Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The vision of EU-ToxRisk is to drive a paradigm shift in toxicology towards an animal-free, mechanism-based integrated approach to chemical safety assessment. The project will unite all relevant disciplines and stakeholders to establish: i) pragmatic, solid read-across procedures incorporating mechanistic and toxicokinetic knowledge; and ii) ab initio hazard and risk assessment strategies of chemi ...
Voir le projet

 43

 TERMINÉ 

Formulations and Computational Engineering (FORCE)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The FORCE consortium is a 10 pan-European expert partnership with the objective to develop a integrated Business Decision Support System (BDSS) based on open standards for industries engaged in formulating chemical ingredients. The generic BDSS is an open framework that connects any existing or future materials models at various levels of complexity and discretion (electronic, atomistic, mesoscop ...
Voir le projet

 11

 TERMINÉ 
PROTECT aims to introduce to the market One step antimicrobial finish processes for polymeric materials used in i) specialty textiles for public areas and hospitals, ii) water treatment membranes, and iii) implantable medical devices. Compared to main existing manufacturing routes, the proposed one-step coating technologies are simple, fast, and reproducible. For this, PROTECT uses as a starting p ...
Voir le projet

 23

 TERMINÉ 
The mission of COMPOSELECTOR is to develop a Business Decision Support System (BDSS), which integrates materials modelling, business tools and databases into a single workflow to support the complex decision process involved in the selection and design of polymer-matrix composites (PMCs). This will be achieved by means of an open integration platform which enables interoperability and information ...
Voir le projet

 11

 TERMINÉ 
The problem: finding the right patient for the right treatmentDespite a large and growing disease burden in osteoarthritis (OA), many pharmaceutical companies have de-emphasized or even abandoned OA drug development due to perceived hurdles. Crucial in this is the lack of appropriate outcome measures that can robustly identify patient benefit from a specific therapy. The lack of specific and sensi ...
Voir le projet

 25

 TERMINÉ 

Valorisation of mushroom agrowastes to obtain high value products (FUNGUSCHAIN)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2020,

The project aims at the valorization of agricultural residues coming from mushroom (Agaricus Bisporus) farming residues as a case to set up new cascading possibilities using innovative procedures to extract high value bio-based additives (antioxidants, antimicrobials, proteins), convert lipids into bioplasticizers and polysaccharides (glucans and fermentable sugars) into biopolymers using remainin ...
Voir le projet

 17

 TERMINÉ 
NoAW : No Agro-Waste.Innovative approaches to turn agricultural waste into ecological and economic assets.Driven by a “near zero-waste” society requirement, the goal of NoAW project is to generate innovative efficient approaches to convert growing agricultural waste issues into eco-efficient bio-based products opportunities with direct benefits for both environment, economy and EU consumer. To ach ...
Voir le projet

 32

 TERMINÉ 
Biomass is a valuable, sustainable feedstock for the production of high added value chemicals and materials, and will play an important role in the transition of the European Process Industry to a Sustainable Process Industry. However, for the optimal utilization of these bio-resources the fractionation of the biomass on basis of functionalities is required. The innovative approach of BIO4PRODUCTS ...
Voir le projet

 7

 TERMINÉ 
INSPIREWATER demonstrates a holistic approach for water management in the process industry using innovative technology solutions from European companies to increase water and resource efficiency in the process industry. This will put Europe as a leader on the world market for segments in industrial water treatment which will create new high skilled jobs in Europe. With extended collaboration betwe ...
Voir le projet

 11

 TERMINÉ 

1D Nanofibre Electro-Optic Networks (1D-Neon)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2020,

The vision of 1D-NEON proposal is to develop fibre-based smart materials along with an integrated technology platform for the manufacturing in Europe of new products with multi-sectorial applications in consumer electronics, energy, healthcare and fitness, smart buildings, sensors and e-skin for soft robotics.The overall objective of 1D-NEON is to build a modular platform for manufacturing fibre-b ...
Voir le projet

