Rechercher des projets européens

38 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

High density scalable optically interconnected Tb/s Board (Teraboard)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

Optical communications are becoming always more relevant because of the continuous growth of the requiested bandwidth. In the last decade we assisted a continuous growing of transport and metro netwotks, presently the bottleneck is in the processing of the huge amount of data constituted by the growing number of users, the capacity of the content that is exchanged and the convergence of Telecom an ...
Voir le projet

 10

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 
An optical network, like any system, has to be observable before it can become controllable and be subject to optimization, and this is the first capability ORCHESTRA introduces. ORCHESTRA’s high observability relies on information provided by the coherent transceivers that are extended, almost for free, to operate as software defined multi-impairment optical performance monitors (soft-OPM). Infor ...
Voir le projet

 6

 TERMINÉ 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Voir le projet

 16

 TERMINÉ 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Voir le projet

 24

 TERMINÉ 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Voir le projet

 19

 TERMINÉ 
5G will have to cope with a high degree of heterogeneity in terms of: (a) services (mobile broadband, massive machine and mission critical communications, broad-/multicast services and vehicular communications); (b) device classes (low-end sensors to high-end tablets); (c) deployment types (macro and small cells); (d) environments (low-density to ultra-dense urban); (e) mobility levels (static to ...
Voir le projet

 18

 TERMINÉ 
Multi-rate, multi-format and multi-reach operation of optical transceivers is important, but it is not enough for next generation terabit products. What is still missing to make these products viable is a solution for the flexible control of this enormous capacity at the optical layer and its distribution among a number of independent optical flows. PANTHER aims to provide this solution and develo ...
Voir le projet

 8

 TERMINÉ 

COnvergence of fixed and Mobile BrOadband access/aggregation networks (COMBO)

Date du début: 1 janv. 2013, Date de fin: 30 sept. 2016,

Fixed and mobile networks have been subjects to significant technological and architectural evolutions in the past years, with e.g. deployments of 4G mobile networks and FTTH fixed networks, as well as significant increase in traffic demand and access bandwidth both in fixed and mobile access networks. All these network evolutions lead to enormous investments in independent network infrastructures ...
Voir le projet

 20

 TERMINÉ 
Network operators are looking for cost effective solutions to manage and upgrade their networks to meet the user experience demanded by European citizens. The backhauling infrastructure is becoming a bottleneck.E3Network will design an E-band transceiver for the backhaul infrastructure of the future networks. It will work in the E-band, which enables highly focused "pencil beam" transmissions and ...
Voir le projet

 9

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 
The ubiquity of Internet access, and the wide variety of Internet-enabled devices and applications, have made the Internet a principal pillar of the Information Society. Decentralized and diverse, the Internet is resilient and universal. However, its distributed nature leads to operational brittleness and difficulty in identifying and tracking the root causes of performance and availability issues ...
Voir le projet

 17

 TERMINÉ 
DISCUS will analyse, design, and demonstrate a complete end-to-end architecture and technologies for an economically viable, energy efficient and environmentally sustainable future-proof optical network. It will provide a revolution in communications networks applicable across Europe and the wider world exploiting to the full the opportunity offered by LR-PONS and flat optical core networks to pro ...
Voir le projet

 12

 TERMINÉ 
Traffic demand is increasing dramatically, year on year, with typical growth figures of up to 60% for Internet based traffic. Such traffic increase is impacting on both network costs and power consumption. Moreover, traffic is not only increasing but becoming much more dynamic, both in time and direction. For these reasons, transport network evolution from current DWDM systems towards elastic opti ...
Voir le projet

 16

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

uBiquitous, secUre inTernet-of-things with Location and contExt-awaReness (BUTLER)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Voir le projet

