Rechercher des projets européens

18 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

DEvelopment platform for Safe and Efficient dRiVE (DESERVE)

Date du début: 1 sept. 2012, Date de fin: 29 févr. 2016,

According to a recent forecast published by ABI Research , a fast growth of the market of Advanced Driving Assistance Systems (ADAS) is foreseen in the next five years. For example, in 2016 the overall annual market for Lane Departure Warning systems is expected to reach 22 million units/year (corresponding to 14,3 billion dollars). This market growth will be possible only through the reduction of ...
Voir le projet

 28

 TERMINÉ 
"NOTOX will develop and establish a spectrum of systems biological tools including experimental and computational methods for i) organotypic human cell cultures suitable for long term toxicity testing and ii) the identification and analysis of pathways of toxicological relevance. NOTOX will initially use available human HepaRG and primary liver cells as well as mouse small intestine cultures in 3D ...
Voir le projet

 13

 TERMINÉ 
The Network of Excellence on Engineering Secure Future Internet Software Services and Systems (NESSoS) aims at constituting and integrating a long lasting research community on engineering secure software-based services and systems.The NESSoS engineering of secure software services is based on the principle of addressing security concerns from the very beginning in system analysis and design, thus ...
Voir le projet

 12

 TERMINÉ 

IPv6 ITS Station Stack for Cooperative Systems FOTs (ITSSv6)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2014,

ITSSv6 aims at developing a reference open-source IPv6 ITS Station stack available to European and national third parties (projects, industry and academia) using IPv6 for Internet-based communications in Field Operational Tests (FOTs) of Cooperative Systems. The IPv6 networking capabilities of the ITS Station under standardization at ISO TC204 WG16 (CALM) and ETSI TC ITS are extended with addition ...
Voir le projet

 9

 TERMINÉ 
"Air traffic in Europe is expected to double by 2025 according to the last forecast of Eurocontrol. Future passenger and freight fleets will bring better efficiency and improved environmental performance, and will allow people to benefit from the connections that only air transport can deliver. In this context, an integrated aircraft communication system is of paramount importance to improve effic ...
Voir le projet

 34

 TERMINÉ 

Large Scale Choreographies for the Future Internet (CHOReOS)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

The CHOReOS project positions itself in the context of the Ultra-Large-Scale (ULS) Future Internet of software services. To address the challenges inherent of ULS as well as other key requirements of the Future Internet, such as fusion of the user/developer/system roles, adaptability and QoS-awareness, to name a few, CHOReOS revisits the concept of choreography-based service composition in service ...
Voir le projet

 17

 TERMINÉ 

Trustworthy Eternal Systems via Evolving Software, Data and Knowledge (EternalS)

Date du début: 1 mars 2010, Date de fin: 28 févr. 2013,

Latest research work within ICT has allowed to pinpoint the most important and urgently required features that future systems should have to meet users' needs. Accordingly, methods making systems capable of adapting to changes in user requirements and application domains are key research areas.Adaptation and evolution depend on several dimensions like time, location, and security conditions, expre ...
Voir le projet

 6

 TERMINÉ 

European Network of Excellence in Cryptology - Phase II (ECRYPT II)

Date du début: 1 août 2008, Date de fin: 31 janv. 2013,

ECRYPT II is a NoE in the area of cryptology with a duration of 54 months. Cryptology is the science that studies mathematical techniques in order to provide secrecy, authenticity and related properties for digital information including the secure implementations of these techniques. It is an interdisciplinary research area with a high strategic impact for European industry and for the society as ...
Voir le projet

 13

 TERMINÉ 

Coordinated approacH to the EurOpean effoRt on aUdio-visual Search engines (CHORUS +)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

CHORUS+ creates the conditions for mutual information exchange and cross fertilization between the FP7 projects in the Search Engine domain and the national and international initiatives running in this area. The CHORUS+ project aims to foster timely discussion and avoid fragmentation. Discussion groups with selected experts and representatives from industry, academia, and research organizations ...
Voir le projet

 10

 TERMINÉ 

GLOCAL: Event-based Retrieval of Networked Media (GLOCAL)

