Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

REnaissance of Places with Innovative Citizenship and TEchnolgy (REPLICATE)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2021,

...sful implementation of Smart City technologies two main elements are considered:- Cities are the customer: considering local specificities in integrated urban plans and the need to develop monitoring systems to extract conclusions for replication.- Solutions must be replicable, interoperable and scalable.REPLICATE considers also the complexity of cities, the tangible benefits for citizens, the fin ...
Voir le projet

 37

 TERMINÉ 
Around 461 million ton/year of C&DW are generated in EU28. Recent studies on the characterization of C&DW samples at European level revealed a predominant fraction of concrete (52% average). Over the last years, novel technology has been developed aiming to guarantee high quality recycled concrete aggregates for use in new concrete, thereby closing the concrete loop. The most advanced concrete re ...
Voir le projet

 15

 TERMINÉ 

Consortium for Hall Effect Orbital Propulsion System (CHEOPS)

Date du début: 1 nov. 2016, Date de fin: 30 avr. 2020,

CHEOPS proposes to develop three different Hall Effect Thruster electric propulsion systems: a dual mode EPS for GEO applications, a low power for LEO applications and a >20 kW high thrust EPS for exploration applications. Each of these will be developed according to market needs and drivers applying incremental technology changes to existing EPS products. The development approach will follow the ...
Voir le projet

 14

 TERMINÉ 
... monitoring and management of surface water quality that is fit for global waters in the period 2020-2050. INTCATCH will do this by developing efficient, user-friendly water monitoring strategies and systems based on innovative technologies that will provide real time data for important parameters, moving towards SMART Rivers. The business model will transform water governance by facilitating sus ...
Voir le projet

 23

 TERMINÉ 
Pervasive and on-line water quality monitoring data is critical for detecting environmental pollution. However, it’s not easy to gather such data, at least not for all contaminants. Currently, water utilities rely heavily on frequent sampling and laboratory analysis in order to acquire this information.For this situation to be improved, portable and high-performance devices for pervasive water qua ...
Voir le projet

 9

 TERMINÉ 
Specific raw materials become increasingly important to manufacture high level industrial products. Especially electronic equipment contains precious metals and a series of strategic raw materials. To date the material specific recycling is focused on mass stream concepts such as shredder processes and metallurgy to extract the high-value metallic constituents, i.e. copper, gold, silver. However, ...
Voir le projet

 10

 TERMINÉ 

High-Speed Experimental Fly Vehicles - International (HEXAFLY-INT)

Date du début: 1 avr. 2014, Date de fin: 31 mars 2019,

...:– updated of the mission profile based upon the feasibility study– a detailed design of a high-speed experimental flight vehicle– selection and manufacturing of ground-tested technologies and systems– assembly, integration and testing of the experimental flight test vehicle– identification and procurement of the most promising flight platform(s)The design of the experimental high-speed cruise ve ...
Voir le projet

 11

 TERMINÉ 
...The disruption of terrorist financing activity is a key element in any fight against terrorism.DANTE will deliver effective, efficient and automated data mining, analytics solutions and an integrated system to detect, retrieve, and analyse huge amounts of heterogeneous and complex multimedia and multi-language (in five languages) terrorist-related contents from both the Surface and the Deep Web, i ...
Voir le projet

 18

 TERMINÉ 
...energy and CO2 footprint are needed.As stated in the European Directive on Energy Performance of Buildings (COM 2010/31/EU), the development of better performing insulation materials and lightweight systems for building envelopes is crucial, playing a significant role in the reduction of buildings operational energy while complying with the load bearing features of existing building structures.The ...
Voir le projet

 14

 TERMINÉ 

European Virtual Environment for Research - Earth Science Themes (EVER-EST)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2018,

The EVER-EST project will enhance Research and Capacity Building in the Earth Science (ES) domain, by providing a generic Service Oriented-based Architecture Virtual Research Environment (VRE) tailored to the needs of the ES community. The full range of both generic and ES data management specific services provided by EVER-EST will facilitate the dynamic approach to collaborative working and rese ...
Voir le projet

