Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Next generation Pass-By Noise approaches for new powertrain vehicles (PBNv2)

Date du début: 1 mai 2017, Date de fin: 30 avr. 2021,

With transportation noise being the second most deadly environmental pollutant in Europe, engineering for future mobility must be inspired by ecology, economy and health to enable green and silent vehicles. Legislations define maximum noise emission limits that have to be complied with during standardized pass-by noise test procedures. Given novel, often electrified, vehicle powertrain concepts, n ...
Voir le projet

 10

 TERMINÉ 

Smart and Inclusive Solutions for a Better Life in Urban Districts (SMARTER TOGETHER)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2021,

SMARTER TOGETHER’s overarching vision is to find the right balance between smart technologies and organizational/ governance dimensions in order to deliver smart and inclusive solutions and to improve citizen’s quality of life.SMARTER TOGETHER gather the European Lighthouse cities Lyon, Munich, Vienna, the Follower cities Santiago de Compostela, Sofia, Venice and Kyiv and Yokohama as observer citi ...
Voir le projet

 30

 TERMINÉ 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Voir le projet

 31

 TERMINÉ 

Big Data Value ecosystem (BDVe)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The mission of BDVe is to support the Big Data Value PPP in realizing a vibrant data-driven EU economy or said in other words, BDVe will support the implementation of the PPP to be a SUCCESS.Behind that mission, there are multiple goals to achieve, which should be taken into full consideration when defining the directions of the PPP. Some of the most challenging ones are: (1) achieving a more comp ...
Voir le projet

 11

 TERMINÉ 

Sharing Cities (SHAR-LLM)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Voir le projet

 36

 TERMINÉ 
Five DSOs (CEZ distribuce, ERDF, EON, Enexis, Avacon) associated with power system manufacturers, electricity retailers and power system experts, propose a set of six demonstrations for 12 to 24 months. Within three years, they aim at validating the enabling role of DSOs in calling for flexibility sources according to local, time-varying merit orders. Demonstrations are designed to run 18 separat ...
Voir le projet

 20

 TERMINÉ 
From aeronautics to oil&gas, complex metal parts embrace major challenges across their lifecycles from the green field intensive manufacturing to the numerous maintenance and repairing operations worldwide distributed. The synergic combination of additive and subtractive processes could overcome individual shortcomings, going beyond the simple succession of steps. 'Plug and produce' modular approa ...
Voir le projet

 20

 TERMINÉ 

PROMOTioN - Progress on Meshed HVDC Offshore Transmission Networks (PROMOTION)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance componen ...
Voir le projet

 35

 TERMINÉ 

Particle Reduced, Efficient Gasoline Engines (PaREGEn)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

PaREGEn addresses the short term scope of the GV-02 call via research into and the innovation of gasoline engines for light duty vehicles. Specifically, engines used in mid to premium passenger cars will be addressed. With the electrification smaller vehicles, focusing on larger cars is especially important: the need for clean, efficient & economic engines for inter-urban transport is more urgent ...
Voir le projet

 16

 TERMINÉ 
IN2SMART represents the 1st proposal of the Shift2Rail members referred, according to MAAP, to the following Technology Demonstrators (TDs): TD3.7 Railway Information Measuring and Monitoring System (RIMMS), TD3.6 Dynamic Railway Information Management System (DRIMS) and TD3.8 Intelligent Asset Management Strategies (IAMS). These TDs will deploy an overall concept for Intelligent Asset Management ...
Voir le projet

 22

 TERMINÉ 

Start-up activities for Advanced Signalling and Automation Systems (X2Rail-1)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

X2Rail-1 addresses the S2R-CFM-IP2-01-2015 “Start-up activities for Advanced Signalling and Automation System” call issued by the Shift2Rail Joint Undertaking as part of the Innovation Programme 2 “Advanced Traffic Management & Control Systems”.The X2Rail-1 project aims to research and develop six selected key technologies to foster innovations in the field of railway signalling and automation sys ...
Voir le projet

 22

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 

Flexible FE/BE Sensor Pilot Line for the Internet of Everything (IoSense)

Date du début: 1 mai 2016, Date de fin: 30 avr. 2019,

The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Voir le projet

 33

 TERMINÉ 

"City-zen, a balanced approach to the city of the future" (CITY-ZEN)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2019,

"City-zen deals with the development of the city of the future. The project has three major goals, 1- to realize more effective collaboration models and a methodology for development of smart cities, 2- to connect with industry, and have them develop technology to the benefit of smart cities and 3- to showcase to society ambitious pilot projects. Main idea for this project is that after successful ...
Voir le projet