 14

 TERMINÉ 
STEMM-CCS is an ambitious research and innovation project on geological carbon dioxide (CO2) storage that will deliver new insights, guidelines for best practice, and tools for all phases of the CO2 storage cycle at ocean Carbon Capture and Storage (CCS) sites. It brings together the main operator (Shell) of the world’s first commercial scale full-chain ocean demonstration CCS project (Peterhead P ...
Voir le projet

 13

 TERMINÉ 

Cross Border SESAR Trials for Enhanced Arrival Management (PJ25 XSTREAM)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

There are periods during the day when variation in aircraft arrival times combine to exceed the capacity of the destination airport to handle them without incurring airborne delay. Such delay causes increased emissions and noise in the vicinity of the airport, as well as increasing the aircraft operator’s fuel costs. Greater congestion increases the air traffic control workload and can result in l ...
Voir le projet

 21

 TERMINÉ 

Increased Runway and Airport Throughput (PJ02 EARTH)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

EUROCONTROL’s 2013 Challenges of Growth Report “by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours per day … drives ATFCM airport delay up from around 1 minute/flight in 2012 to 5-6 minutes in 2035.”Whereas social, economic and environmental constraints impede building new runways, secondary airports are hindered by technical, infrastructure and meteorologic ...
Voir le projet

 35

 TERMINÉ 

Integrated Surface Management (PJ03a SUMO)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03 ...
Voir le projet

 37

 TERMINÉ 

Total Airport Management (PJ04 TAM)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

"Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinforcing the collaborative decision making process through the Airport Operations Centre (APOC). Validation activities stressed the need to further develop the Performance Monitoring and Management services promoting the evolution from a reactive (“firefighting” ...
Voir le projet

 30

 TERMINÉ 
The InSCOPE project will set-up an open access pilot line service for Hybrid TOLAE (H-TOLAE) technologies capable of sampling products at TRL6-7. It positions itself in between R&D and industry and deploys a service for validating potential H-TOLAE products. Manufacturing progresses beyond R&D level (TRL5 towards 6) by improving processes, functionality and reliability allowing sampling at high qu ...
Voir le projet

 14

 TERMINÉ 

PJ24 VLD Network Collaborative Management (PJ24 NCM)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

The Network Collaborative Management (NCM) project is based on a collaborative approach involving the whole spectrum of ATM actors: Airspace Users (AUs), Airports, Air Navigation Service Providers (ANSPs) and Network Manager (NM). In Air Traffic Flow and Capacity Management (ATFCM), the performance targets and expectations at the network and local level could to be better achieved only through a c ...
Voir le projet

 20

 TERMINÉ 
A Solid Oxide Fuel Cell (SOFC) is a ceramic-based multilayer device that involves expensive and time-consuming multi-step manufacturing processes including tape casting, screen printing, firing, shaping and several high-temperature thermal treatments. In addition, these cells are manually assembled into stacks resulting in extra steps for joining and sealing that difficult the standardization and ...
Voir le projet

 8

 TERMINÉ 

Master Plan Maintenance (PJ20 AMPLE)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Within the Single European Sky technological pillar, the European ATM Master Plan (ATM MP) is the roadmap to the horizon 2035+ to guide and connect ATM Research and Innovation and Deployment in building the future European ATM System. The European ATM Master Plan Edition 2015 approved by the SESAR Joint Undertaking (SJU) Administrative Board and the European Commission and recently published, set ...
Voir le projet

 29

 TERMINÉ 

Political and sOcial awareness on Water EnviRonmental challenges (POWER)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2019,

POWER is a user-driven project to share knowledge and experience of water related issues in different EU local authorities to create a tool for EU water policy. It addresses four of the eight EIP WATER priorities:1. Water reduction consumption2. Water quality 3. Extreme weather events (surface water flood risk) 4. Variables related to water conservationIt will develop a common DSP sys ...
Voir le projet

 12

 TERMINÉ 

Remote Tower for Multiple Airports (PJ05 Remote Tower)

Date du début: 1 nov. 2016, Date de fin: 30 nov. 2019,

"Cost-effectiveness, clearly described in the topic SESAR.IR-VLD.Wave1-08-2015 as the main key performance area (KPA), is the principal KPA addressed by “PJ05 Remote Tower” project. It proposes the development of a remotely provided aerodrome air traffic service by a "multiple" and/or "center" setting. Those settings help to combine ATS services from various aerodromes in a centralized control roo ...
Voir le projet

