itself. ...
Voir le projet

 8

 TERMINÉ 
...dragonfly species Coenagrion mercuriale is present in only two isolated sites and the population size is low (from fewer than 300 to 4 000 individuals per year). Nonetheless, the populations of Emilia Romagna represent around 7% of the total population of Italy, thus their conservation is a priority. The other target species, the hermit beetle, is present in Romagna at one site only, and with a re ...
Voir le projet

 7

 TERMINÉ 

Effective Reproducible Model of Innovation Systems (ERMIS)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

...orkshops involving ERMIS partners and relevant regional stakeholders i.e. incubators; Chamber of Commerce, policy makers. Transfer visits have been carried out in 8 regions of ERMIS partnership: Emilia Romagna region (IT), Sophia Antipolis (FR), Chios (GR), Penela & Coimbra (PT), Eindhoven (NL), Valladolid (ES), Iasi (RO) and Horsholdm (DK). All ERMIS partners organized or at least participated in ...
Voir le projet

 15

 TERMINÉ 
...anies (e.g. Philips, Nike, Magneti-Marelli, Scuderia Toro-Rosso) and public entities (e.g. Università di Bologna, Rizzoli Institute, San Raffaele Hospital of Milan, or AUSL –healthcare system of Emilia Romagna Region). With the support of renowned legal experts focused on privacy and data protection (Orlandi-Leone Studio Legale), we are launching U2PIA, a disruptive cloud platform designed to ena ...
Voir le projet

 1

 TERMINÉ 

Women East Smuggling Trafficking (WEST)

Date du début: 31 déc. 2002, Date de fin: 30 juil. 2005,

...trol entry to a country, it is also a perpetual and serious violation of human rights: people are reduced to a commodity and are often blackmailed for the rest of their life. The project involved the Emilia-Romagna region, the General Health and Social Policies Direction, as project leader. Partners of the project have been the regions of Lombardia, Veneto and Marche, the Autonomous Province of Tr ...
Voir le projet

 10

 TERMINÉ 

Water scarcity and droughts; coordinated actions in European regions (WATER CoRe)

Date du début: 31 déc. 2009, Date de fin: 29 avr. 2013,

With agreement of their respective Ministers three of the leading regions in Europe in the field of sustainable water management, Aragon, Emilia-Romagna and Hessen initiated in 2007 in Bologna an interregional cooperation on the issue water scarcity and droughts resulting in WATER CoRe. This initiative has been consolidated in a continuous standing platform of ministers, that will meet once a year ...
Voir le projet

 14

 TERMINÉ 

Sustainable Urban Goods logistics Achieved by Regional and local policies (SUGAR)

Date du début: 31 oct. 2008, Date de fin: 28 févr. 2012,

...logistics (12 sites directly, with a second wave of minimum 5 sites in the enlarged transfer programme).The SUGAR partnership brings together:• 4 good practice sites in EU, representing the Emilia Romagna Region (IT) and primary EU cities such as London (through Transport for London) (UK), Paris (FR) and Barcelona (ES);• 8 transfer sites in EU, spanning from small to large cities and regions: Palm ...
Voir le projet

 17

 TERMINÉ 

City Environmental Accountability and Reporting (CLEAR) (CLEAR)

Date du début: 1 oct. 2001, Date de fin: 1 oct. 2003,

...e experiences and dissemination at the national and international level (through many workshops and seminars), was carried out with the support of the French association Les EcoMaires and the Emilia-Romagna Region. During the period October 2001-September 2003, the partners carried out the following: 1) operational layout and start-up 2) local experimentation 3) experiences' integration ...
Voir le projet

 1

 TERMINÉ 

Low-Carbon Economy Regions (LoCaRe)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

...ark (DK): a regional authority in southern Denmark (Lead)Västra Götaland (S): A regional authority in the west-central part of SwedenAsturias (E): a regional government in the northern part of SpainEmilia Romagna (I): an administrative region in the northern part of ItalyBusiness Support Centre Gorenjska (SL): A non-profit limited company established by municipalities, chambers of craft, chamber o ...
Voir le projet

