Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The RUGGEDISED project will create urban spaces powered by secure, affordable and clean energy, smart electro-mobility, smart tools and services. The overall aims are:1. Improving the quality of life of the citizens, by offering the citizens a clean, safe, attractive, inclusive and affordable living environment.2. Reducing the environmental impacts of activities, by achieving a significant reducti ...
Voir le projet

 34

 TERMINÉ 

HYDROGEN MEETING FUTURE NEEDS OF LOW CARBON MANUFACTURING VALUE CHAINS (H2Future)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2021,

Under the coordination of VERBUND, VOESTALPINE, a steel manufacturer, and SIEMENS, a PEM electrolyser manufacturer, propose a 26 month demonstration of the 6MW electrolysis power plant installed at the VOESTALPINE LINZ plant (Austria). After pilot plant commissioning, the electrolyser is prequalified with the support of APG, the transmission operator of Austria, in order to provide grid-balancing ...
Voir le projet

 6

 TERMINÉ 

Next generation Pass-By Noise approaches for new powertrain vehicles (PBNv2)

Date du début: 1 mai 2017, Date de fin: 30 avr. 2021,

With transportation noise being the second most deadly environmental pollutant in Europe, engineering for future mobility must be inspired by ecology, economy and health to enable green and silent vehicles. Legislations define maximum noise emission limits that have to be complied with during standardized pass-by noise test procedures. Given novel, often electrified, vehicle powertrain concepts, n ...
Voir le projet

 10

 TERMINÉ 

Smart and Inclusive Solutions for a Better Life in Urban Districts (SMARTER TOGETHER)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2021,

SMARTER TOGETHER’s overarching vision is to find the right balance between smart technologies and organizational/ governance dimensions in order to deliver smart and inclusive solutions and to improve citizen’s quality of life.SMARTER TOGETHER gather the European Lighthouse cities Lyon, Munich, Vienna, the Follower cities Santiago de Compostela, Sofia, Venice and Kyiv and Yokohama as observer citi ...
Voir le projet

 30

 TERMINÉ 

A sound fundament for our future buildings (Acoutect)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

To ensure a healthy environment for people living and working in buildings, research and engineering in the area of building acoustics is essential. Developments in modern building concepts, such as sustainable low-energy consuming buildings, buildings with lightweight materials and open plan working environments, as well as the need to build in extremely noisy areas, require involvement of acoust ...
Voir le projet

 10

 TERMINÉ 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Voir le projet

 31

 TERMINÉ 
A step change in our noise mitigation strategies is required in order to meet the environmental targets set for a number of sectors of activity affecting people through noise exposure. Besides being a hindrance to our daily life and subject to regulations, noise emission is also a competitive issue in today’s global market. To address these issues, new technologies have been emerging recently, bas ...
Voir le projet

 13

 TERMINÉ 

Composable Models and Software for Robotics Systems (RobMoSys)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

RobMoSys will coordinate the whole community’s best and consorted effort to build an open and sustainable, agile and multi-domain European robotics software ecosystem.RobMoSys envisions an integration approach built on-top-of, or rather around, the current code-centric robotic platforms, by means of the systematic application of model-driven methods and tools that explicitly focus on (system-of-) ...
Voir le projet

 9

 TERMINÉ 

Big Data Value ecosystem (BDVe)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The mission of BDVe is to support the Big Data Value PPP in realizing a vibrant data-driven EU economy or said in other words, BDVe will support the implementation of the PPP to be a SUCCESS.Behind that mission, there are multiple goals to achieve, which should be taken into full consideration when defining the directions of the PPP. Some of the most challenging ones are: (1) achieving a more comp ...
Voir le projet

 11

 TERMINÉ 
The main goal of the CLOVER project is to offer a novel methodology in an environmental mechatronic control system design relying on multidisciplinary knowledge. This methodology should allow aspects to be taken into account, such as controller robustness, indirect measurement of system states and parameters, and disturbances attenuation on the stage of establishing controller architecture. In add ...
Voir le projet

 9

 TERMINÉ 

Sharing Cities (SHAR-LLM)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Voir le projet

 36

 TERMINÉ 
Limiting the climate change-induced temperature increase to less than 2°C will require strong reductions in greenhouse gas emissions. Lightweight materials and fibre-reinforced composites in particular, are a key enabling technology to achieve this goal. Current composite applications are however strongly overdesigned due to a lack of reliable design tools and predictive models for their mechanica ...
Voir le projet

 10

 TERMINÉ 
Batteries are not yet the ideal energy container they were promised to be. They are expensive, fragile and potentially dangerous. Moreover the current EV cannot compete yet with traditional vehicles when it comes to driving range and flexibility. EVERLASTING intends to bring Li-ion batteries closer to this ideal by focusing on the following technology areas.• Predicting the behavior of battery ...
Voir le projet