 13

 TERMINÉ 

EUropean CERamic MATerials

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

The aim the European Ceramic Materials (EUCERMAT) project is to significantly contribute to changing the general opinion about ceramics materials in Europe. As a matter of fact, ceramic materials are too often simply associated to great diffusion materials mainly employed as building materials (covering plates factories, glasses for windows... etc.). This narrow and negative image is the main reas ...
Voir le projet

 13

 TERMINÉ 

EUBET

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

Bromangymnasiet in Hudiksvall is situated in a region of very high unemployment, among the young it is the highest percentage in the country (25 %). Our school has the task and mission to develop an intercultural teaching practice supported by inclusive, innovative methods and entrepreneurship to achieve a more entrepreneurial learning for the benefits of our students. For some years now, we have ...
Voir le projet

 62

 TERMINÉ 

STEam And Management Under Pressure (STEAM-UP)

Date du début: 1 mars 2015, Date de fin: 28 févr. 2018,

The industrial sector could reduce its energy use by at least 13%. 75% of the potential savings can be found in steam and electric motor systems. Actions to tap the full potential in steam systems have been taken in the past but without success since findings from energy audits were not, or partly, implemented. The following barriers have been identified:- There is no business case for steam savin ...
Voir le projet

 10

 TERMINÉ 

Optimodal European Travel Ecosystem (EuTravel)

Date du début: 1 mai 2015, Date de fin: 31 oct. 2017,

... and environmental performance (Optimodal Travel). The project objectives will be realised by:1. Developing an open and readily usable Optimodality Framework aimed at integrating processes, data, and systems in a manner that eliminates interoperability barriers to the marketplace emergence of truly Optimodal travel services: from planning through booking and the full range of related travel suppor ...
Voir le projet

 17

 TERMINÉ 
...ial buildings, as their energy consumption is 40% higher than in residential buildings, being the public buildings more than 30% of the non-residential buildings in EU. A2PBEER will develop a systemic energy efficient buildings’ retrofitting methodology for Public buildings and will take advantage of synergies derived from interventions at district level. A2PBEER methodology will include already a ...
Voir le projet

 22

 TERMINÉ 
During more than 50 years of the laser existence, they have been proved as the unique tool for diverse material processing application. New application ideas, coming from universities and research institutions, are usually implemented by spin-off companies with limited resources for market penetration. Research laboratories are using universal laser tools, while effective and low-cost production r ...
Voir le projet

 36

 TERMINÉ 
...s, alleviate poverty and develop the local recycling sector.EWIT project’s aim is to address these challenges, assisting African municipalities in the implementation of effective e-waste management systems for their communities.The project will develop a comprehensive mapping of the baseline data of African metropolitan areas related to e-waste management, analyzing the most relevant experiences, ...
Voir le projet

 24

 TERMINÉ 
...ransportation services. Travellers will get mobile applications that facilitate them in making travel priorities and choices for route and modality. The work will result in a city-wide transportation system comprised of several sub-systems that involve transportation services and policies to be adaptive to the travel demand of the citizens. To achieve this, the platform will fuse different data fr ...
Voir le projet

 9

 TERMINÉ 

Dynamic Risk Approaches for Automated Cyber Defence (PANOPTESEC)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The PANOPTESEC consortium will deliver a beyond-state-of-the-art prototype of a cyber defence decision support system, demonstrating a risk based approach to automated cyber defence that accounts for the dynamic nature of information and communications technologies (ICT) and the constantly evolving capabilities of cyber attackers. "Panoptes" is an ancient Greek term meaning 'all eyes' or 'all see ...
Voir le projet

 10

 TERMINÉ 
In the fluid environment of the junction between FP7 and HORIZON 2020, the EAST HORIZON Support Action, brought forward by a balanced mixture of European Strategic Consulting companies, IT Industry, EECA National Research and Governmental Organizations, comes as a bridge for a two-way cooperation between the EECA and the EU.It will inspire ideas, influence policies, and launch actions to:Support t ...
Voir le projet

 14

 TERMINÉ 

Knowledge Driven Data Exploitation (K-DRIVE)