 23

 TERMINÉ 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Voir le projet

 28

 TERMINÉ 
For the Next Generation Access Network (NGAN) wavelength division multiplexed passive optical networks (WDM PON) appear a promising and suitable solution offering almost unlimited bandwidth similarly to point-to-point links, while allowing the advantages of fibre sharing.It is widely recognized that WDM PON deployment requires colourless Optical Network Unit (ONU) transmitters, so that each user h ...
Voir le projet

 6

 TERMINÉ 

Total Airport Security System (TASS)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2014,

"TASS is a multi-segment, multi-level intelligence and surveillance system, aimed at creating an entire airport security monitoring solution providing real-time accurate situational awareness to airport authorities.The TASS concept is based on integrating different types of selected real time sensors & sub-systems for data collection in a variety of modes, including fixed and mobile, all suitable ...
Voir le projet

 22

 TERMINÉ 

low Energy COnsumption NETworks (ECONET)

Date du début: 1 oct. 2010, Date de fin: 31 déc. 2013,

Nowadays, it is widely recognised that the sole introduction of low consumption silicon elements will not be sufficient to effectively curb tomorrow's network energy requirements. Based on this assumption, the ECONET project will investigate, develop and test new capabilities for the Future Internet devices enabling the efficient management of power consumption so to strongly reduce the current en ...
Voir le projet

 15

 TERMINÉ 

UniverSelf

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

The internet of today is fragmented into loosely interacting domains. Future Networks will be pervasive: people, machines and the surrounding spaces will form decentralized and dynamic networks of networks of as-yet unseen scales. Future Networks will challenge Service and Network Operators to find the right ways to embed intelligence into networks in order to ensure their autonomic management an ...
Voir le projet

 22

 TERMINÉ 

SmartSantander

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

SmartSantander proposes a unique in the world city-scale experimental research facility in support of typical applications and services for a smart city. Tangible results are expected to greatly influence definition and specification of Future Internet architecture design from viewpoints of Internet of Things and Internet of Services.This unique experimental facility will be sufficiently large, op ...
Voir le projet

 24

 TERMINÉ 

MultimEDia transport for mobIlE Video AppLications (MEDIEVAL)

Date du début: 1 juil. 2010, Date de fin: 31 juil. 2013,

Video is a major challenge for the future Internet. This traffic type is foreseen to account for close to 90 percent of consumer traffic already by 2012. However, the current Internet, and in particular the mobile Internet, was not designed with video requirements in mind and, as a consequence, its architecture is very inefficient when handling video traffic. It is the vision of this consortium th ...
Voir le projet

 11

 TERMINÉ 

Emergency Support System (ESS)

Date du début: 1 juin 2009, Date de fin: 31 mai 2013,

"The Emergency Support System (ESS) is a suite of real-time data-centric technologies which will provide actionable information to crisis managers during abnormal events. This information will enable improved control and management, resulting in real time synchronization between forces on the ground (police, rescue, firefighters) and out-of-theater command and control centers (C&C). The approach g ...
Voir le projet

 21

 TERMINÉ 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Voir le projet

 27

 TERMINÉ 
The goal of OUTSMART is to contribute to the Future Internet (FI) by aiming at the development of five innovation eco-systems. These eco-systems facilitate the creation of a large variety of pilot services and technologies that contribute to optimised supply and access to services and resources in urban areas. This will contribute to more sustainable utility provision and, through increased effici ...
Voir le projet

 29

 TERMINÉ 

Future INternet for Smart ENergY (FINSENY)

Date du début: 1 avr. 2011, Date de fin: 30 avr. 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Voir le projet

 41

 TERMINÉ 

Economics and Technologies for Inter-Carrier Services (ETICS)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

ETICS aims at creating a new ecosystem of innovative QoS-enabled interconnection models between Network Service Providers allowing for a fair distribution of revenue shares among all the actors of the service delivery value-chain. To this end, we will propose and analyze new business and regulatory models for converged infrastructures, taking into account applications' QoS constraints and incentiv ...
Voir le projet

