Rechercher des projets européens

17 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Ecology from Farm to Fork Of microbial drug Resistance and Transmission (EFFORT)

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2018,

EFFORT studies the complex epidemiology and ecology of antimicrobial resistance and the interactions between bacterial communities, commensals and pathogens in animals, the food chain and the environment.This will be conducted by a combination of epidemiological and ecological studies using newly developed molecular and bio-informatics technologies. EFFORT will include an exposure assessment of hu ...
Voir le projet

 21

 TERMINÉ 
"We propose to carry out an FP7 collaborative project to provide the first ever quantitative answer to one fundamental age-old question of mankind: ‘How common are Earth analogs in our Galaxy?’. We will achieve our goal by combining the unprecedented photometric precision of NASA’s Kepler mission, the unrivalled precision of ground-based radial-velocities from the HARPS-N spectrograph, and ESA’s G ...
Voir le projet

 8

 TERMINÉ 

European Clinical Research Infrastructures Network - Integrating Activity (ECRIN-IA)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2017,

ECRIN is a distributed ESFRI-roadmap pan-European infrastructure designed to support multinational clinical research, making Europe a single area for clinical studies, taking advantage of its population size to access patients. Servicing multinational trials started during its preparatory phase, and it now applies for an ERIC status by 2011. The ERIC budget will be restricted to core activities re ...
Voir le projet

 48

 TERMINÉ 

FUTURE ATOMIC CLOCK TECHNOLOGY (FACT)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

During the last decades atomic clocks and frequency standards have become an important resource for advanced economies with impact ranging from satellite navigation (GPS, GLONASS, Galileo) to high speed communication networks, where they ensure synchronisation of data packets at ever higher bit rates. In this field the wake of the new millennium has been marked by the invention of frequency comb t ...
Voir le projet

 15

 TERMINÉ 
Being constantly inquired by its customers, TE-BE decided to find a non-volatile and low-cost solution for automatic and remote fiber-management. TE-BE partners with European experts to investigate and develop for the very first time the concept of a non-volatile Optical Switch Fabric. With the integration of two innovative technologies - silicon photonics and electrowetting (EWOD) - the consortiu ...
Voir le projet

 8

 TERMINÉ 
Though survival of children with acute lymphoblastic leukaemia (ALL) has improved, relapse remains a leading cause of mortality in childhood cancer. Given the rarity of the disease, only a large international cooperative group can recruit sufficient patients for prospective studies with specific questions in biologic subgroups. Under the umbrella of the I-BFM SG all relevant mainly European study ...
Voir le projet

 29

 TERMINÉ 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Voir le projet

 96

 TERMINÉ 
ManSYS aims to develop and demonstrate a set of e-supply chain tools; to enable the mass adoption of Additive Manufacturing (AM). This will allow businesses to identify and determine the suitability of AM for metal products, and subsequently manage the associated supply-chain issues and ‘facilitating’ open product evolution.The proposed e-supply chain solution will combine all aspects of AM includ ...
Voir le projet

 13

 TERMINÉ 
"TOX-TRAIN is a 4-year project and its main objective is the development and implementation of a tool box to assess toxicological impacts related to the life-cycle of technologies. The USEtox model, developed under UNEP-SETAC auspices with contributions of the partners in this consortium, will be taken as a starting point. First, TOX-TRAIN will develop and implement estimation tools for emissions ...
Voir le projet

 4

 TERMINÉ 
"It is increasingly evident that the era of mass production is being replaced by the era of market niches. The key to creating products that can meet the demands of a diversified customer base is a short development cycle yielding low cost, high quality goods in sufficient quantity to meet demand. This makes flexibility an increasingly important attribute to manufacturing.In response the reconfigu ...
Voir le projet

 12

 TERMINÉ 

Arctic Climate Change, Economy and Society (ACCESS)

Date du début: 1 mars 2011, Date de fin: 28 févr. 2015,

The Arctic is engaged in a deep climatic evolution. This evolution is quite predictable at short (year) and longer scales (several decades), but it is the decadal intermediate scale that is the most difficult to predict. This is because the natural variability of the system is large and dominant at this scale, and the system is highly non linear due to positive and negative feedback between sea ic ...
Voir le projet

 29

 TERMINÉ 

Game and Learning Alliance (GaLA)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2014,

The GaLA motivation stems from the acknowledgment of the potentiality of Serious Games (SGs) for education and training and the need to address the challenges of the main stakeholders of the SGs European landscape (users, researchers, developers/industry, educators). A foundational fault issue in this context is the fragmentation that affects the SG landscape.GALA aims to shape the scientific comm ...
Voir le projet

 34

 TERMINÉ 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Date du début: 1 sept. 2009, Date de fin: 31 août 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Voir le projet

 42

 TERMINÉ 

Pharmaceutical Medicine Training Programme (PHARMATRAIN)

Date du début: 1 mai 2009, Date de fin: 30 avr. 2014,

"The proposed Pharmaceutical Medicine Training Programme provides a comprehensive solution for the complex needs of integrated drug development for all professionals involved, incl. physicians, pharmaceutical scientists,biologists, biometricians, health economists, and safety and regulatory scientists from universities, regulatory agencies, large, middle-sized and small pharmaceutical enterprises, ...
Voir le projet

 52

 TERMINÉ 

Cooperative Mobility Systems and Services for Energy Efficiency (eCoMove)

Date du début: 1 avr. 2010, Date de fin: 31 janv. 2014,

The eCoMove project will create an integrated solution for road transport energy efficiency by developing systems and tools to help drivers sustainably eliminate unnecessary fuel consumption (and thus CO2 emissions), and to help road operators manage traffic in the most energy-efficient way. By applying this combination of cooperative systems using vehicle-infrastructure communication, the project ...
Voir le projet

 43

 TERMINÉ 
Inherited Neuromuscular Diseases (NMD) form a large group of diseases including Limb-Girdle Muscular Dystrophies (LGMD), Congenital Muscular Dystrophies (CMD), Duchenne and Becker Muscular Dystrophies (DMD/BMD), or Charcot-Marie-Tooth disease (CMT). Within a given disease group genetic and clinical heterogeneity is the hallmark. The precise diagnostic of neuromuscular diseases thus requires extens ...
Voir le projet

 13

 TERMINÉ 

Open Public Extended Network metering (OPEN meter)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2011,

New smart multi-metering or multi-functional Advanced Metering Infrastructure (AMI) is capable of creating value for energy consumers, network operators, metering operators and retailers. AMI will provide better services for customers in various ways: not only by more accurate metering and billing, but also by easing the supplier switching process and also by facilitating demand response to price ...
Voir le projet

 20