 11

 TERMINÉ 
The Triangulum project will demonstrate how a systems innovation approach based around the European Commission’s SCC Strategic Implementation Plan can drive dynamic smart city development. We will test the SIP across three lighthouse cities: Manchester, Eindhoven and Stavanger, which represent the main typologies of European cities. They will be complemented by our follower cities Prague, Leipzig ...
Voir le projet

 22

 TERMINÉ 
Five DSOs (CEZ distribuce, ERDF, EON, Enexis, Avacon) associated with power system manufacturers, electricity retailers and power system experts, propose a set of six demonstrations for 12 to 24 months. Within three years, they aim at validating the enabling role of DSOs in calling for flexibility sources according to local, time-varying merit orders. Demonstrations are designed to run 18 separat ...
Voir le projet

 20

 TERMINÉ 
From aeronautics to oil&gas, complex metal parts embrace major challenges across their lifecycles from the green field intensive manufacturing to the numerous maintenance and repairing operations worldwide distributed. The synergic combination of additive and subtractive processes could overcome individual shortcomings, going beyond the simple succession of steps. 'Plug and produce' modular approa ...
Voir le projet

 20

 TERMINÉ 

PROMOTioN - Progress on Meshed HVDC Offshore Transmission Networks (PROMOTION)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance componen ...
Voir le projet

 35

 TERMINÉ 

Dependability Engineering Innovation for CPS - DEIS (DEIS)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

Cyber-Physical-Systems harbor the potential for vast economic and societal impact in all major application domains, however in case of failure this may lead to catastrophic results for industry and society. Thus, ensuring the dependability of such systems is the key to unlocking their full potential and enabling European industries to develop confidently business models that will nurture their soc ...
Voir le projet

 10

 TERMINÉ 
Blood-based biomarkers such as Circulating Tumor Cells (CTCs), circulating free tumor DNA (cfDNA) and microRNAs (miRNAs) have the potential to improve the development of personalized medicines for cancer patients. This is of particular importance when biopsies of the primary tumor or metastases are not accessible (e.g. at early disease stages or in minimal residual disease) or possible and the ass ...
Voir le projet

 34

 TERMINÉ 
Requirements engineering is a key activity in ICT projects: What are current user needs and what requirements satisfy them? How much effort would a requirement cost and in which release should it be delivered? Which requirements can be reused from similar projects? Are there hidden dependencies or inconsistencies? What trade-offs are acceptable for users and other stakeholders? A satisfactory, eff ...
Voir le projet

 9

 TERMINÉ 

MRI and Ultrasound Robotic Assisted Biopsy (MURAB)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

...ial partners are involved with expertise in the delivery of safe robotics components and applications (KUKA), as well as with great knowledge and ambition in pushing innovation to the medical market (SIEMENS).
Voir le projet

 8

 TERMINÉ 

Innovative Reliable Nitride based Power Devices and Applications (InRel-NPower)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The main objective of this proposal is to develop reliable GaN-based power devices and systems for high and medium power electronics targeting industrial and automotive applications and bringing the GaN power devices another step towards the wide usability in the energy saving environment to further tap the full potential which this new material brings along.This proposal addresses two subjects, o ...
Voir le projet

 11

 TERMINÉ 

Tidal Turbine Power Take-Off Accelerator (TIPA)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

...s outside the tidal sector, such as wave power and marine propulsion.The project is led by Nova Innovation, a world-leading tidal energy technology and project developer. Project partners are: SKF, Siemens, The University of Edinburgh, Delft Technical University, Wood Group and the Center for Wind Power Drives RWTH Aachen University.This proposal is being submitted to the call LCE-07-2016-2017: De ...
Voir le projet

 7

 TERMINÉ 

My Health - My Data (MH-MD)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

Issues of data subjects’ privacy and data security represent a crucial challenge in the biomedical sector more than in other industries. The current IT landscape in this field shows a myriad of isolated, locally hosted patient data repositories, managed by clinical centres and other organisations, which are subject to frequent and massive data breaches. Patients are disenfranchised in this process ...
Voir le projet

 16

 TERMINÉ 
“AdMoRe: Empowered decision-making in simulation-based engineering: Advanced Model Reduction for real-time, inverse and optimization in industrial problems” aims at providing in-depth training of Early Stage Researches (ESRs) in the development and application of state-of-the-art computational models and numerical methods to solve cutting-edge engineering problems. The main driving factors of all ...
Voir le projet

 7

 TERMINÉ 
The overall objective of PARADDISE project is to rationalize, to structure and to make available to the stakeholders of manufacturing value chain the knowledge and the tools for combining two antithetical processes: Laser Metal Deposition (LMD) and Machining (milling and turning). The project will develop expert CAx technologies, smart components and monitoring and control systems tailored for the ...
Voir le projet

 8

 TERMINÉ 
The OPENHYBRID project will overcome the technical and commercial barriers of current hybrid manufacturing systems to deliver a single manufacturing system capable of undertaking a wider range of processes in a seamless automated operation. The new system will offer unrivalled flexibility in terms of materials, including the ability to switch between powder and wire feed-stock within a single part ...
Voir le projet

