Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Master in Work, Organizational and Personnel Psychology

Date du début: 19 sept. 2016, Date de fin: 18 sept. 2021,

...at aims to provide excellent experts in WOP-P for an increasingly globalized socio-economic context. It is implemented by an International Consortium. European partner institutions are: University of Valencia (Coordinating Institution), University of Bologna; University of Barcelona, and University of Coimbra. Non-European partners are: University of Guelph, University of Brasilia, University of B ...
Voir le projet

 10

 TERMINÉ 

ACTivating InnoVative IoT smart living environments for AGEing well (ACTIVAGE)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2020,

ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Voir le projet

 50

 TERMINÉ 

Small farms, small food businesses and sustainable food security (SALSA)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2020,

SALSA will assess the role of small farms and small food businesses in delivering a sustainable and secure supply of affordable, nutritious and culturally adequate food. SALSA will identify the mechanisms which, at different scales, can strengthen the role of small farms in food systems and thereby support sustainable food and nutrition security (FNS). By considering a gradient of 30 reference reg ...
Voir le projet

 17

 TERMINÉ 
The Transportation sector employs over 10 million persons in the EU today. At the same time, Transport is a social sector that is rapidly developing, changing and being influenced to the maximum extent by the development of automation, electrification and greening of transport, among others, thus facing problems in staffing its several domains with appropriate and qualified personnel. This fact, m ...
Voir le projet

 21

 TERMINÉ 
Organized Crime and Terrorist Networks (OC/TN) are a major challenge for the European Union and many different stakeholder groups are involved in creating awareness, preventing, identifying and intervene in case of risk or threat. But in order to develop better strategies and instruments, we still need a deeper understanding of these phenomena.TAKEDOWN therefore aims at generating such novel insig ...
Voir le projet

 19

 TERMINÉ 

Interfaces in opto-electronic thin film multilayer devices (INFORM)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

Development of new materials over the past decade paved the way for organic/hybrid electronics into commercial applications. Now, perfection of material interfaces in organic/hybrid thin-film devices is key to drive the technology further and enable new, more advanced applications. INFORM offers a paradigm shift from focusing on materials to focusing on devices by probing, modelling and controllin ...
Voir le projet

 11

 TERMINÉ 

European Exascale System Interconnect and Storage (ExaNeSt)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

ExaNeSt will develop, evaluate, and prototype the physical platform and architectural solution for a unified Communication and Storage Interconnect and the physical rack and environmental structures required to deliver European Exascale Systems. The consortium brings technology, skills, and knowledge across the entire value chain from computing IP to packaging and system deployment; and from opera ...
Voir le projet

 12

 TERMINÉ 
The PHOCNOSIS project aims at the development and the preclinical validation of a nanotechnology-based handheld point-of-care testing (POCT) analysis device for its application in the early diagnosis of cardiovascular diseases (CVD). The diagnosis will be carried out by means of the fast (
Voir le projet

 10

 TERMINÉ 
INSPEC2T projects’ scope is to develop a sustainable framework for Community Policing that effectively addresses and promotes seamless collaboration between the police and the community. INSPEC2T approach bases its conceptual foundations on EU crime prevention and Member States specific Internal Security Policies, validated research results and best practices from cooperation between police and lo ...
Voir le projet

 19

 TERMINÉ 
The DROPSA consortium will create new knowledge and understanding of the damage and losses of fruit crops resulting from pests and pathogens, with a specific focus on the new and emerging threats due to Drosophila suzukii and quarantine pathogens Pseudomonas syringae, Xanthomonas fragariae and X. arboricola. The project will deliver a cost effective approach that can be widely implemented by the E ...
Voir le projet

 27

 TERMINÉ 
Europe has invoked the SET-Plan to design and implement an energy technology policy for Europe to accelerate the development and deployment of cost-effective renewable energy systems, including photovoltaics. With lower cost of solar electricity, PV could significantly contribute to the achievements of the 20-20-20 objectives.The Joint Program on PV of the European Energy Research Alliance (EERA-P ...
Voir le projet

 37

 TERMINÉ 
The forecasted increase in the number of older people for this century will be accompanied by an increase of those with disabilities. Disability is usually preceded by a condition named frailty that encompasses changes associated with ageing, life styles and chronic diseases. To detect and intervene on it is of outstanding importance to prevent disability, as recovery from disability is unlikely. ...
Voir le projet

 29

 TERMINÉ 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Voir le projet

 24

 TERMINÉ 

VALENCIA EMPLEA II

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

The VLC EMPLEA project is a joint initiative undertaken by the Foundation Pact for Employment with 4 VET centers in the municipality of Valencia, the Consortium is composed by: - FoundationPact for Employment ( Consortium coordinator ) - INTER Institute - Sociedad Cooperativa Valenciana Juan Comenius - Professional School Xavier - TAES Centre The project arises from the need to provide great ...
Voir le projet