 23

 TERMINÉ 
Science2Society creates, pilots and shares good practices, guidelines and training materials that improve awareness and practical performance in seven concrete university-industry-society interfacing schemes especially affected by Science 2.0 and open innovation. It covers a very wide range of interfacing / co-creation approaches (and the synergy between them) and advances far beyond the tradition ...
Voir le projet

 19

 TERMINÉ 
Four major Distribution System Operators (in Italy, France, Spain and Sweden) with smart metering infrastructure in place, associated with electricity retailers, aggregators, software providers, research organizations and one large consumer, propose five large-scale demonstrations to show that the deployment of novel services in the electricity retail markets (ranging from advanced monitoring to l ...
Voir le projet

 21

 TERMINÉ 

BIG IoT - Bridging the Interoperability Gap of the Internet of Things (BIG IoT)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

...osed systems and lower market entry barriers for developers.The BIG IoT consortium is well suited to reach the outlined goals, as it comprises all roles of an IoT ecosystem: resource providers (e.g., SIEMENS, SEAT), service and application developers (e.g., VODAFONE, VMZ), marketplace providers (e.g., ATOS), platform providers (e.g., BOSCH, CSI, ECONAIS), as well as end users connected through the ...
Voir le projet

 14

 TERMINÉ 
NEED FOR INNOVATION: The critical mass of Energy-efficient Buildings (EeB) in Europe by 2020 will be achieved through sustainable industrialisation of high-performance architectural, structural and building-service components. However, realising the targeted performance in design is hampered by critical shortcomings during on-site construction and refurbishment that cause a lower built-quality and ...
Voir le projet

 14

 TERMINÉ 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Voir le projet

 39

 TERMINÉ 

Hydrogen For All of Europe (HY4ALL) (HY4ALL)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

"Despite major technological development and the start of commercial deployments of the fuel cells and hydrogen technology, the public awareness of FCH technologies has lagged behind this technical progress so far, restricting the appetite of potential customers and risking a lack of support from policymakers. To address this challenge, a consortium of leading experts has come together, combining ...
Voir le projet

 13

 TERMINÉ 
... approach suitable both at small and large scale. Rapid transfer from lab-scale to testing at demonstration sites will be eased by the presence of industrial partners and end-users, as Bilfinger, Siemens, SXS, and Neo Group.
Voir le projet

 15

 TERMINÉ 

ACANTO: A CyberphysicAl social NeTwOrk using robot friends (ACANTO)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2018,

"Despite its recognised benefits, most older adults do not engage in a regular physical activity. The ACANTO project proposes a friendly robot walker (the FriWalk) that will abate a some of the most important barriers to this healthy behaviour.The FriWalk revisits the notion of robotic walking assistants and evolves it towards an activity vehicle. The execution of a programme of physical training ...
Voir le projet

 12

 TERMINÉ 
With anticipated exponential growth of connected devices, future networks require an open solutions architecture facilitated by standards and a strong ecosystem. Such devices need an easy interface to the connected network to request the kind of communication service characterized by guarantees about bandwidth, delay, jitter, packet loss or redundancy. In response, the network should grant the req ...
Voir le projet

 9

 TERMINÉ 

Storage-Enabled Sustainable Energy for Buildings and Communities (SENSIBLE)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2018,

The project SENSIBLE addresses the call LCE-08-2014 by integrating electro-chemical, electro-mechanical and thermal storage technologies as well micro-generation (CHP, heat pumps) and renewable energy sources (PV) into power and energy networks as well as homes and buildings. The benefits of storage integration will be demonstrated with three demonstrators in Portugal, UK and Germany. Évora (Portu ...
Voir le projet

 16

 TERMINÉ 

Optimised and Systematic Energy Management in Electric Vehicles (OSEM-EV)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

Innovation in the automotive industry is of pivotal importance for European´s prosperity. OSEM-EV will provide solutions for better autonomy and predictable range to address today´s car buyers concern about electro mobility. Just increasing the battery capacity is not a viable option because the expectation is to have a familiar level of comfort and safe, eco and human oriented mobility at afforda ...
Voir le projet

 13

 TERMINÉ 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Voir le projet

 47

 TERMINÉ 

Electrification of public transport in cities (ELIPTIC)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

The overall aim of ELIPTIC is to develop new use concepts and business cases to optimise existing electric infrastructure and rolling stock, saving both money and energy. ELIPTIC will advocate electric public transport sector at the political level and help develop political support for the electrification of public transport across Europe. ELIPTIC looks at three thematic pillars:• Safe integratio ...
Voir le projet

