Rechercher des projets européens

29 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
COMET will strengthen the pan-European research initiative on the impact of radiation on man and the environment by facilitating the integration of radioecological research. COMET will build upon the foundations laid by the European Radioecology Alliance (ALLIANCE) and the on-going FP7 STAR Network of Excellence in radioecology. By collaborating with the European platforms on nuclear and radiologi ...
Voir le projet

 20

 TERMINÉ 

Code for European Severe Accident Management (CESAM)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2017,

The Fukushima accidents highlighted that both the in-depth understanding of such sequences and the development or improvement of adequate severe accident management measures is essential in order to further increase the safety of the nuclear power plants operated in Europe. CESAM (Code for European Severe Accident Management) is a R&D project that aims in particular at the improvement of the Europ ...
Voir le projet

 21

 TERMINÉ 
Diagnostic radiation represents an indispensable, sometimes life-saving, tool in modern medicine. However, the growing use of computerized tomography (CT) is a topic of concern in radiological protection, especially for children and adolescents. Children are generally more sensitive to the carcinogenic effects of ionizing radiation than adults. In addition, they have a longer life-span to express ...
Voir le projet

 22

 TERMINÉ 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Date du début: 1 juil. 2013, Date de fin: 31 déc. 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Voir le projet

 29

 TERMINÉ 
"The ARCADIA project has been conceived so as to provide a twofold support to the further development of nuclear research programs in the NMS, targeting two major areas included in the Strategic Research and Innovation Agenda of SNETP: ESNII, through the support of the ALFRED project towards its realization in Romania, and NUGENIA, approaching remaining safety aspects of Gen III/III+ that could be ...
Voir le projet

 28

 TERMINÉ 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Date du début: 1 sept. 2013, Date de fin: 30 sept. 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Voir le projet

 52

 TERMINÉ 
"Education, training and information to the general public are key factors in the governance of ionising radiation risks. Communication about ionising radiation with the general public has to to be further improved, as highlighted also by the 2011 accident in Japan. An effort is needed to analyse the state of the art and the existing needs in education, training and information, and to coordinate ...
Voir le projet

 11

 TERMINÉ 

Safety of ACtinide Separation proceSSes (SACSESS)

Date du début: 1 mars 2013, Date de fin: 30 juin 2016,

"Nuclear power plays a key role in limiting EU’s greenhouse gases emissions, and makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensur ...
Voir le projet

 26

 TERMINÉ 
This proposal aims to close gaps that have been identified in nuclear and radiological preparedness following the first evaluation of the Fukushima disaster. It addresses the call Fission-2010-3.3.1: Update of emergency management and rehabilitation strategies and expertise in Europe. The consortium intends to review existing operational procedures in dealing with long lasting releases, address th ...
Voir le projet

 50

 TERMINÉ 

Realizing the European Network in Biodosimetry (RENEB)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

Creating a sustainable network in biological dosimetry that involves a large number of experienced laboratories throughout the EU will significantly improve the accident and emergency response capabilities in case of a large-scale radiological emergency. A well organised cooperated action involving EU laboratories will offer the only chance for a fast and trustworthy dose assessment urgently neede ...
Voir le projet

 28

 TERMINÉ 

NUCLEAR REACTOR SAFETY SIMULATION PLATFORM (NURESAFE)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

After the 2011 disaster that occurred in Japan, improvement of nuclear safety appears more clearly as a paramount condition for further development of nuclear industry. The NURESAFE project addresses engineering aspects of nuclear safety, especially those relative to design basis accidents (DBA). Although the Japanese event was a severe accident, in a process of defense-in-depth, prevention and c ...
Voir le projet

 25

 TERMINÉ 

Low Dose Research towards Multidisciplinary Integration (DOREMI)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2015,

The aim of DoReMi is to promote the sustainable integration of low dose risk research in Europe in order to aid the effective resolution of the key policy questions identified by the High Level Expert Group (HLEG) on Low Dose Risk Research (www.hleg.de). DoReMi provides an operational tool for the development of the proposed MELODI platform (Multidisciplinary European Low Dose Risk Re-search Initi ...
Voir le projet

 39

 TERMINÉ 
The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration demonstrator fully meeting the market needs, in support of the Nuclear Cogeneration European Industrial Initiative.Following the reference EUROPAIRS project and in close collaboration with the ongoing ARCHER project, national projects (e.g. Polish HTRPL, German S ...
Voir le projet

 22

 TERMINÉ 
The ALLIANCE project focuses on the preparatory phase for developing the ALLEGRO demonstrator. This is based on the Gas Fast Reactor (GFR) concept, one of the 2 alternative systems under the SET-Plan’s European Sustainable Nuclear Industrial Initiative (ESNII), expected to be built in Central Europe. ALLIANCE covers a number of preliminary studies on fuel management, R&D roadmap & infrastructures ...
Voir le projet

 9

 TERMINÉ 

Thermal-hydraulics of Innovative Nuclear Systems (THINS)

Date du début: 1 févr. 2010, Date de fin: 31 janv. 2015,

For the long-term development of nuclear power, innovative nuclear systems such as Gen-IV reactors and transmutation systems need to be developed for meeting future energy challenges. Thermal-hydraulics is recognized as a key scientific subject in the development of innovative reactor systems. This project is devoted to important crosscutting thermal-hydraulic issues encountered in various innovat ...
Voir le projet