 18

 TERMINÉ 

SAIL: Scalable & Adaptive Internet soLutions (SAIL)

Date du début: 1 août 2010, Date de fin: 28 févr. 2013,

SAIL's objective is the research and development of novel networking technologies using proof-of-concept prototypes to lead the way from current networks to the Network of the Future.SAIL leverages state of the art architectures and technologies, extends them as needed, and integrates them using experimentally-driven research, producing interoperable prototypes to demonstrate utility for a set of ...
Voir le projet

 26

 TERMINÉ 
Internet traffic has been growing quickly for many years, despite adverse economic conditions and this growth will continue in the future. To cope with this evolution, the cost of today's network solutions is still too high.In addition, in line with the EC goal of reducing the overall emissions, energy efficiency should be widely improved, using whenever possible optics instead of electronics wher ...
Voir le projet

 19

 TERMINÉ 
In current wireless communications, radio spectrum and infrastructure are typically used such that interference is avoided by exclusive allocation of frequency bands and employment of base stations. SAPHYRE will demonstrate how equal-priority resource sharing in wireless networks improves spectral efficiency, enhances coverage, increases user satisfaction, leads to increased revenue for operators, ...
Voir le projet

 12

 TERMINÉ 

Advanced Radio Interface Technologies for 4G Systems (ARTIST4G)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

The first 3GPP Long Term Evolution standard version is complete and ready to be deployed. Although it increases peak data rate and spectral efficiency compared to legacy techniques, cell-edge and average user throughputs are still significantly lower than the peak rates. In the LTE-Advanced Study Item, ways to extend LTE are being explored. However, some of the considered techniques are complex an ...
Voir le projet

 18

 TERMINÉ 

Energy Aware Radio and neTwork tecHnologies (EARTH)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

Telecommunication networks and in particular mobile communications are increasingly contributing to global energy consumption. The EARTH proposal tackles the important issue of energy saving by enhancing the energy efficiency of mobile broadband systems thereby reducing CO2 emissions. It is a highly ambitious and unique proposal, applying an integrated approach to investigate the energy efficiency ...
Voir le projet

 15

 TERMINÉ 
The aim of the ISISEMD project is to provide a pilot of innovative intelligent set of scalable services that will support the independent living of elderly people in general and in particular the group of elderly with cognitive problems or mild dementia and at the same time to support the formal and informal caregivers in their daily interaction with the elderly. The services will improve the elde ...
Voir le projet

 15

 TERMINÉ 
Experimentally driven research is key to success in today's Internet. Many test beds support research and development, and product prototyping in communication networks. However, they tend to specialise in particular access technologies or services, or explore near term product offerings, often with limited availability and openness. An open and sustainable large-scale shared experimental facility ...
Voir le projet

 30

 TERMINÉ 

4WARD - Architecture and Design for the Future Internet (4WARD)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Today's network architectures are stifling innovation, restricting it mostly to the application level while the need for structural change is increasingly evident. The absence of adequate facilities to design, optimize and interoperate new networks currently forces a convergence to an architecture that is suboptimal for many applications and that cannot support innovations within itself, the Inter ...
Voir le projet

 39

 TERMINÉ 
GEYSERS vision is to qualify optical infrastructure providers and network operators with a new architecture, to enhance their traditional business operations. Optical network infrastructure providers will compose logical infrastructures and rent them out to network operators; network operators will run cost-efficient, dynamic and mission-specific networks by means of integrated control and managem ...
Voir le projet

 20

 TERMINÉ 

End-to-End Efficiency (E3) (E3)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2009,

The End-to-End Efficiency (E3) project is an ambitious FP7 EC Integrated Project (IP) aiming at integrating cognitive wireless systems in the Beyond 3G (B3G) world, evolving current heterogeneous wireless system infrastructures into an integrated, scalable and efficiently managed B3G cognitive system framework. The key objective of the E3 project is to design, develop, prototype and showcase solut ...
Voir le projet

 23