 34

 TERMINÉ 

Innovative Intelligent Rail (IN2RAIL)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Voir le projet

 56

 TERMINÉ 
The number of available software applications in the form of web services, mobile apps, etc., is dramatically increasing over the years. This software exploits data collected through various sensors, and online data sources. Its users can access it through a variety of devices, mostly based on mobile technology. Software providers can hardly predict the acceptance of the applications they deliver. ...
Voir le projet

 8

 TERMINÉ 

Satellite Technology for Advanced Railway Signalling (STARS)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2018,

The STARS project paves the way for the future EGNSS deployment in safety relevant railway applications. By evolving the highly developed and deployed ERTMS standard through the implementation of the satellite positioning functionality, it will be possible to reduce the cost of the future railway signalling systems, especially for lines with lower traffic density. The project deals with three main ...
Voir le projet

 18

 TERMINÉ 

Ubiquitous iNteroperable Care for Ageing People (UNCAP)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The lack of ICT platforms based on open standards is regarded as one of the most significant market barriers to the creation of new care & assistance paradigms with global interconnection and interworking. UNCAP delivers an interoperable platform based on open industrial standards that leverages on existing technologies for biosensing, indoor/outdoor localisation and home-automation. The result is ...
Voir le projet

 23

 TERMINÉ 
The vision of PaaSword is to maximize and fortify the trust of individual, professional and corporate customers to Cloud -enabled services and applications, to safeguard both corporate and personal sensitive data stored on Cloud infrastructures and Cloud-based storage services, and to accelerate the adoption of Cloud computing technologies and paradigm shift from the European industry. Thus, PaaSw ...
Voir le projet

 10

 TERMINÉ 
The ROLL2RAIL project aims to develop key technologies and to remove already identified blocking points for radical innovation in the field of railway vehicles, as part of a longer term strategy to revolutionise the rolling stock for the future.The high level objectives of the work are to pave the way to:• Increase the capacity of the railway system and bring flexibility to adapt capacity to deman ...
Voir le projet

 34

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Next Generation Train Control (NGTC)

Date du début: 1 sept. 2013, Date de fin: 28 févr. 2017,

The main scope of this Next Generation Train Control (NGTC) project is to analyse the commonality and differences of required functionality for mainline and urban lines and develop the convergence of both ETCS and CBTC systems, determining the level of commonality of architecture, hardware platforms, and system design that can be achieved. This will be accomplished by building on the experience of ...
Voir le projet

 21

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 

New Bus ReFuelling for European Hydrogen Bus Depots (NewBusFuel)

Date du début: 1 juin 2015, Date de fin: 31 déc. 2016,

The overall aim of NewBusFuel is to resolve a significant knowledge gap around the technologies and engineering solutions required for the refuelling of a large number of buses at a single bus depot. Bus depot scale refuelling imposes significant new challenges which have not yet been tackled by the hydrogen refuelling sector:• Scale – throughputs in excess of 2,000kg/day (compared to 100kg/day fo ...
Voir le projet

 27

 TERMINÉ 

Full Aero-thermal Combustor-Turbine interactiOn Research (FACTOR)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2016,

To achieve lower Specific Fuel Consumption (SFC) and CO2/NOx emissions, modern turbomachineries operate at high velocities and high temperature conditions. The lack of confidence in the prediction of combustor-turbine interactions leads to apply extra safety margins on components design. Therefore, the understanding of combustor-turbine flow field interactions is mandatory to preserve High Pressur ...
Voir le projet

 24

 TERMINÉ 
DOLFIN addresses the demand/response and energy stabilisation scenario of the Smart Grid by optimising the energy consumption of Data Centres (DC), accompanied, if necessary, with a respective negotiation and readjustment of the DC's Service Level Agreements (SLAs). To achieve this, DOLFIN adopts an innovative energy closed control loop that targets to deliver the following advancements:• Create a ...
Voir le projet

 10

 TERMINÉ 

Thermal Overall Integrated Conception of Aircraft (TOICA)

Date du début: 1 sept. 2013, Date de fin: 30 sept. 2016,

Thermal behaviour of aircraft has recently become a crucial subject due to many factors: increasing number of complex systems required by modern, more electric, commercial aircraft, the introduction of hotter engines with higher by-pass ratios, the increased use of composite material in aircraft structures, or the confinement of highly dissipative equipment and systems in smaller areas to earn spa ...
Voir le projet

 34