Date du début: 1 janv. 2012, Date de fin: 30 juin 2016,

The development of innovative technology for the discovery new insights (such as trends) of digital data and real time guidance of using digital data is one of the priorities in the areas of semantic technologies. The first objective of this project is the identification of novel query generation techniques to facilitate experts to identify key dimensions within semantic data and to recommend use ...
Voir le projet

 6

 TERMINÉ 

Innovative Tools for Electrical System Security within Large Areas (iTESLA)

Date du début: 1 janv. 2012, Date de fin: 31 mars 2016,

6 Transmission System Operators (Belgium, France, Greece, Norway, Portugal and United Kingdom) and CORESO, a TSO coordination centre, together with 13 RTD performers propose a 4 year R&D project to develop and to validate an open interoperable toolbox which will bring support, by 2015, to future operations of the pan-European electricity transmission network, thus favouring increased coordination/ ...
Voir le projet

 23

 TERMINÉ 

Modular Development Plan of the Pan-European Transmission System 2050 (e-HIGHWAY2050)

Date du début: 1 sept. 2012, Date de fin: 31 déc. 2015,

Eight Transmission System Operators (BE, CZ, FR, DE, IT, PT, CH, PL) and ENTSO-E, together with 4 associations of technology manufacturers, and 16 RTD performers propose a 3-year R&D project to develop and to apply a methodology for the long-term development of the Pan-European transmission network. The project aims at delivering a top-down methodology to support the planning from 2020 to 2050. F ...
Voir le projet

 28

 TERMINÉ 
Micro- and nanometer structuring has proven to be an efficient method to functionalize surfaces, and is attractive to manufacturers of plastic products. Plastic components are volume manufactured by injection moulding. Compact Discs and Digital Video Discs are today manufactured with nanometer range lateral resolution but, only on planar surfaces. Free-form (double-curved) moulding tools today off ...
Voir le projet

 14

 TERMINÉ 
The aims of the NanoMaster project are to reduce the amount of plastic used to make a component by 50% and hence reduce component weight by 50%, at the same time as imparting electrical and thermal functionality. This will be achieved by developing the next generation of graphene-reinforced nano-intermediate that can be used in existing high-throughput plastic component production processes.Graphe ...
Voir le projet

 14

 TERMINÉ 

Hyperspectral imaging IED and explosives reconnaissance system (HYPERION)

Date du début: 1 août 2012, Date de fin: 31 oct. 2015,

The objective with the HYPERION project is to develop and test a system concept for the on-site forensic analysis of an explosion. The forensic tools and procedures used will in majority be at safe stand-off detection distances. This will also include tools for identification of unexploded IEDs. The on-site data provided by the HYPERION system will be the type and amount of explosive used in the a ...
Voir le projet

 13

 TERMINÉ 

Injected Moulded barriers for cost effective food packaging (CLAYMBAR)

Date du début: 1 mai 2015, Date de fin: 31 oct. 2015,

...r competitivity and accelerate their growth -, we will broaden our product portfolio of thermoformed and injected moulded rigid plastics (+49% of turnover after 5 years). Our partner, Color System S.P.A., is one of the leading companies in the production of masterbatches. Our partnership with CS has been develop through several industrial projects as a masterbatches provider and they will consoli ...
Voir le projet

 2

 TERMINÉ 
"AFTER project addresses the challenges posed by the need for vulnerability evaluation and contin-gency planning of the energy grids and energy plants considering also the relevant ICT systems used in protection and control.Project emphasis is on cascading events that can cause catastrophic outages of the electric power systems.The main addressed problems are related to high impact wide spread mul ...
Voir le projet

 14

 TERMINÉ 
...will pass through the critical 2012-2014 period (preparation of FP8, initial operation of ACER, increased specification duties of the network operators) when dealing with the most complex electricity system in the world and to address the five remaining critical issues (costs, benefits, KPIs, knowledge sharing and financing) in involving all the stakeholders, to ensure the rational, fluid and stab ...
Voir le projet

 13

 TERMINÉ 

Transborder integrated platform (TIP)