 26

 TERMINÉ 
The main goal of the ENHANCE project is to develop and analyse new ways to enhance society’s resilience to catastrophic natural hazard impacts, by providing new scenarios and information in selected hazard cases in close collaboration with stakeholders, and by contributing to the development of new multi-sector partnerships (MSPs) to reduce or redistribute risk. Innovation in MSPs is essential, a ...
Voir le projet

 24

 TERMINÉ 
The objective of the FIGARO project is to significantly reduce the use of fresh water on farm level through developing a cost-effective, precision irrigation management platform. The platform will be structured for data acquisition from monitoring devices and forecasting tools, data interpretation, system control, and evaluation mechanisms enabling full decision support for end users at farm scale ...
Voir le projet

 18

 TERMINÉ 
...chnology, Cyprus, d) Marmara University Pendik Research and Training Hospital, e) Azienda Ospedaliera Universitaria Senese, Italy, f) University College Lillebaelt, Denmark, g) Universitat De Valencia, Spain. The partnership is a mixture of universities, VET institutions and hospital services The project will begin with a rigorous review of the literature around culturally competent compassion (t ...
Voir le projet

 7

 TERMINÉ 

Technology Transfer in Computing Systems (TETRACOM)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

The mission of the TETRACOM Coordination Action is to boost European academia-to-industry technology transfer (TT) in all domains of Computing Systems. While many other European and national initiatives focus on training of entrepreneurs and support for start-up companies, the key differentiator of TETRACOM is a novel instrument called Technology Transfer Project (TTP). TTPs help to lower the barr ...
Voir le projet

 33

 TERMINÉ 

SEcure Cloud computing for CRitical infrastructure IT (SECCRIT)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

"Cloud Computing is a style of computing where elastic IT-related capabilities are provided as optimized, cost-effective, and on-demand utility-like services to customers using Internet technologies. Being one of the major trends in the IT industry recently, it has gained tremendous momentum and started to revolutionize the way enterprises create and deliver IT solutions. As more sectors adopt clo ...
Voir le projet

 10

 TERMINÉ 
The project in briefMost Mediterranean countries share the challenges of rapid shoreline development, extreme seasonal fluctuation in populations, vulnerability to coastal hazards and eroding environmental quality. Yet many of these countries are also characterized by inadequate planning, management and enforcement of the regulations, as well as the lack of solid database to assist decision makers ...
Voir le projet

 11

 TERMINÉ 
The ST-FLOW Project merges the efforts of 14 leading European research groups for developing material and computational standards that enable the forward-design of prokaryotic systems with a degree of robustness and predictability that is not possible with customary Genetic Engineering. The central issue at stake is the identification and implementation of rules that allow the conversion of given ...
Voir le projet

 15

 TERMINÉ 

Future Internet Technologies for MANufacturing (FITMAN)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

According to the 2010 EC Competitiveness Report, Manufacturing is still the driving force of Europe's economy, contributing over € 6553 billion in GDP and providing more than 30 million jobs. It covers more than 25 different industrial sectors, largely dominated by SMEs, and generates annually over € 1535 billion (42%) worth of value added services.The mission of the FITMAN (Future Internet Techno ...
Voir le projet

 41

 TERMINÉ 
"Today, attackers are using more sophisticated technologies, making existing “add-on” security solutions obsolete or insufficient, and the number of stakeholders involved –both human and machines– is always increasing. Thus, design and embedding of new security mechanisms directly into the systems is needed to drastically increase reliability and security levels, and provide higher levels of resil ...
Voir le projet

 9

 TERMINÉ 

ICT based System to Predict & Prevent Falls (iStoppFalls)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2014,

Description ISTOPPFALLS develops and implements ICT based technologies for fall prediction and prevention and integrates them in daily life practices of older people living at home. They allow for exercise training and fall risk assessment with discrete measuring technologies and adaptive assistance functions. The Senior Mobility Monitor (SM ...
Voir le projet

 7

 TERMINÉ 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Voir le projet

 143

 TERMINÉ 

Clean European Rail - Diesel (CleanER-D)

Date du début: 1 juin 2009, Date de fin: 31 janv. 2014,

The study of CER, UNIFE, UIC and Euromot of the railway and engine manufacturing industries concluded on a risk of disruptive effect of the NRMM Directive application on the railway diesel vehicle supply market, leading to a possible risk of a partial modal shift from rail to road on regional passenger lines and freight transportation specialized routes, with even foreseeable consequences on the o ...
Voir le projet

 27

 TERMINÉ 

Future Internet Testing (FITTEST)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2013,

The Future Internet will be a complex interconnection of services, applications, content and media, on which our society will become increasingly dependent for critical activities such as public utilities, social services, government, learning, finance, business, as well as entertainment. Consequently, Future Internet applications have to meet high quality demands.Testing is the mostly used qualit ...
Voir le projet

 7

 TERMINÉ 
"Wind energy currently provides approximately 3% of the overall European electricity production. However, with the current growth trends exhibited the wind energy industry is capable of delivering 12% of the overall European power production by 2020 and more than 20% by 2030.Operation and maintenance costs (O&M) constitute a sizeable share of the total annual costs of a wind turbine. For a new mac ...
Voir le projet