 14

 TERMINÉ 
Despite the proclaimed benefits (i.e. scalability, reliability, cost-effectiveness) of Future Internet (FI) technologies (i.e. edge & cloud computing, IoT/CPS) for factory automation, their adoption from manufacturers remains low for various reasons, including technology issues (e.g., poor situation awareness, limited deployments, no standards-based reference implementations) and the lack of a smo ...
Voir le projet

 12

 TERMINÉ 

Particle Reduced, Efficient Gasoline Engines (PaREGEn)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

PaREGEn addresses the short term scope of the GV-02 call via research into and the innovation of gasoline engines for light duty vehicles. Specifically, engines used in mid to premium passenger cars will be addressed. With the electrification smaller vehicles, focusing on larger cars is especially important: the need for clean, efficient & economic engines for inter-urban transport is more urgent ...
Voir le projet

 16

 TERMINÉ 
"Advanced Manufacturing has been highlighted by the EU as one of the key enablers to support and promotion of business research and innovation in key enabling technologies. Therefore, a number of objectives, aligned with pursuing the large scale targets, have been set for advanced manufacturing through four pillars: technology, economic, social and environment. Thus, HINDCON project aims to adapt ...
Voir le projet

 12

 TERMINÉ 

Future Improvement for Energy and Noise (FINE 1)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

The FINE 1 project aims to reduce operational costs of railways by a reduction of energy use and noise related to rail traffic. The project results are expected to enable an increase of traffic in Europe and to enhance the attractiveness of railway in relation to other modes of transport. The project activities will support the innovation process within the S2R Technical Demonstrators (TDs) by p ...
Voir le projet

 9

 TERMINÉ 
IN2SMART represents the 1st proposal of the Shift2Rail members referred, according to MAAP, to the following Technology Demonstrators (TDs): TD3.7 Railway Information Measuring and Monitoring System (RIMMS), TD3.6 Dynamic Railway Information Management System (DRIMS) and TD3.8 Intelligent Asset Management Strategies (IAMS). These TDs will deploy an overall concept for Intelligent Asset Management ...
Voir le projet

 22

 TERMINÉ 

Start-up activities for Advanced Signalling and Automation Systems (X2Rail-1)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

X2Rail-1 addresses the S2R-CFM-IP2-01-2015 “Start-up activities for Advanced Signalling and Automation System” call issued by the Shift2Rail Joint Undertaking as part of the Innovation Programme 2 “Advanced Traffic Management & Control Systems”.The X2Rail-1 project aims to research and develop six selected key technologies to foster innovations in the field of railway signalling and automation sys ...
Voir le projet

 22

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 

Flexible FE/BE Sensor Pilot Line for the Internet of Everything (IoSense)

Date du début: 1 mai 2016, Date de fin: 30 avr. 2019,

The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Voir le projet

 33

 TERMINÉ 

"City-zen, a balanced approach to the city of the future" (CITY-ZEN)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2019,

"City-zen deals with the development of the city of the future. The project has three major goals, 1- to realize more effective collaboration models and a methodology for development of smart cities, 2- to connect with industry, and have them develop technology to the benefit of smart cities and 3- to showcase to society ambitious pilot projects. Main idea for this project is that after successful ...
Voir le projet

 23

 TERMINÉ 
Science2Society creates, pilots and shares good practices, guidelines and training materials that improve awareness and practical performance in seven concrete university-industry-society interfacing schemes especially affected by Science 2.0 and open innovation. It covers a very wide range of interfacing / co-creation approaches (and the synergy between them) and advances far beyond the tradition ...
Voir le projet

 19

 TERMINÉ 

Demand Response in Block of Buildings (DR-BOB)

Date du début: 1 mars 2016, Date de fin: 28 févr. 2019,

The aim of the DR-BOB project is to demonstrate the economic and environmental benefits of demand response in blocks of buildings for the different key actors required to bring it to market. To achieve its aim the DR-BOB project will:• Integrate existing technologies to form the DR-BOB Demand Response Energy Management solution for blocks-of-buildings with a potential ROI of 5 years or less. • De ...
Voir le projet

 10

 TERMINÉ 
Four major Distribution System Operators (in Italy, France, Spain and Sweden) with smart metering infrastructure in place, associated with electricity retailers, aggregators, software providers, research organizations and one large consumer, propose five large-scale demonstrations to show that the deployment of novel services in the electricity retail markets (ranging from advanced monitoring to l ...
Voir le projet

 21

 TERMINÉ 
TagItSmart sets out to redefine the way we think of everyday mass-market objects not normally considered as part of an IoT ecosystem. These new smarter objects will dynamically change their status in response to a variety of factors and be seamlessly tracked during their lifecycle. This will change the way users-to-things interactions are viewed.Combining the power of functional inks with the perv ...
Voir le projet

 15