Rechercher des projets européens

15 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

PROMOTioN - Progress on Meshed HVDC Offshore Transmission Networks (PROMOTION)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance componen ...
Voir le projet

 35

 TERMINÉ 
Pentagon is a 3-years research and innovation project that will investigate the potential of wider deployment of energy conversion technologies and strategies at district-level, with the aim to foster flexibility in the low-voltage and medium-voltage grid. The rationale that underlies Pentagon approach is that multi-vector smart districts can be the key enablers of future smart grids, provided the ...
Voir le projet

 10

 TERMINÉ 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Voir le projet

 25

 TERMINÉ 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Voir le projet

 37

 TERMINÉ 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Date du début: 1 juil. 2013, Date de fin: 31 déc. 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Voir le projet

 29

 TERMINÉ 

Innovative Tools for Electrical System Security within Large Areas (iTESLA)

Date du début: 1 janv. 2012, Date de fin: 31 mars 2016,

6 Transmission System Operators (Belgium, France, Greece, Norway, Portugal and United Kingdom) and CORESO, a TSO coordination centre, together with 13 RTD performers propose a 4 year R&D project to develop and to validate an open interoperable toolbox which will bring support, by 2015, to future operations of the pan-European electricity transmission network, thus favouring increased coordination/ ...
Voir le projet

 23

 TERMINÉ 
The anticipated mass roll-out of electric vehicles (EVs) in Europe and the continuously increasing number of distributed energy resources (DER) are posing major challenges to Europe’s Distribution System Operators (DSOs) with regard to ensuring a secure and reliable energy supply and network operation. Despite ongoing research and demonstration activities in this field, particularly the developmen ...
Voir le projet

 12

 TERMINÉ 

TRAINING SCHEMES ON NUCLEAR SAFETY CULTURE (TRASNUSAFE)

Date du début: 1 nov. 2010, Date de fin: 31 oct. 2014,

Nuclear Safety Culture is a topic of paramount importance for all nuclear operators as well as for all operators of installations dedicated to radiology and radiotherapy. It concerns also the regulators and related support organisations. Its efficient practice is an absolute must for nuclear power plants, for production and transport of fissile materials and radioisotopes, and for related research ...
Voir le projet

 19

 TERMINÉ 
"In nuclear power plants, materials may undergo degradation due to severe irradiation conditions that may limit their operational life. Utilities that operate these reactors need to quantify the ageing and the potential degradations of some essential structures of the power plant to ensure safe and reliable plant operation. So far, the material databases needed to take account of these degradation ...
Voir le projet

 23

 TERMINÉ 

Severe Accident Research Network of Excellence 2 (SARNET2)

Date du début: 1 avr. 2009, Date de fin: 31 mars 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Voir le projet

 45

 TERMINÉ 

Demonstration of Large Scale Biomass Co-Firing and Supply Chain Integration (DEBCO)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2012,

The DEBCO project responds to the need for further operational experience in high share biomass co-firing using different type of fuels. The project aim to demonstrate and assess, on a long term basis, the advanced and innovative co-firing techniques that are capable of achieving higher shares of biomass up to 50% more on a thermal basis. These objectives will be achieved through a programme of r ...
Voir le projet

 18

 TERMINÉ 

Pan European Grid Advanced Simulation and state Estimation (PEGASE)

Date du début: 1 juil. 2008, Date de fin: 30 juin 2012,

"PEGASE is a four year project dealing with the High and Extra High Voltage transmission and sub-transmission networks in Europe (designated as ETN) and implemented by a Consortium composed of 20 Partners including TSOs, expert companies and leading research centre’s in power system analysis and applied mathematics. Its overall objectives are to define the most appropriate state estimation, optimi ...
Voir le projet

 25

 TERMINÉ 
"The interstate integration of power grids provides multiple advantages concerning operation security, integration of renewable energy as well as energy trading. Due to this fact the UCTE interconnection expands continually since its establishment. Consideration is given to different scenarios of joint operation of UCTE and NORDEL with power grids on the territory of the former USSR. Due to the fa ...
Voir le projet

 22

 TERMINÉ 
The objective of this coordination action is to develop best practice guidelines for the performance of Level-2 PSA methodologies with a view to harmonization at EU level and allowing a meaningful and practical uncertainty evaluation in a Level-2 PSA. Speficic relationships with community in charge of nuclear reactor safety (utilities, safety authorities, vendors, research or services companies) ...
Voir le projet

 23

 TERMINÉ 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Voir le projet

 27