 9

 TERMINÉ 
A major challenge facing European industry involves the development of more specific, energy saving processes with less environmental impact. The recent development of Metal Organic Frameworks (MOFs) may prove a major milestone in achieving these goals. MACADEMIA project is an extension to an FP6 STREP (DeSANNS) which highlighted some MOF materials for CO2 capture and storage. It will expand and c ...
Voir le projet

 17

 TERMINÉ 
Human life and the entire ecosystem of South East Asia depend upon the monsoon climate and its predictability. More than 40% of the earth's population lives in this region. Droughts and floods associated with the variability of rainfall frequently cause serious damage to ecosystems in these regions and, more importantly, injury and loss of human life. The headwater areas of seven major rivers in S ...
Voir le projet

 18

 TERMINÉ 
Description ARtSENSE tackles a very important problem in the modern usage of ICT in cultural heritage domain: bridging the gap between the digital world with the physical in a highly flexible way in order to enable a novel, adaptive cultural experience.ARtSENSE aims to develop an active assistants which looks over the user’s shoulder (physic ...
Voir le projet

 10

 TERMINÉ 

Anticipating the Network of the Future - From Theory to Design (Euro-NF)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2012,

Future networks became a central topic with a large debate whether moving towards the new networked society will be evolutionary or disruptive. In the future networked society the physical and the digital worlds will merge based on the massive usage of wireless sensor networks. Objects will be able to identify and locate themselves and to communicate through radio interfaces. Self-organized edge n ...
Voir le projet

 37

 TERMINÉ 

Virtual multidisciplinary EnviroNments USing Cloud infrastructures (VENUS-C)

Date du début: 1 juin 2010, Date de fin: 31 mai 2012,

Several research communities in Europe exploit e-Infrastructures, sharing data and computing resources with Grid and Supercomputing technology. However the inherent complexity of these technologies has limited their wider adoption and their long term sustainability: designing, developing and operating a computing infrastructure for an e-Science community remains challenging and costly.VENUS-C will ...
Voir le projet

 16

 TERMINÉ 

Governing the speed of light (GOSPEL)

Date du début: 1 sept. 2008, Date de fin: 31 déc. 2011,

The GOSPEL project aims at developing new, highly effective technologies for enabling slow and fast light propagation as a tunable feature in photonic devices. In fact, controlling the speed of light offers a solution to a necessary, and often missing, functionality in broadband ICT systems: a time-delay/phase-shift line. The proposed research will address three slow and fast light device platform ...
Voir le projet

 8

 TERMINÉ 
"The number of road fatalities in Member States is decreasing too slowly to meet the EU-targets. A new generation of measures is needed, underpinned by a new generation of research methods. Recent technology developments allow for this: naturalistic observations. This means that road user behaviour is observed unobtrusively in a natural setting for a longer period of time. This technique allows fo ...
Voir le projet

 11

 TERMINÉ 

Architectures for fLexible Photonic Home and Access networks (ALPHA)

Date du début: 1 janv. 2008, Date de fin: 31 mars 2011,

The ALPHA project addresses the challenges of building the future access and all types of in-building networks for home and office environments. The proposal supports the evolution towards a cognitive network by dynamically utilising the resources of an optical network infrastructure to support a heterogeneous environment of wired and wireless technologies.The project investigates innovative archi ...
Voir le projet

 17

 TERMINÉ 

Building the Future Optical Network in Europe: The e-Photon/ONe Network (BONE)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

Description Building the Future Optical NetworkMain ObjectivesThe BONE-network brings together 49 laboratories and research institutes from al over Europe in a close networking infrastructure, built on the foundations laid down by the FP6 ePhoton/ONe Network and represents the research activities within Europe in the field of Optical Netw ...
Voir le projet

 53

 TERMINÉ 

European Development Opportunities in Rural Areas (EDORA)

Date du début: 31 août 2008, Date de fin: 31 août 2010,

The reform of the Common Agricultural Policy in the framework of the Agenda 2000 boosted the significance of rural development in this sector policy. Rural development, in line with the Lisbon/Gothenburg Strategy, is conceived to support job creation and economic growth in rural areas in a sustainable way. Against this backdrop, this project will provide evidence on the development opportunities o ...
Voir le projet

 16

 TERMINÉ 

Enabling Grids for E-sciencE III (EGEE-III)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2010,

A globally distributed computing Grid now plays an essential role for large-scale, data intensive science in many fields of research. The concept has been proven viable through the Enabling Grids for E-sciencE project (EGEE and EGEE-II, 2004-2008) and its related projects. EGEE-II is consolidating the operations and middleware of this Grid for use by a wide range of scientific communities, such as ...
Voir le projet

 167

 TERMINÉ 
"There is a well documented relationship between speed and collisions. Excessive and inappropriate speed is the single biggest contributory factor in fatal road crashes. It increases both the risk of a crash happening and the severity of injuries resulting from crashes. Speed – which encompasses excessive speed (i.e. driving above the speed limits) or inappropriate speed (driving too fast for th ...
Voir le projet

 14