Rechercher des projets européens

16 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Combining Optics and SDN In next Generation data centre Networks (COSIGN)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

The role of Data Centres (DCs) is vital for the Future Internet. However, DC infrastructures are already stressed by data volumes and service provisioning and consumption trends. Emerging demands cannot be addressed by today's DCs and call for a massive redesign or even transformation of DC architectures.COSIGN proposes a new DC architecture empowered by advanced optical technologies and will demo ...
Voir le projet

 14

 TERMINÉ 
DOLFIN addresses the demand/response and energy stabilisation scenario of the Smart Grid by optimising the energy consumption of Data Centres (DC), accompanied, if necessary, with a respective negotiation and readjustment of the DC's Service Level Agreements (SLAs). To achieve this, DOLFIN adopts an innovative energy closed control loop that targets to deliver the following advancements:• Create a ...
Voir le projet

 10

 TERMINÉ 

FEderated Test-beds for Large-scale Infrastructure eXperiments (FELIX-EU)

Date du début: 1 avr. 2013, Date de fin: 30 juin 2016,

Description The primary objective of the FELIX project is to create a common framework in which users can request, monitor and manage a slice provisioned over distributed and distant Future Internet experimental facilities in Europe and Japan. FELIX, submitted as a joint effort of two independent consortia (i.e. FELIX-EU in Europe, FELIX-JP ...
Voir le projet

 6

 TERMINÉ 

Programmability In RINA for European supremacy of virTualised NEtworks (PRISTINE)

Date du début: 1 janv. 2014, Date de fin: 30 juin 2016,

The Internet as the global communications infrastructure has been successful in shaping the modern world by the way we access and exchange information. The Internet architecture designed in the 1960's has been supporting a variety of applications and offering a number of services till now but emerging applications demand better quality, programmability, resilience and protection. Any alterations t ...
Voir le projet

 16

 TERMINÉ 

Trilogy 2: Building the Liquid Net (Trilogy 2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

This Trilogy 2 project is a 3-year Small or medium-scale focused research project (STREP) targeting Challenge 1 of the 7th FrameworkProgramme: "Pervasive and Trusted Network and Service Infrastructures".The project scope lies entirely within Objective 1.1, "Future Networks"and in particular in bullet c) Novel Internet architectures, management and operation frameworks.The aim of the project is to ...
Voir le projet

 11

 TERMINÉ 
CONTENT will focus on developing next generation high capacity end-to-end, heterogeneous infrastructure technologies to support the network of the future. The model proposed will be based on the Infrastructure as a Service (IaaS) paradigm and provide a technology platform interconnecting geographically distributed IT resources that can support a variety of Cloud services. This platform will includ ...
Voir le projet

 7

 TERMINÉ 
The main objective of the LIGHTNESS project is the design, implementation and experimental evaluation of high performance data centre interconnects through the introduction of innovative photonic switching and transmission inside data centres. Harnessing the power of optics will enable data centres to effectively cope with the unprecedented demand growth to be faced in the near future, which will ...
Voir le projet

 7

 TERMINÉ 
Amongst the few distinctive European alliances carrying the promise of making a lasting impact in software-defined networking (SDN) and the IT industry is the research and industrial communities pursuing developments in the Path Computation Element (PCE), an effort "made-in-the-EU". In regards to PCE design, deployment, and evolution, Europeans are amongst today's leaders in the process of transit ...
Voir le projet

 8

 TERMINÉ 
This proposal details activities that will ensure the continued enhancement and ongoing operation of the leading-edge GÉANT network, supporting a range of network and added-value services, targeted at users across the GÉANT service area.In the area of multi-domain network service operation, GN3plus plans to deliver fast, efficient provisioning of advanced services, develop operational support acro ...
Voir le projet

 72

 TERMINÉ 

Investigating RINA as an Alternative to TCP/IP (IRATI)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

Driven by the requirements of the emerging applications and networks, the Internet has become an architectural patchwork of growing complexity which strains to cope with the changes. Moore's law prevented us from recognising that the problem does not hide in the high demands of today's applications but lies in the flaws of the Internet's original design. The Internet needs to move beyond TCP/IP to ...
Voir le projet

 6

 TERMINÉ 

Future Internet testbeds/experimentation between BRazil and Europe - EU (FIBRE-EU)

Date du début: 1 juin 2011, Date de fin: 31 juil. 2014,

In the last two decades networks, and especially the Internet, have become part of the critical infrastructure of governments, businesses, homes and schools. The current Internet architecture, designed about 30 years ago, has suffered many extensions in recent years, to include new functionalities, which were unforeseen in the original design. Many network experts now consider it is necessary to u ...
Voir le projet

 9

 TERMINÉ 

Building service testbeds on FIRE (BonFIRE)

Date du début: 1 juin 2010, Date de fin: 31 déc. 2013,

Description BonFIRE will design, build and operate a multi-site Cloud prototype FIRE facility to support research across applications, services and systems at all stages of the R&D lifecycle, targeting the services research community on Future Internet.The BonFIRE vision is to give researchers in these areas access to a facility that support ...
Voir le projet

 26

 TERMINÉ 
The CHANGE project addresses a central problem of today's Internet: its size and scope make innovation through the introduction of new core network technologies very difficult. The Internet suffers from "ossification". Even minor changes only happen through the accretion of point solutions that embed knowledge in the network, optimizing today's applications at the expense of tomorrow's.The goal of ...
Voir le projet

 11

 TERMINÉ 

Economics and Technologies for Inter-Carrier Services (ETICS)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

ETICS aims at creating a new ecosystem of innovative QoS-enabled interconnection models between Network Service Providers allowing for a fair distribution of revenue shares among all the actors of the service delivery value-chain. To this end, we will propose and analyze new business and regulatory models for converged infrastructures, taking into account applications' QoS constraints and incentiv ...
Voir le projet

 18

 TERMINÉ 

Metro Architectures enablINg Sub-wavelengths (MAINS)

Date du début: 1 janv. 2010, Date de fin: 30 sept. 2012,

Metro Architectures Enabling Sub-Wavelengths is a project that directly addresses the central theme of the 4th Call for Pervasive & Trustworthy Network & Service Infrastructure. This central theme is the recognition worldwide that the network architectures of the last 20 years were never designed to cope with the new types of demands driven by phenomenon like the Internet, Video, Search, Social Ne ...
Voir le projet

 6

 TERMINÉ 
GEYSERS vision is to qualify optical infrastructure providers and network operators with a new architecture, to enhance their traditional business operations. Optical network infrastructure providers will compose logical infrastructures and rent them out to network operators; network operators will run cost-efficient, dynamic and mission-specific networks by means of integrated control and managem ...
Voir le projet

 20