 31

 TERMINÉ 

Pest Organisms Threatening Europe (POnTE)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2019,

This proposal SFS-03a-2014-aligned focuses to minimize the risk of introduction/impact of emerging pests threatening EU agriculture and forestry. The targets are: 1) Xylella fastidiosa and its vectors in olive, grapevine, citrus, stone fruit, ornamentals and landscape trees of high socio-economic importance; 2) ‘Ca. Liberibacter solanacearum’ and its vectors affecting a number of strategic crops s ...
Voir le projet

 27

 TERMINÉ 

Advanced DCB (PJ09 DCB)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

The S2020 project “PJ09 Advanced DCB” evolves the existing DCB process to a powerful distributed network management function which takes full advantage from the SESAR Layered Collaborative Planning, Trajectory Management principles and SWIM Technology to improve the effectiveness of ATM resource planning and the network performance of the ATM system in Europe. Solution 1 develops shared situation ...
Voir le projet

 30

 TERMINÉ 

Virtual Factory Open Operating System (vf-OS)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

The primary outcomes of vf-OS are an:- Open Operating System (vf-OS) and Software Development Kit (OAK) for Factories of the Future that aims to be the reference system software for collaborative manufacturing and logistics processes including its associated resources and data- Open vf-OS Platform, including a Multi-sided application marketplace and development studio, that aims to become the Apps ...
Voir le projet

 14

 TERMINÉ 

Decentralised Agile Coordination Across Supply Chains (DIGICOR)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

European manufacturing competes in a global knowledge-driven economy, and thus increasingly seeks competitive advantage through quality, agility and personalisation based on latest advances in IT. Increasing utilisation of IT in mission-critical elements of the production brings opportunities for consistency, transparency and flexibility, bringing the “lot size of 1” closer to reality even for mas ...
Voir le projet

 11

 TERMINÉ 
SynchroniCity represents the first attempt to deliver a Single Digital City Market for Europe by piloting its foundations at scale in 11 reference zones - 8 European cities & 3 more worldwide cities - connecting 34 partners from 11 countries over 4 continents. Building upon a mature European knowledge base derived from initiatives such as OASC, FIWARE, FIRE, EIP-SCC, and including partners with le ...
Voir le projet

 35

 TERMINÉ 
NIMBLE: collaboration Network for Industry, Manufacturing, Business and Logistics in Europe will develop the infrastructure for a cloud-based, Industrie 4.0, Internet-of-things-enabled B2B platform on which European manufacturing firms can register, publish machine-readable catalogs for products and services, search for suitable supply chain partners, negotiate contracts and supply logistics, and ...
Voir le projet

 17

 TERMINÉ 

Thrive! Entrepreneurial skills as solid base for a future in the Creative Industry

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

The “Thrive! Entrepreneurial skills as solid base for a future in the Creative Industry” project has as central aim to support the (young) (female) entrepreneurs and companies and its employees in the creative sector to go through a transformation and innovation process that is necessary to survive the present times and to become a company with a sustainable business case. The project results will ...
Voir le projet

 6

 TERMINÉ 

Audio Description: A Laboratory for the Development of a new Professional Profile

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Despite the incessant advocacy of an inclusive society and the growing need for accessible audiovisual (AV) products, the professional figures working in the field of audio description (AD) are still few, often untrained and not well defined. Furthermore, the provision of AD – i.e. verbal descriptions illustrating the visual elements of an AV product for the blind and visually impaired community – ...
Voir le projet

 8

 TERMINÉ 
The seven specific objectives of TOXI-triage address the operational; technological; ethical and societal dimensions of CBRN response and recovery, and importantly the economic base from which sustainable CBRN and multi-use systems are derived.19 partners in 4 Task forces will deliver 9 Work Packages (WPs) that address: end user specifications; Design and delivery; Test and Validation; and, Impact ...
Voir le projet

