Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Federation for FIRE Plus (Fed4FIREplus)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2021,

The Fed4FIRE+ project has the objective to run and further improve Fed4FIRE’s “best-in-town” federation of experimentation facilities for the Future Internet Research and Experimentation initiative. Federating a heterogeneous set of facilities covering technologies ranging from wireless, wired, cloud services and open flow, and making them accessible through common frameworks and tools suddenly op ...
Voir le projet

 24

 TERMINÉ 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Voir le projet

 31

 TERMINÉ 
NEXTOWER shall introduce a set of innovative materials to boost the performance of atmospheric air-based concentrated solar power (CSP) systems to make them commercially viable. In particular, tower systems are appealing for the great environmental compatibility and offer tremendous potential for efficient (electrical and thermal) power generation. Yet, their industrial exploitation has been so fa ...
Voir le projet

 18

 TERMINÉ 

Big Data Value ecosystem (BDVe)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The mission of BDVe is to support the Big Data Value PPP in realizing a vibrant data-driven EU economy or said in other words, BDVe will support the implementation of the PPP to be a SUCCESS.Behind that mission, there are multiple goals to achieve, which should be taken into full consideration when defining the directions of the PPP. Some of the most challenging ones are: (1) achieving a more comp ...
Voir le projet

 11

 TERMINÉ 
HarmonicSS vision is to create an International Network and Alliance of partners and cohorts, entrusted with the mission of addressing the unmet needs in primary Sjogren Syndrome; working together to create and maintain a platform with open standards and tools, designed to enable secure storage, governance, analytics, access control and controlled sharing of information at multiple levels along wi ...
Voir le projet

 39

 TERMINÉ 

Simulation in Real Time for Manufacturing with Zero Defects (STREAM-0D)

Date du début: 1 oct. 2016, Date de fin: 31 mars 2020,

Facts: i) Zero-defect manufacturing and flexibility of production processes are some of the main challenges for European manufacturing; ii) One of the engineering tools with higher potential is the linking of simulation tools with measurement devices for real-time control of applications. The huge potential of this synergistic loop remains untapped for manufacturing processes and could be used f ...
Voir le projet

 10

 TERMINÉ 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Voir le projet

 14

 TERMINÉ 

Advanced Low Flying Aircrafts Detection and Tracking (ALFA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

... decades witnessed the ever growing effectiveness of Europe-subsidized border protection projects like SIVE and SIVICC. As maritime smuggling from Morocco towards the European borders of Portugal and Spain was combatted more effectively, the criminal modus operandi changed drastically, approaching air routes with cheap and small planes. New drone technology opens opportunity to both manned and unm ...
Voir le projet

 9

 TERMINÉ 
The lack of interoperability is considered as the most important barrier to achieve the global integration of IoT ecosystems across borders of different disciplines, vendors and standards. Indeed, the current IoT landscape consists of a large set of isolated islands that do not constitute a real internet, preventing the exploitation of the huge potential expected by ICT visionaries.To overcome thi ...
Voir le projet

 15

 TERMINÉ 
The demand for larger and more interconnected software systems is constantly increasing, but the ability of developers to satisfy it is not evolving accordingly. The most limiting factor is software validation, which typically requires very costly and complex testing processes. This project aims at significantly improving the efficiency and effectiveness of the testing process and, with it, the ov ...
Voir le projet

 11

 TERMINÉ 
Fog computing brings cloud computing capabilities closer to the end-device and users, while enabling location-dependent resource allocation, low latency services, and extending significantly the IoT services portfolio as well as market and business opportunities in the cloud sector. With the number of devices exponentially growing globally, new cloud and fog models are expected to emerge, paving ...
Voir le projet

 10

 TERMINÉ 

Facility for Large-scale Adaptive Media Experimentation (FLAME)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The Future Media Internet (FMI) will be driven by evolving existing over-the-top (OTT) solutions towards a stronger integration with emerging programmable communication and computing infrastructures to address consumer demand for personalised, interactive, mobile and localised media experiences. Creating a trusted platform that brings together technology, creative sectors and consumers in the deve ...
Voir le projet

 11

 TERMINÉ 
CREATE-IoT’s aim is to stimulate collaboration between IoT initiatives, foster the take up of IoT in Europe and support the development and growth of IoT ecosystems based on open technologies and platforms. This requires synchronisation and alignment on strategic and operational terms through frequent, multi-directional exchanges between the various activities under the IoT Focus Areas (FAs). It a ...
Voir le projet

 20

 TERMINÉ 
There is an increasing need to develop data intensive applications able to manage more and more amounts of data coming from distributed and heterogeneous sources effectively, quickly, correctly, and securely. However, the current adoption of Cloud Computing paradigm is not fully appropriate to store and analyse such data: latency, security, and compliance are still significant barriers. At the sa ...
Voir le projet

 9

 TERMINÉ 

Data-Driven Bioeconomy (DataBio)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The data intensive target sector selected for the DataBio project is the Data-Driven Bioeconomy, focusing in production of best possible raw materials from agriculture, forestry and fishery/aquaculture for the bioeconomy industry to produce food, energy and biomaterials taking into account also various responsibility and sustainability issues. DataBio proposes to deploy a state of the art, big dat ...
Voir le projet