 6

 TERMINÉ 
...de up of three macro-sets of action. The first relates to the drawing up of a Feasibility Study on the possibilities of developing the maritime links for passengers and goods between the ports of the Emilia-Romagna Region and the corresponding Croatian ports, with particular reference to those ports in the Centre North area. The second action relates to the realisation of a pilot-project concernin ...
Voir le projet

 1

 TERMINÉ 

motion of ICTs usage by SMEs as an enabler of Value Networks (ICT-VN)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

...d business and innovation sector: LP: (Spain) Navarra Fundación Dedalo para la Sociedad de la Información. P2: (Greece) Regional Development Sector, R.A. Computer Technology Institute. P3 (Italy) Emilia Romagna ERVET Economic Development Agency L.t.d. P4: Malta Communications Authority.P5: (Denmark) Agro Business Park. P6: (Belgium) TeleRegions Network. P7: (Slovenia) RDA of Northern Primorska L ...
Voir le projet

 10

 TERMINÉ 
... Achievements: Achievements so far GROW is a €7.5m programme between Andalucia, Emilia-Romagna, Noord Brabant, Malopolska and the South East of England. These 5 high growth regions are all at different stages of developmennt & share the same vision - not growth at all costs but the ...
Voir le projet

 5

 TERMINÉ 

Green Infrastructure Network (GreenInfraNet)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...n formed: Flevoland Province (NL), Barcelona Province (ES), Fingal County (IE), Plovdiv Regional Development Agency (BG), Azores Regional Government (PT), Nicosia Development Agency (CY), Emilia-Romagna Region (IT), Ghajnsielem Municipality (MT), Valencia Region (ES), the Regional Environmental Center for Central and Eastern Europe (HU), the MEPRD (LV) and Stara Zagora Regional Economic Developmen ...
Voir le projet

 12

 TERMINÉ 

Easy eServices to Shape and Empower SME Networks in Central Europe (ESSENCE)

Date du début: 30 juin 2012, Date de fin: 30 déc. 2014,

...ge potential actors who would assist project partners in the ESSENCE platform creation process. In the next step, direct meetings and interviews with selected stakeholders from Wielkopolska, Emilia-Romagna, Leipzig-Halle and Pomurje Region took place, during which 5 functional areas of the future ESSENCE platform were consulted: buying, transport and logistics, commercial, administration and stra ...
Voir le projet

 10

 TERMINÉ 

IMPLEMENTING WORLD-CLASS CLUSTERS IN CENTRAL EUROPE (C-PLUS)

Date du début: 28 févr. 2010, Date de fin: 27 févr. 2012,

...s. The project followed also the big task to involve the companies in the project activities . All the cluster have been identified by the partners in order to finalise the mapping action: CNA Emilia Romagna and the Emilia Romagna Region identified packaging and shoes, IMU from Brandeburg metal and optics, the Regional Development Agency of Bielsko Biala in Poland construction/passive building an ...
Voir le projet

 8

 TERMINÉ 
...es making use of the methodology and the tools as elaborated within the CITY PORTS project. Besides the cities mentioned here which were formally involved in the project, many other cities in the Emilia-Romagna region adopted the CITY PORTS approach and methodology in the framework of a regional policy (funding) initiative which constituted a type of parallel follow-up effect of this CADSES projec ...
Voir le projet

 21

 TERMINÉ 

Common Information to European Air (CITEAIR)

Date du début: 29 févr. 2004, Date de fin: 30 déc. 2007,

...m (DSS): The cities involved in this project are operating and further developing their DSS's. Taking advantage of the existing experiences, steps have been undertaken to analyse the situation in the Emilia Romagna Region and to identify the most appropriate components (e.g. models, interfaces) of a DSS to assess the environmental impact of traffic. Based on this analysis the transfer of part of s ...
Voir le projet