 19

 TERMINÉ 

European Materials Modelling Council (EMMC-CSA)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

The aim of the EMMC-CSA is to establish current and forward looking complementary activities necessary to bring the field of materials modelling closer to the demands of manufacturers (both small and large enterprises) in Europe. The ultimate goal is that materials modelling and simulation will become an integral part of product life cycle management in European industry, thereby making a strong c ...
Voir le projet

 15

 TERMINÉ 
The main objective of POWER2DM is to develop and validate a personalized self-management support system (SMSS) for T1 and T2 diabetes patients that combines and integrates (1) a decision support system (DSS) based on leading European predictive personalized models for diabetes interlinked with predictive computer models, (2) automated e-coaching functionalities based on Behavioural Change Theories ...
Voir le projet

 8

 TERMINÉ 
The European lighting industry aims at reducing cost, at continuously improving product performance while reducing time to market and enlarging the product. The main challenge for the design in of LED components into lighting systems is the temperature and current dependence of their performance. In order to achieve a good design of LED systems, a modular, multi-physics based modelling approach is ...
Voir le projet

 15

 TERMINÉ 
The AquaNES project will catalyse innovations in water and wastewater treatment processes and management through improved combinations of natural and engineered components. Among the demonstrated solutions are natural treatment processes such as bank filtration (BF), managed aquifer recharge (MAR) and constructed wetlands (CW) plus engineered pre- and post-treatment options. The project focuses on ...
Voir le projet

 30

 TERMINÉ 
MOEEBIUS introduces a Holistic Energy Performance Optimization Framework that enhances current (passive and active building elements) modelling approaches and delivers innovative simulation tools which (i) deeply grasp and describe real-life building operation complexities in accurate simulation predictions that significantly reduce the “performance gap” and, (ii) enhance multi-fold, continuous op ...
Voir le projet

 17

 TERMINÉ 

European FairShares Labs for Social and Blue Innovation

Date du début: 1 nov. 2016, Date de fin: 31 mars 2019,

Demographic change, social inclusion and the protection of the ecological system are main challenges of the near future not only in Europe with a huge impact on the economy, the welfare system and the job market. For some years now there is a movement of a so-called Blue- or Social Entrepreneurship. The EU Commission has already started to promote the movement of social innovations. Social busines ...
Voir le projet

 6

 TERMINÉ 

Ultra-Low PoweR technologIes and MEmory architectures for IoT (PRIME)

Date du début: 1 déc. 2015, Date de fin: 31 mars 2019,

The goal of the PRIME project is to establish an open Ultra Low Power (ULP) Technology Platform containing all necessary design and architecture blocks and components which could enable the European industry to increase and strengthen their competitive and leading eco-system and benefit from market opportunities created by the Internet of Things (IoT) revolution. Over 3 years the project will deve ...
Voir le projet

 19

 TERMINÉ 

Technology Advances and Key Enablers for 5 nm (TAKE5)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2019,

The TAKE5 project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 10nm technology node and the ECSEL JU project SeNaTe aiming at the 7nm technology node. The main objective of the TAKE5 project is the demonstration of 5nm patterning in line with the industry needs and the ITRS roadmap in the Advanced Patter ...
Voir le projet

 13

 TERMINÉ 

"City-zen, a balanced approach to the city of the future" (CITY-ZEN)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2019,

"City-zen deals with the development of the city of the future. The project has three major goals, 1- to realize more effective collaboration models and a methodology for development of smart cities, 2- to connect with industry, and have them develop technology to the benefit of smart cities and 3- to showcase to society ambitious pilot projects. Main idea for this project is that after successful ...
Voir le projet

 23

 TERMINÉ 

onlinE PrOfessional Development in Second chance Education

Date du début: 31 oct. 2016, Date de fin: 30 janv. 2019,

In 2014 the DIgital Second Chance Opportunities (DISCO) Consortium was established with support funding from Erasmus+ Strategic Partnership as digital technology and education are evolving at an increasingly rapid pace, both separately and together. For example, there have been significant developments in new digital technology platforms such as mobile technologies, cloud computing, social media, ...
Voir le projet

 8