 49

 TERMINÉ 

QROWD - Because Big Data Integration is Humanly Possible (QROWD)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2019,

Big Data integration in European cities is of utmost importance for municipalities and companies to offer effective information services, enable efficient data-driven transportation and mobility, reduce CO2 emissions, assess the efficiency of infrastructure, as well as enhance the quality of life of citizens. At present this integration is substantially limited due to the following factors: 1) Urb ...
Voir le projet

 8

 TERMINÉ 

Software Testing AMPlification (STAMP)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2019,

Release early, release often. Such is the mantra of IT giants like Twitter or Netflix. Pioneers in the engineering of applications that run in the cloud now routinely perform hundreds of code updates per day in what has become a thrust of continuous delivery around the clock. This stunning agility is a decisive competitive edge. It cuts time-to-market and hikes revenue. Behind the feat lies DevOps ...
Voir le projet

 10

 TERMINÉ 

Storage capacity sharing over virtual neighbourhoods of energy ecosystems (SHAR-Q)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

Storages are unavoidable components of the future smart grid with large share of variable renewable generation. However, the unit-cost of energy, that is retrieved from storages, is several times higher than the cost of energy consumed upon its output from RES. Therefore, there is a strong requirement on the optimisation of storage capacities deployed in the grid. This is especially true for the s ...
Voir le projet

 11

 TERMINÉ 

Nanoscale Systems for Optical Quantum Technologies (NanOQTech)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

Optical quantum technologies use light as a carrier of quantum information or to probe and control other quantum systems. They offer transformational advances in ultra-secure communication, sensing that surpasses classical limits, simulation of quantum systems and computation. To meet the high demands of these applications, systems with multiple quantum degrees of freedom that can be addressed by ...
Voir le projet

 7

 TERMINÉ 

HUman MANufacturing (HUMAN)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

EU manufacturers are increasingly adopting automation solutions that can improve productivity and reduce costs.Enterprises’ ability to utilize these technologies may be their single most important competitive advantage, and the specific skills, experiences, competences,and flexibility of workers are pivotal to and at the core of this ability.To create a healthy workplace and increase the competiti ...
Voir le projet

 12

 TERMINÉ 
SynchroniCity represents the first attempt to deliver a Single Digital City Market for Europe by piloting its foundations at scale in 11 reference zones - 8 European cities & 3 more worldwide cities - connecting 34 partners from 11 countries over 4 continents. Building upon a mature European knowledge base derived from initiatives such as OASC, FIWARE, FIRE, EIP-SCC, and including partners with le ...
Voir le projet

 35

 TERMINÉ 

A Tale of Two Futures

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

...n the long term. We therefore want to adapt Carbon Conversations that uses social, economic and cultural references to carbon emissions in Britain to the social, economic, and cultural backgrounds of Spain and Lithuania. Volunteer facilitators run the programme in Britain for participants and in this project the three partners will collaborate to develop the volunteer networks in Spain and Lithuan ...
Voir le projet

 3

 TERMINÉ 

Towards a Shared European Logistics Intelligent Information Space (SELIS)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

SELIS is aimed at delivering a ‘platform for pan-European logistics applications’ by:- Embracing a wide spectrum of logistics perspectives and creating a unifying operational and strategic business innovation agenda for pan European Green Logistics.- Establishing an exceptionally strong consortium of logistics stakeholders and ICT providers, that can leverage EU IP from over 40 projects so as to c ...
Voir le projet

 38

 TERMINÉ 
An efficient asset management process is needed to ensure cost-effectiveness, in planning, delivery, operation and maintenance of large infrastructures or infrastructures network. Infrastructure asset management generally focuses on the later stages of a facility’s life cycle, specifically maintenance, rehabilitation, and replacement. However, a process of efficient asset management must define me ...
Voir le projet

 14

 TERMINÉ 

Diversity Enhancements for SIEMs (DiSIEM)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Security Information and Event Management (SIEM) systems are a fundamental component of the ubiquitous ICT infrastructures that form the backbone of our digital society. These systems are mostly used to monitor infrastructures using many types of sensors and tools and correlate the obtained events to discover possible threats (attacks, vulnerabilities, etc.) to the organization. The DiSIEM project ...
Voir le projet

 8

 TERMINÉ 

Architecture for EurOpean Logistics Information eXchange (AEOLIX)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Supply chain visibility supported by easy access to, and exchange and use of relevant and abundant logistics-related information is an important prerequisite for the deployment of pan-European logistics solutions that are needed to increase efficiency and productivity, and to reduce environmental impact. Although there is a proliferative development of logistics-related data stores, information ch ...
Voir le projet

 34

 TERMINÉ 
The objective of LIGHTest is to create a global cross-domain trust infrastructure that renders it transparent and easy for verifiers to evaluate electronic transactions. By querying different trust authorities world-wide and combining trust aspects related to identity, business, reputation etc. it will become possible to conduct domain-specific trust decisions. This is achieved by reusing existing ...
Voir le projet

