Rechercher des projets européens

16 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Adult Education as a Means for Active Participatory Citizenship (EduMAP)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2019,

The existing research and policy reports show that adult education policies and practices are designed and carried out in ways and using means which are not always appropriate to vulnerable minority groups. In the EduMAP Project the diversity of societal participation and the wide range of cultural contexts and communicative practices among learners will be acknowledged. In particular, the educati ...
Voir le projet

 10

 TERMINÉ 

Energy Efficient and Ecological Housing (ECOHOUSING)

Date du début: 30 avr. 2011, Date de fin: 30 déc. 2013,

Finland, Estonia and Latvia have made plans how to save energy, compensate the use of fossil energy sources by renewable energy sources. Important domestic source is wood and other biomass in different forms. Through the project the partners in Finland, Estonia and Latvia will collect information of heating technology, boilers and devices utilizing wood energy and other bioenergy in different form ...
Voir le projet

 6

 TERMINÉ 

Concepts for using reed biomass as local bioenergy and building material (COFREEN)

Date du début: 30 avr. 2010, Date de fin: 31 mars 2013,

Interreg IIIA interdisciplinary ”Reed Strategy in Estonia and Finland” project brought out the concept of integrated coastal planning and Reed Strategy in 2007. It created a framework for wider utilization and gave an idea for the new project, which focuses on the bioenergy production with reed, and looks for new ways to use reed in the construction industry. COFREEN-project delves deep into utili ...
Voir le projet

 6

 TERMINÉ 
The overall aim of Egoprise is to turn public administrations in rural BSR areas to more business oriented service suppliers, to relieve SMEs from administrative burdens, improve their access to information & qualified staff and as a consequence to increase attractiveness of rural areas as places to live, work & invest in. BACKGROUND:E-government potentials are not exploited so far: The developmen ...
Voir le projet

 22

 TERMINÉ 

Flexible working culture - Rethinking of work, place, time and life (FLEX)

Date du début: 31 déc. 2009, Date de fin: 29 avr. 2012,

The development of attractive island communities requires competitiveness and innovation. It also requires the development and recognition of island communities and the archipelago as a whole, in regional, economical, and political terms. Because of the geographic heterogeneity of the islands as well as the regional inequality within the archipelago, flexible work arrangements offer one possibil ...
Voir le projet

 7

 TERMINÉ 

CENTRAL BALTIC INNOVATION TOOLS FOR PRACTISE (INTO PRACTISE)

Date du début: 31 déc. 2008, Date de fin: 30 nov. 2011,

In a globally interdependent environment strategic cooperation is a key policy in developing relative competitive advantage of CB- region. The principles of the European social model (work for all, social equality&safe environment) can be maintained by investing in the high level of education, applications of science&technology and establishing strategic networks. Yet the existing capacity of inv ...
Voir le projet

 11

 TERMINÉ 

Lighthouse Tourism in the Archipelagos of South-West Finland and Estonia

Date du début: 31 mars 2007, Date de fin: 30 déc. 2007,

Lighthouses are interesting tourist resorts, but often difficult to reach. This project will create connections between the various actors administering, exploiting and developing the lighthouses, in order to make the lighthouses easier to reach. This process includes producing directions to the lighthouses. In addition, new products for lighthouse travelling will be produced in Finland and in Est ...
Voir le projet

 22

 TERMINÉ 
Initially it was thought that over 200,000,000 tons of Dangerous Goods (DG) per year moves in BSR (plus over 100M tons in NW Russia) mostly through densely populated areas, imposing real health and safety risks to people and environment. After the data gathering and reporting in DaGoB, the actual figure is close to 1,000,000,000 tons in the entire BSR region, which was substantially more than anti ...
Voir le projet

 28

 TERMINÉ 
The aim of the project was to establish a BSR-wide wind energy association with a secretariat and national contact points, co operation groups, permanently growing contacts, integration into BSR panels, to start and continue of wind energy internet-platform for information and as a tool for over-regional BSR-wide telematik co operation and for awareness raising, as well as to develop the wind ener ...
Voir le projet

 31

 TERMINÉ 

Wind energy in the BSR - Planning, Construction and Investment (WEBSR )

Date du début: 23 janv. 2003, Date de fin: 22 nov. 2004,

The aim of the project was to establish a BSR-wide wind energy association with a secretariat and national contact points, co operation groups, permanently growing contacts, integration into BSR panels, to start and continue of wind energy internet-platform for information and as a tool for over-regional BSR-wide telematik co operation and for awareness raising, as well as to develop the wind ener ...
Voir le projet

 31

 TERMINÉ 
The project consortium includes the following partners: three HEI`s from EU; nine Universities from AZ, IL and KZ; four stakeholders of related field from PCs; MHE from AZ and KZ; Ministry of Environmental protection from IL. Wider objective of the project is ensuring that the target Universities in AZ, IL and KZ can offer two cycle programmes in Space Based Remote Sensing Techniques to improve ...
Voir le projet

 20

 TERMINÉ 
Using audiovisual material in the foreign language classroom is a common resource for teachers since it introduces variety, provides exposure to non verbal cultural elements and, most importantly, presents linguistic and cultural aspects of communication in their context. However, teachers using this resource face the difficulty of finding active tasks that would engage learners and discourage pas ...
Voir le projet

 10

 TERMINÉ 

European Marketing and Innovation Centers

Date du début: 1 oct. 2011,

Marketing is one of the key areas in business. But one aspect of marketing that has been fundamentally neglected is its relation with innovation. And yet, marketing is one of the main instruments that trigger innovation. At the same time, innovation is required to change marketing – new approaches, new methods, new tools can give an edge to a product in a different society, based on digital tools, ...
Voir le projet

 9

 TERMINÉ 
Training out of the box : After analysis of the training needs of mechanical engineering and computer science, inter-disciplnary modules were developed and tested. These modules provide skills which cross over between two highly inter-linked subjects. This project started in 2002 and lasted 24 months.
Voir le projet

 10

 TERMINÉ 
Standard assessments in language teaching : The project will create a framework to guide language teachers in teaching and assessing their students. It should raise standards of teaching and the uniform assessment criteria will promote mobility amongst students and employees. This project started in 2002 and lasted 24 months.
Voir le projet

 11

 TERMINÉ 
http://www.fh-salzburg.ac.at The centrepiece of the proposed POOL project is a transnational student project in the field of telecommunications engineering carried out by students under industry conditions.
Voir le projet

 10