 24

 TERMINÉ 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Voir le projet

 34

 TERMINÉ 
"The presence of a stratification in a NPP containment is a source of concern, as pockets of hydrogen in high concentration could lead to a deflagration or detonation risk. The objectives of the project are two folds: one is to establish whether in a test sequence representative of a severe accident in a LWR a hydrogen (helium) stratification can be established during part of the transient startin ...
Voir le projet

 8

 TERMINÉ 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Voir le projet

 22

 TERMINÉ 
SITEX aims at identifying the efficient means that should be developed through the establisment of a sustainable expertise function network within a European framework with the view to:- allowing mutual understanding between regulatory bodies, TSOs and waste management organisations (WMOs) on (i) the regulatory expectations at decision holdpoints and (ii) how the scientific and technical elements ...
Voir le projet

 16

 TERMINÉ 

EUROPEAN FACILITY FOR AIRBORNE RESEARCH IN ENVIRONMENTAL AND GEOSCIENCE (EUFAR)

Date du début: 1 oct. 2008, Date de fin: 30 sept. 2013,

"EUFAR is the Integrating Activity for airborne research in Geo-science. It will integrate the airborne community, to ensure thatresearchers may have access to the most suited infrastructure they need, irrespective of the location of the infrastructure. TheEUFAR consortium comprises 32 legal entities. 14 operators of airborne facilities, and 18 experts in airborne research. Theycontribute to 9 Net ...
Voir le projet

 34

 TERMINÉ 

Fate of Repository Gases (FORGE)

Date du début: 1 févr. 2009, Date de fin: 30 sept. 2013,

"The multiple barrier concept is the cornerstone of all proposed schemes for underground disposal of radioactive wastes. The concept invokes a series of barriers, both engineered and natural, between the waste and the surface. Achieving this concept is the primary objective of all disposal programmes, from site appraisal and characterisation to repository design and construction. However, the perf ...
Voir le projet

 25

 TERMINÉ 
"In the event of a large scale radiological emergency biological dosimetry is an essential tool that can provide timely assessment of radiation exposure to the general population and enable the identification of those exposed people, who should receive medical treatment. A number of biodosimetric tools are potentially available, but they must be adapted and tested for a large-scale emergency scena ...
Voir le projet

 17

 TERMINÉ 

European Gas Cooled Fast Reactor (GoFastR)

Date du début: 1 mars 2010, Date de fin: 28 févr. 2013,

Fast reactors have the unique ability to be sustainable by, not only being able to generate their own fuel, but through being able to burn minor actinides to reduce the quantity and radiotoxicity of nuclear wastes. The latter ability enables fast reactors to not only burn the minor actinides produced by themselves but, in addition, the minor actinides arising from legacy wastes and thermal reactor ...
Voir le projet

 22

 TERMINÉ 

NUclear Reactor Integrated Simulation Project (NURISP)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2012,

The target of the proposed NURISP Collaborative Project is to make new and significant steps towards a European Reference Simulation Platform for applications relevant to present PWR and BWR and to future reactors. The roadmap of this Simulation Platform will be proposed to be part of the future Strategic Research Agenda of the Sustainable Nuclear Energy Technology Platform (SNE-TP). The first st ...
Voir le projet

 23

 TERMINÉ 
The objective of this coordination action is to develop best practice guidelines for the performance of Level-2 PSA methodologies with a view to harmonization at EU level and allowing a meaningful and practical uncertainty evaluation in a Level-2 PSA. Speficic relationships with community in charge of nuclear reactor safety (utilities, safety authorities, vendors, research or services companies) ...
Voir le projet

 23

 TERMINÉ 

ADvanced Reactor Initiative And Network Arrangement (ADRIANA)

Date du début: 1 févr. 2010, Date de fin: 31 juil. 2011,

"The coordinating action ADRIANA (ADvanced Reactor Initiative And Network Arrangement) is proposed to setting up the network dedicated to the construction and operation of research infrastructures in support of developments for the European Industrial Initiative for sustainable nuclear fission. The project as the base for the current long-term taking place coordination activities of Euroatom under ...
Voir le projet

 15

 TERMINÉ 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Voir le projet

 27

 TERMINÉ 

Optimization of Radiation Protection of Medical Staff (ORAMED)

Date du début: 1 févr. 2008, Date de fin: 31 janv. 2011,

"The state-of-the-art analysis performed in the FP6 CONRAD project highlighted high extremity doses and a lack of systematic data analysis on exposures to the staff in interventional radiology (IR) and nuclear medicine (NM). To optimize the working procedures in the medical field with respect to radiation protection, a project focussed on improving the knowledge on extremity and eye lens exposures ...
Voir le projet

 12

 TERMINÉ 

Towards a European Network of Excellence in Biological Dosimetry (TENEB)

Date du début: 1 févr. 2009, Date de fin: 31 juil. 2009,

In recent years a number of accidents have occurred that show the necessity to be prepared for a possible large-scale radiological accident or a terrorist attack, where the casualties will be members of the public. The accident may likely have an international scale and the radiation exposure can range from very low to substantial. An important initial step in the medical response to large-scale r ...
Voir le projet

 5