Rechercher des projets européens

10 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Zero Emission bUs Systems (ZEEUS)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2017,

Electrification of the public transport is a raising trend in Europe, and electric buses are soon expected to enter markets as one of the most interesting options for matching urban environmental targets. Electrification is driven by both economics and politics. However, although technology is not yet fully matured and ready for wide commercialisation, a large demonstration project will facilitat ...
Voir le projet

 41

 TERMINÉ 

Next Generation Train Control (NGTC)

Date du début: 1 sept. 2013, Date de fin: 28 févr. 2017,

The main scope of this Next Generation Train Control (NGTC) project is to analyse the commonality and differences of required functionality for mainline and urban lines and develop the convergence of both ETCS and CBTC systems, determining the level of commonality of architecture, hardware platforms, and system design that can be achieved. This will be accomplished by building on the experience of ...
Voir le projet

 21

 TERMINÉ 

MESA - Maritime Europe Strategy Action - FOSTER Waterborne (MESA)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

Maritime Europe Strategy Action (MESA – FOSTER WATERBORNE), main strategic objective (in line with WATERBORNE-TP) is to strengthen the effectiveness of the research and innovation capacities of the European maritime industry, by:- Optimization of the European maritime RDI strategies- Improvement of the stakeholders network, of the dissemination, of the use of the research results, and increasing t ...
Voir le projet

 32

 TERMINÉ 
MERLIN’s main aim and purpose is to investigate and demonstrate the viability of an integrated management system to achieve a more sustainable and optimised energy usage in European electric mainline railway systems.MERLIN will provide an integrated optimisation approach that includes multiple elements, dynamic forecasting supply-demand scenarios and cost considerations to support operational deci ...
Voir le projet

 20

 TERMINÉ 
"For many transport modes, energy reduction strategies can be effectively formulated at the level of the vehicle or vessel. New technologies can therefore be introduced to a vehicle and the direct energy savings can be readily quantified. However, such approach is not suitable to be employed for urban rail, where it is not sufficient to consider only the energy performance of vehicles; the energy ...
Voir le projet

 18

 TERMINÉ 

The Intelligent, Innovative, Integrated Bus Systems (3iBS)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2015,

3iBS is a project conceived to continue striving for increased performance, accessibility and efficiency of urban bus systems. 3iBS is participating directly in the objective of the European Commission to develop “high quality public transport”.Based on the EBSF results and innovations as well as on previous and ongoing research projects and activities, 3iBS is committed to raise the image of the ...
Voir le projet

 11

 TERMINÉ 
ACOUTRAIN will simplify and improve the acoustic certification process of new rolling stock, in particular relating to the TSI Noise. Today the need of conformity assessment for a new vehicle according to the TSI Noise represents a significant element of both cost and time to market due to the need to carry out expensive and time consuming tests. The goal of the proposed project is to speed up the ...
Voir le projet

 15

 TERMINÉ 

European Railway Electromagnetic Compatibility (EUREMCO)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2014,

The current authorisation process for placing into service rail vehicles according to Technical Specifications for Interoperability and national safety rules is a very long and costly process. The Technical Specifications for Interoperability (TSI) provide common regulations for the placing in service of rail vehicle, when such common understanding and harmonized rules exist. This is not the case ...
Voir le projet

 19

 TERMINÉ 

Optimal Networks for Train Integration Management across Europe (ON-TIME)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2014,

"The aim of this project is a step-change in railway capacity by reducing delays and improving traffic fluidity. This will be achieved by a partnership between railway industry experts, system integrators, small dynamic knowledge led companies and academic researchers.There are 4 levels of work:L1: High level principles, definitions and requirements to direct researchL2: Methods and algorithms der ...
Voir le projet

 19

 TERMINÉ 

Collaboration Concepts for Comodality (CO3)

Date du début: 1 sept. 2011, Date de fin: 31 août 2014,

Collaboration Concepts for Co-modality, CO3 is a business strategy enabling companies throughout the supply chain to set up and maintain initiatives to manage and optimise their logistics and transport operations by increasing load factors, reducing empty movements and stimulate co-modality, through Horizontal Collaboration between industry partners, thereby reducing transport externalities such a ...
Voir le projet

 19