 14

 TERMINÉ 
The seven specific objectives of TOXI-triage address the operational; technological; ethical and societal dimensions of CBRN response and recovery, and importantly the economic base from which sustainable CBRN and multi-use systems are derived.19 partners in 4 Task forces will deliver 9 Work Packages (WPs) that address: end user specifications; Design and delivery; Test and Validation; and, Impact ...
Voir le projet

 19

 TERMINÉ 
Data and services have become the key factor in manufacturing processes. The need to react on dynamically changing market demands is dramatically rising. One of the most imperative problems so far is to connect supply chain data and services between enterprises and to connect value chain data within a factory, so that it can meaningfully support decision-making. COMPOSITION will create a digital a ...
Voir le projet

 12

 TERMINÉ 

European Network for Cyber-security (NeCS)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

The European Network for Cybersecurity (NECS) was formed in response to the increased need of highly qualified experts able to cope with all the aspects of the European cybersecurity strategy that is currently under implementation.There is indeed an evident need and opportunity to grow a new generation of young researchers able to answer this demand for expertize, trained to the changing nature o ...
Voir le projet

 8

 TERMINÉ 

Transforming Transport (TT)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Voir le projet

 48

 TERMINÉ 

Advancing Smart Optical Imaging and Sensing for Health (ASTONISH)

Date du début: 1 juin 2016, Date de fin: 31 mai 2019,

The ageing population and related increase in chronic diseases put considerable pressure on both the healthcare system and the society, resulting in an unsustainable rise of healthcare costs. As a result there is an urgent need to improve efficiency of care and reduce hospitalisation time in order to control cost and increase quality of life. Addressing this need, medical applications need to beco ...
Voir le projet

 25

 TERMINÉ 
In recent years, the majority of the world's Critical Infrastructures CIs evolved to become more flexible, cost efficient and able to offer better services and conditions for business opportunities. Towards this evolution, CIs and companies offering CI services had to adopt many of the recent advances of the Information and Communication Technologies (ICT) field. This adaptation however, was rathe ...
Voir le projet

 14

 TERMINÉ 

NEW Business models for ITS (NEWBITS)

Date du début: 1 oct. 2016, Date de fin: 31 mars 2019,

The overall objective of the NEWBITS project is to provide with a deep understanding of the changing conditions and dynamics that affect and/or influence C-ITS innovations. New KPIs will be designed to feed reactive and network oriented value creation propositions that improve the collaborative decision-making process across the various stakeholders. This improved value definition must minimize th ...
Voir le projet

 9

 TERMINÉ 
Science2Society creates, pilots and shares good practices, guidelines and training materials that improve awareness and practical performance in seven concrete university-industry-society interfacing schemes especially affected by Science 2.0 and open innovation. It covers a very wide range of interfacing / co-creation approaches (and the synergy between them) and advances far beyond the tradition ...
Voir le projet

 19

 TERMINÉ 

reliAble euRopean Identity EcoSystem (ARIES)

Date du début: 1 sept. 2016, Date de fin: 28 févr. 2019,

ARIES main goal is to deliver a comprehensive framework for reliable e-identity ecosystem comprising new technologies, processes and security features that ensure highest levels of quality in eID based on trustworthy security documents and biometrics for highly secure and privacy-respecting physical and virtual identity management, with the specific aim to tangibly achieve a reduction in levels of ...
Voir le projet

 9

 TERMINÉ 
NEWTON is a large scale initiative to develop, integrate and disseminate innovative technology-enhanced learning (TEL) methods and tools, to create new or inter-connect existing state-of-the art teaching labs and to build a pan-European learning network platform that supports fast dissemination of learning content to a wide audience in a ubiquitous manner. NEWTON focuses on employing novel technol ...
Voir le projet

 14

 TERMINÉ 

Adult Education as a Means for Active Participatory Citizenship (EduMAP)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2019,

The existing research and policy reports show that adult education policies and practices are designed and carried out in ways and using means which are not always appropriate to vulnerable minority groups. In the EduMAP Project the diversity of societal participation and the wide range of cultural contexts and communicative practices among learners will be acknowledged. In particular, the educati ...
Voir le projet

 10

 TERMINÉ 
...nce aims to develop entrepreneurship and innovation skills and opportunities among Forest and Environmental Policy and Economics (FEPE) university departments in Europe, specifically targeting Italy, Spain, England and Romania. The project focuses on promoting and fostering the links among high education institutions and businesses operating in the field of Marketing and Economics of Ecosystems an ...
Voir le projet

 9

 TERMINÉ 

RLEF Training and Education Portal

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Rugby league in Europe continues to grow rapidly. The RLEF is dealing with the fundamental need to ensure its growing network of members is equipped with knowledgeable, competent and qualified staff able to disseminate the sport’s on- and off-field values and techniques at a high level of quality, and ensuring it is administered by robust, democratic and transparent NFs.By far the largest constitu ...
Voir le projet

 22