Date du début: 31 oct. 2011, Date de fin: 29 avr. 2014,

Interventions and activities to promote the coordination of operation of terminals and intermodal hubs in Gorizia and Vrtojba the motorway axis "Villesse-Gorizia-Razdrto". Expected Results: Reduce the consumption oelecricity b ...
Voir le projet

 10

 TERMINÉ 
"The strategic importance of space systems is growing in Europe, for civil and defence applications (satellite communications, ..). Recent examples have shown that on-orbit collisions brought on by space debris are important threats. On one hand, some space debris are routinely tracked, making the collisions predictable, but they increase the cost of space missions’ management. On the other hand, ...
Voir le projet

 7

 TERMINÉ 
Description Digital heritage and semantic web technologies hold out the promise of nearly unlimited access to cultural knowledge. The problem is that cultural meaning does not reside in individual objects but in the patterns of knowledge and events, belief and thought that link them to each other and to the observer. This is why story is so ...
Voir le projet

 8

 TERMINÉ 

MAnaging System Change in Aviation (MASCA)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2013,

"In response to the FP 7 Transport Call 3, AREA 7.1.4.3. (Air Transport system operational cost), Topic AAT.2010.4.3-4. (Human factors), MASCA proposes to deliver a structure to manage the acquisition and retention of skills and knowledge, through training on organisational processes for managing organisational change in the ‘whole air transport system’. Different stakeholders in a common operatio ...
Voir le projet

 9

 TERMINÉ 
A group of 6 Transmission System Operators (Belgium, Denmark, France, Germany The Netherlands and Spain) with 2 generator companies, 5 manufacturers and research organisations, propose 6 demonstration projects to remove, in 3 years, several barriers which prevent the electric system from welcoming more wind electricity, and wind electricity from contributing more to the electric system. The full s ...
Voir le projet

 29

 TERMINÉ 
...ADIUM addresses the task 3.1.7 - Large event mobility management (especially in big cities) of the call FP7 – SST – 2008The ultimate goal of the project is to improve the performance of transport systems made available to a wide and differentiated range of users in the framework of large events hosted by big cities, through the development of a set of guidelines and tools to implement management s ...
Voir le projet

 19

 TERMINÉ 

Sustainable Mass Customization - Mass Customization for Sustainability (S-MC-S)

Date du début: 1 mai 2010, Date de fin: 30 avr. 2013,

..., production and supply chain configurations imposed by MC implementation in a networked environment. 2)Assessment model: defining the assessment model needed to evaluate the impact of production systems and different supply chain configurations 3)Business Model: defining the framework and strategies for creating economic, social and ecological value through the systematic implementation of S-MC-S ...
Voir le projet

 14

 TERMINÉ 

Saving Energy in Social Housing with ICT (eSESH)

Date du début: 1 mars 2010, Date de fin: 28 févr. 2013,

...ased energy management and awareness services directly to tenants, by providing effective ICT monitoring and control of local power generation and the full heat delivery chain for district / building systems and by providing data in support of more targeted policy and investment decisions at national, regional and organisational level.In operational terms the consortium will carry out intensive wo ...
Voir le projet

 33

 TERMINÉ 

South-East European TSO Challenges (SEETSOC)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

...cial frameworks in South East Europe to facilitate cross-border trading of both power and grid services, ensuring that they will accommodate a wide range of operating situations; • Development of systems and tools that will enable TSOs and other players in the energy field to utilize innovative service arrangements to improve their efficiency and enhance their services to customers; • Develop and ...
Voir le projet

 16

 TERMINÉ 

Future Industrial Model for SMEs (FutureSME)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2012,

The primary concept of this project is to research, develop, validate and valorise an architecture and set of tools, methodologies and structures which will assist European companies attain a competitive position in world markets in the mid to long term horizon. The target group is SMEs and specifically those from the 50 – 150 employee level. Within this target group, those organisations with high ...
Voir le projet

 29

 TERMINÉ 
"The VIAJEO project will design, demonstrate and validate an open platform which will be able to: support the transport operations, planning and a wide range of traveller information services; deliver dynamic information independent from the language to improve their provision of transport information and traveller services through integrated traffic data collection and management; deliver a solu ...
Voir le projet

 25