 14

 TERMINÉ 

AQUA. Adoption of Quality water Use in Agro-industry sector (AQUA)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2013,

...change and reuse between sectors, resulting in more sustainable water management. In Italy, one of the most important concentrations of agro-industry and livestock businesses is found in the Emilia-Romagna region. These have supported the economic development of the region, but have also contributed to problems of water depletion and land subsidence. Objectives ...
Voir le projet

 6

 TERMINÉ 

Ανάπτυξη δεξιοτήτων στην υδροθεραπεία

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

...ram were as follows: 1st flow – Hydrotherapy Skills Development– Bologna Italy (20 students, 15 days) The training was focused in the general area of Bologna and the region of Emilia Romagna, which is known for its hot springs and organized hydrotherapy and spa facilities. 2st flow – Hydrotherapy Skills Development–– Valencia Spain (20 students, 15 days) The training was focused in the general ...
Voir le projet

 3

 TERMINÉ 
...tivity of transnational study visits, of testing, analysis and adaptation, discussion and dissemination of devices, it was developed the job profile of "Valorizer" in the context of social economy in Emilia Romagna Region. You were also laid for the development of the professional profile in partner countries. In practice, the main achievements were:- Made an educational device / ad hoc training ( ...
Voir le projet

 8

 TERMINÉ 
Growing Up Together was a partnership between East Sweden Region/Östergötland in Sweden and Region Emilia Romagna in Italy. It has been a strategical schooldevelopment project concerning integration and reception of newly arrived immigrant pupils in school within the Comenius Regio program. As for the mobilities the partnership has implemented 2 coordination meetings , 2 transnational seminars, 2 ...
Voir le projet

 2

 TERMINÉ 
...ssification of Italian vertebrates raised the risk status of the Barbus plebejus to “vulnerable” and of the Barbus meridionalis (sin. B. caninus) to “endangered”. Particularly the Emilian tributaries of the Po River have faced local population extinctions due to habitat alteration and fragmentation, river discontinuity and competition with alien species. ...
Voir le projet

 6

 TERMINÉ 

A model to reclaim and reuse wastewater for quality crop production (ReQpro)

Date du début: 1 déc. 2013, Date de fin: 28 févr. 2017,

... Agency's report, “The European environment, state and outlook 2010, water resources-quantity and flows”. In Italy, agriculture accounts for 60% of total water consumption. In the region of Emilia-Romagna, water consumption for irrigation is 66%. Agriculture's extremely high share of water consumption affects both surface and underground water resources. In the Po river basin, where 40% of Ita ...
Voir le projet

 5

 TERMINÉ 
Background The hydrographic network of creeks and streams that drain water from the hills and mountains of Emilia-Romagna are often characterised by small watersheds and narrow stream beds prone to flooding. As a consequence, creeks and streams are characterised by steep slopes and very few floodplains. Thus, it is not always easy to consider the expansio ...
Voir le projet

 5

 TERMINÉ 
... contaminants and pollutants. It is also costly. Innovative solutions are thus required in order to ensure sustainable seabed maintenance of port inlets. The port of Cervia in the Italian region of Emilia-Romagna undergoes cyclical inlet silting. Relevant data on port bathymetries (under water depth), in particular from 2009 to date, is available. Past technological solutions, such as seasonal d ...
Voir le projet

 4

 TERMINÉ 

Innovative approach to soil management in viticultural landscapes (LIFE+ SOIL4WINE)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

...hese areas and the gradual introduction of mechanisation has led to profound changes in land use and management. In particular, the standard floor management strategy adopted in the vineyards of the Emilia-Romagna region mostly relies upon tillage as the main weed controller. In addition, increasing adoption of mechanical harvesting has led to a season-long maintenance of grass sward in the viney ...
Voir le projet

