Rechercher des projets européens

8 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...omization and reshoring. Emphasis will be paid in the study of migration options from legacy centralized architectures, to emerging FAR-EDGE based ones.FAR-EDGE will be validated in real-life plants (VOLVO, WHIRLPOOL) in the scope of user-driven scenarios (business-cases) for mass-customization and reshoring, where tangible improvements relating to reliability, productivity increase, quality cost, ...
Voir le projet

 12

 TERMINÉ 

Automated Driving Applications and Technologies for Intelligent Vehicles (AdaptIVe)

Date du début: 1 janv. 2014, Date de fin: 30 juin 2017,

AdaptIVe will enhance the performance and improve the acceptance of automated driving of cars and trucks. The project develops new and integrated automated functions to improve traffic safety by minimizing the effects of human errors and to enhance traffic efficiency by smoother flows and reduced congestion.The approach is based on a shared control concept, assuring proper collaboration between th ...
Voir le projet

 32

 TERMINÉ 

Technical Development, Innovation and Leadership in European Mobility Projects

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

Gothenburg Technical College is the result of a unique private/public sector collaboration between Volvo Car Corperation, Volvo Group and the municipalty of Gothenburg. The College is jointly owned and managed by both organizations. The purpose of GTC is to provide high quality technical education within the technical industrial sector. GTC has for many years sent about 35 students abroad in Europ ...
Voir le projet

 13

 TERMINÉ 
The number of sensors and the amount of data gathered on the factory floor constantly increases. This opens the vision of truly connected production processes where information is exchanged seamlessly and in real time between humans, machines and the produced goods.However, it is a long way before the huge amount of information gathered and generated in separate disconnected sub-systems is present ...
Voir le projet

 13

 TERMINÉ 

Design as driver of innovation and competitiveness (DESMA)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

"DESMA is a training network including 4 leading universities, 4 design consultancies and 4 product and service organizations in the area of Design Management - an area of research and practice that is concerned with the dynamic intersection of design and management. The great potential of design as a driver of innovation and competitiveness is increasingly celebrated in the popular and scholarly ...
Voir le projet

 13

 TERMINÉ 
Current digital manufacturing ICT platforms have provided a series of tools, including CAx, PDM and PLM systems, to support engineers in a series of collaborative activities, allowing them to communicate as well as to design and validate the manufacturing processes.However, they still have a long way to go for effectively addressing engineering knowledge management issues:- Today's ERP systems are ...
Voir le projet

 14

 TERMINÉ 

Innovative advanced Wood-based Composite Materials and Components (WOODY)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2012,

Currently the world of polymeric composite materials is almost exclusively based on fossil derived components. This fact represents a strong issue, as the non-renewable global oil resources are being exploited year after year, also as a consequence of the ever growing demand for plastics engineering materials. WOODY Project goal is to develop new composite panels and laminates from wood derived re ...
Voir le projet

 19

 TERMINÉ 

Highly Automated Vehicles for Intelligent Transport (HAVE-it)

Date du début: 1 févr. 2008, Date de fin: 31 juil. 2011,

Description The groundbreaking HAVEit proposal aims at the long-term vision of highly automated driving. Within this proposal important intermediate steps will be developed, validated and demonstrated. These intermediate results on the one hand offer high potential for exploitation within 3-5 years after HAVEit and on the other hand form the ...
Voir le projet

 29