Date du début: 1 déc. 2009, Date de fin: 31 déc. 2012,

We describe the world by using words. Yet, words usually bring to mind different mental views of the world in different individuals, because of their personal experience and context. This is the reason why the "semantic gap" between our conceptualizations of the world, expressed using language, and our experience of the world, whose most direct representations are media, is far beyond the reach of ...
Voir le projet

 10

 TERMINÉ 

A unIfied framework for multimodal content SEARCH (I-SEARCH)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

I-SEARCH aims to create a novel unified framework for multimedia and multimodal content indexing, sharing, search and retrieval. I-SEARCH will be the first search engine able to handle specific types of multimedia (text, 2D image, sketch, video, 3D objects, audio and combination of the above) and multimodal content (gestures, face expressions, eye movements) along with real world information (GPS, ...
Voir le projet

 12

 TERMINÉ 

Personal Intelligent City Accessible Vehicle System (PICAV)

Date du début: 1 août 2009, Date de fin: 30 sept. 2012,

"The proposal presents a new mobility concept for passengers ensuring accessibility for all in urban pedestrian environments. The concept addresses a new Personal Intelligent City Accessible Vehicle (PICAV) and a new transport system that integrates a fleet of PICAV units. The transport system will ensure accessibility for everybody and some of its features are specifically designed for people who ...
Voir le projet

 7

 TERMINÉ 

Integrating and Developing European Asian Studies (IDEAS)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

"Many EU and non-EU governments have concluded that the Humanities and Social Sciences could and should make a greater contribution to public policy making. For instance, the Pentagon has recently admitted that top US decision-makers were not sufficiently informed about the cultural background of Iraq when they planned the 2003 US-led invasion. Cultural perspective is essential in foreign policy-m ...
Voir le projet

 8

 TERMINÉ 

Pan European Grid Advanced Simulation and state Estimation (PEGASE)

Date du début: 1 juil. 2008, Date de fin: 30 juin 2012,

"PEGASE is a four year project dealing with the High and Extra High Voltage transmission and sub-transmission networks in Europe (designated as ETN) and implemented by a Consortium composed of 20 Partners including TSOs, expert companies and leading research centre’s in power system analysis and applied mathematics. Its overall objectives are to define the most appropriate state estimation, optimi ...
Voir le projet

 25

 TERMINÉ 
"The goal of the CANCERSYS project is to establish a multi-scale model for two major signalling pathways involved in the formation of hepatocellular carcinoma, the beta-catenin and ras signalling pathways. Integrative studies linking measurements in primary heptocytes with effects at the organ level will address the impact of these signalling networks on proliferation, tissue organization and form ...
Voir le projet

 10

 TERMINÉ 

Highly Automated Vehicles for Intelligent Transport (HAVE-it)

Date du début: 1 févr. 2008, Date de fin: 31 juil. 2011,

Description The groundbreaking HAVEit proposal aims at the long-term vision of highly automated driving. Within this proposal important intermediate steps will be developed, validated and demonstrated. These intermediate results on the one hand offer high potential for exploitation within 3-5 years after HAVEit and on the other hand form the ...
Voir le projet

 29

 TERMINÉ 

Cooperative Intersection Safety (INTERSAFE-2)

Date du début: 1 juin 2008, Date de fin: 31 mai 2011,

Today, most so called 'black spots' have been eliminated from the road networks. However, intersections can still be regarded as black spots. Depending on the region and country, from 30 to 60% of all injury accidents and up to one third of the fatalities are intersection related. This is due mainly to the fact that accident scenarios at intersections are among the most complex ones, since differe ...
Voir le projet

 13

 TERMINÉ 

Optimization driven Multi-hop Network Design and Experimentation (OPNEX)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2011,

OPNEX delivers a first principles approach to the design of architectures and protocols for multi-hop wireless networks. Systems and optimization theory is used as the foundation for algorithms that provably achieve full transport capacity of wireless systems. Subsequently a plan for converting the algorithms termed in abstract network models to protocols and architectures in practical wireless sy ...
Voir le projet

 5