 5

 TERMINÉ 
...n order to help implement the ‘Protocol of Intent for Air Quality’ tackling environmental pollution, which was signed by local government agencies and business associations in the Reggio Emilia province. This protocol includes the promotion of integrated transport systems. Moreover, the project planned to identify and define an innovative integrated governance model inspired by criteria for su ...
Voir le projet

 6

 TERMINÉ 

WHAT'S APPRENTICESHIP IN EMILIA-ROMAGNA

Date du début: 1 mai 2014,

... Higher level Apprenticeship as the main tool to favor the access to the labour market of graduates. In the Italian framework the responsibility of its application concerns the regional authority.The Emilia-Romagna region is one of the first of Italian regions to include this tool in its policy for education and labour and to develope pilot phases.The objective of the project WAPPER is to develop ...
Voir le projet

 6

 TERMINÉ 
...l (RIAT+) to support the proposed methodology, thus maximising environmental benefits at fixed costs, and minimising costs at fixed environmental benefits; Apply this integrated tool in the Emilia-Romagna and Alsace regions, while setting up a register of existing and new emission reduction measures (technical and non-technical) in the two regions; Devise a standard set of quantitative indicato ...
Voir le projet

 5

 TERMINÉ 

Restoration of Sentina coastal wetlands (Re.S.C.We.)

Date du début: 15 sept. 2010, Date de fin: 14 mars 2013,

Background The project area is the only residual wetland in the wide Adriatic coastal tract of more than 400 km, between the Comacchio Valleys (in the Emilia Romagna region) and the lagoons of Lesina and Varano (in the Apulia region). The coastal lagoons (a priority habitat according to the EU Habitats Directive) in this area are exposed to the threats of ...
Voir le projet

 4

 TERMINÉ 
...gh integrated management of sediment from dredging activities in small harbours. This was intended to lead to the implementation of a network-based system involving nine small harbours located in the Emilia-Romagna Region. The harbour network would carry out all the sediment related activities (i.e. dredging, separation/treatment, reuse, and disposal). After analysing the available options for the ...
Voir le projet

 8

 TERMINÉ 
Background Transport in the Emilia Romagna Region was noted as being responsible for 90% of total CO emission, 46% of NOx, 41% of primary PM10, and 42% of total non-methane volatile organic compounds (NMVOC). More specifically, CO2 emissions from the road transport sector in this region were the second highest in Italy, representing 30% of total regional ...
Voir le projet

 4

 TERMINÉ 
... and carcasses. The project supported the creation of other Anti-poison Dog Units beyond the project areas, namely three dogs were trained by LIFE project staff to find poisoned baits in Tuscany and Emilia-Romagna (Italy). Two field training courses were organised and attended by 28 people involved with the monitoring units (e.g. the Italian State Forestry Service (CFS) and Spanish law enforcemen ...
Voir le projet

 3

 TERMINÉ 
Background In 2000, CO2 emissions in Emilia-Romagna were estimated at almost 35 million tonnes. If the other greenhouse gases, CH4 and N2O are included, emissions in the region currently exceed 41 million tonnes/yr of CO2 equivalents. Agriculture can contribute to mitigating climate change by producing biomass as a substitute for fossil fuels, as well as ...
Voir le projet

 6

 TERMINÉ 

Improve Resilience of Industry Sector (LIFE IRIS)

Date du début: 15 sept. 2015, Date de fin: 15 mars 2019,

... extreme weather events occur. Objectives The main objective of the LIFE IRIS project is to support enterprises in the Emilia-Romagna region, particular SMEs, in their efforts to become more climate-resilient; and to test the effectiveness of the adaptation measures applied through a cluster approach (industrial area and ...
Voir le projet

 7

 TERMINÉ 
...rd to its objective to provide a reference model for future decisions concerning biomass utilisation in the production of electricity and heat, the project raised the interest of the Emilia Romagna Region which, in the frame of its Regional Energy Plan, may provide funding for similar initiatives in mountain and hilly areas with the WARM-WOOD project as reference model.
Voir le projet

 4