Rechercher des projets européens

15 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Voir le projet

 37

 TERMINÉ 

PELlets versus GRanulates: Irradiation, Manufacturing & Modelling (PELGRIMM)

Date du début: 1 janv. 2012, Date de fin: 30 juin 2017,

PELGRIMM is a 4 year project, addressing Minor-Actinide (MA) bearing fuel developments for Generation IV Fast Reactor Systems to support the Strategic Research Agenda (SRA) of the European Sustainable Nuclear Energy –Technology Platform (SNE-TP). Both options, MA homogeneous recycle in driver fuels with MA content at a few percent, and heterogeneous recycle on UO2 fuels bearing high MA contents, l ...
Voir le projet

 12

 TERMINÉ 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Date du début: 1 sept. 2013, Date de fin: 30 sept. 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Voir le projet

 52

 TERMINÉ 
Safety issues are of fundamental importance for the acceptance and sustainable application of nuclear energy. Actinides play a central role in the nuclear fuel cycle from mining, fuel fabrication, energy production, up to treatment of used fuel by reprocessing, partitioning and transmutation and/or finally management and disposal of radioactive waste. A fundamental understanding of actinide proper ...
Voir le projet

 12

 TERMINÉ 
The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration demonstrator fully meeting the market needs, in support of the Nuclear Cogeneration European Industrial Initiative.Following the reference EUROPAIRS project and in close collaboration with the ongoing ARCHER project, national projects (e.g. Polish HTRPL, German S ...
Voir le projet

 22

 TERMINÉ 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Voir le projet

 34

 TERMINÉ 
This project addresses the issue of safe indoor use of hydrogen and fuel cells systems (priority 4.6 of the call FCH-JU-2010-1) for early markets (forklift refuelling and operation, back-up power supply, portable power generation, etc.): It aims to provide scientific and engineering knowledge for the specification of cost-effective means to control hazards specific to the use of hydrogen indoors o ...
Voir le projet

 10

 TERMINÉ 

"SNETP Management, Implementation, Liaison and Evolution" (SMILE)

Date du début: 1 juin 2011, Date de fin: 31 mai 2014,

"The European Sustainable Nuclear Energy Technology Platform (SNETP) was launched in 2007, and has since then issued its strategic documents. Several Working Groups have been constituted in 2010 to coordinate the implementation of the three “pillars” of the SNETP vision:- The ESNII Task Force has started preparing a “European Industrial Initiative” on Fast Neutron Reactors and closed fuel cycle- A ...
Voir le projet

 6

 TERMINÉ 
The malevolent use of Anthrax spores on civilians in late 2001 has shown the necessity to protect European citizens from criminal use of biological agents and viruses. Although these attacks had been punctual and crude, more sophisticated attacks on dozens or hundreds of injured or killed people are conceivable. When launching such an attack its success depends on concentrating a sufficient amount ...
Voir le projet

 9

 TERMINÉ 

ACTINET Integrated Infrastructure Initiative (ACTINET-I3)

Date du début: 1 oct. 2009, Date de fin: 31 janv. 2013,

"Actinides play a central role in the nuclear energy generation systems. In order to keep a leading position in the field of nuclear energy – both in terms of safety and efficient use of natural resources – Europe needs to reinforce its expertise and to prepare the next generation of scientists and engineers who will be able to contribute to develop actinide management strategies based on sound sc ...
Voir le projet

 10

 TERMINÉ 

NUclear Reactor Integrated Simulation Project (NURISP)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2012,

The target of the proposed NURISP Collaborative Project is to make new and significant steps towards a European Reference Simulation Platform for applications relevant to present PWR and BWR and to future reactors. The roadmap of this Simulation Platform will be proposed to be part of the future Strategic Research Agenda of the Sustainable Nuclear Energy Technology Platform (SNE-TP). The first st ...
Voir le projet

 23

 TERMINÉ 

Basic Research for Innovative Fuels Design for GEN IV systems (F-BRIDGE)

Date du début: 1 mars 2008, Date de fin: 29 févr. 2012,

Up to now fuel development and qualification has been a long and expensive process essentially based on an empirical approach. European experts currently have an adequate knowledge of conventional fuel manufacturing and its behaviour under operating conditions encountered during 50 years of industrial application and R&D activities. For innovative fuel systems, however, the empirical approach has ...
Voir le projet

 19

 TERMINÉ 

ADvanced Reactor Initiative And Network Arrangement (ADRIANA)

Date du début: 1 févr. 2010, Date de fin: 31 juil. 2011,

"The coordinating action ADRIANA (ADvanced Reactor Initiative And Network Arrangement) is proposed to setting up the network dedicated to the construction and operation of research infrastructures in support of developments for the European Industrial Initiative for sustainable nuclear fission. The project as the base for the current long-term taking place coordination activities of Euroatom under ...
Voir le projet

 15

 TERMINÉ 
The European Sustainable Nuclear Energy Technology Platform (SNE-TP) was launched on 21 September 2007, has issued its Vision Report, and constituted its Working Groups. An «informal» secretariat has been supporting these operations. This secretariat evolved from the Organising Committee of the SNE-TP Launch Conference, with a small group of organisations (CEA, E.ON, UJV, FORATOM) committed to the ...
Voir le projet

 5

 TERMINÉ 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Voir le projet

 27