Rechercher des projets européens

10 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
"In nuclear power plants, materials may undergo degradation due to severe irradiation conditions that may limit their operational life. Utilities that operate these reactors need to quantify the ageing and the potential degradations of some essential structures of the power plant to ensure safe and reliable plant operation. So far, the material databases needed to take account of these degradation ...
Voir le projet

 23

 TERMINÉ 

GEn IV and Transmutation MATerials (GETMAT)

Date du début: 1 févr. 2008, Date de fin: 31 oct. 2013,

In FP5 and FP6, a number of significant projects have been launched, aimed at investigating innovative strategies for safe and optimised radioactive waste management. In particular P/T strategies based on the use of Accelerator Driven Systems are being addressed within the integrated project EUROTRANS. Moreover, during FP6, projects were also initiated to study advanced systems, as defined in the ...
Voir le projet

 24

 TERMINÉ 

SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES (SERIES)

Date du début: 1 mars 2009, Date de fin: 31 juil. 2013,

"European seismic engineering research suffers from extreme fragmentation of research infrastructures (RI) between countries and limited access to them by the S/T community of earthquake engineering, especially that of Europe’s most seismic regions. A 23-strong Consortium of the key actors in Europe’s seismic engineering research (including 3 industrial partners) addresses these problems in a sust ...
Voir le projet

 23

 TERMINÉ 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Voir le projet

 30

 TERMINÉ 

Integrated European Industrial Risk Reduction System (IRIS)

Date du début: 1 oct. 2008, Date de fin: 31 mars 2012,

Current practices in risk assessment and management for industrial systems are characterized by its methodical diversity and fragmented approaches. In retrospect these risk and safety paradigms resulted from diverse industries driven and limited by available knowledge and technologies. A change based on industry driven R&D work is needed. At present the European Industry recognised their obligatio ...
Voir le projet

 37

 TERMINÉ 

REDOX PHENOMENA CONTROLLING SYSTEMS (RECOSY)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2012,

Main objectives of ReCosy are the sound understanding of redox phenomena controlling the long-term release/retention of radionuclides in nuclear waste disposal and providing tools to apply the results to Performance Assessment/Safety Case. Although redox is not a new geochemical problem, different questions are still not resolved and thus raised by implementers and scientists. From a top-down appr ...
Voir le projet

 32

 TERMINÉ 

Fusion Energy Materials Science – Coordination Action (FEMaS-CA)

Date du début: 1 oct. 2008, Date de fin: 30 sept. 2011,

The timely availability of qualified materials for use in fusion power reactors is a necessity for the fast deployment of fusion power. 27 European institutions have joined together in the FEMaS-CA to advance fusion materials science in Europe and in close cooperation with EFDA, the European Fusion Development Agreement. The overarching objective of this Coordination Action is: The FEMaS-CA w ...
Voir le projet

 31

 TERMINÉ 

Design Study of a European Facility for Advanced Seismic Testing (E-FAST)

Date du début: 1 sept. 2008, Date de fin: 31 août 2011,

"Earthquakes regularly occur throughout the world, frequently causing catastrophic harm and injury and always resulting in significant damage and widespread disorganization in the area. Modern society is increasingly vulnerable to external hazards, it is readily apparent that, in developed countries, although the numbers of victims of major earthquakes is tending to drop, the costs of the consequ ...
Voir le projet

 5

 TERMINÉ 
The European Sustainable Nuclear Energy Technology Platform (SNE-TP) was launched on 21 September 2007, has issued its Vision Report, and constituted its Working Groups. An «informal» secretariat has been supporting these operations. This secretariat evolved from the Organising Committee of the SNE-TP Launch Conference, with a small group of organisations (CEA, E.ON, UJV, FORATOM) committed to the ...
Voir le projet

 5

 TERMINÉ 
HycycleS aims at the qualification and enhancement of materials and components for key steps of thermochemical cycles for solar or nuclear hydrogen generation. The focus of HycycleS is the decomposition of sulphuric acid which is the central step of the sulphur based family of those processes, especially the hybrid sulphur cycle and the sulphur-iodine cycle. Breakthrough developments are targeted ...
Voir le projet

 9