Rechercher des projets européens

7 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Start-up activities for Advanced Signalling and Automation Systems (X2Rail-1)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

X2Rail-1 addresses the S2R-CFM-IP2-01-2015 “Start-up activities for Advanced Signalling and Automation System” call issued by the Shift2Rail Joint Undertaking as part of the Innovation Programme 2 “Advanced Traffic Management & Control Systems”.The X2Rail-1 project aims to research and develop six selected key technologies to foster innovations in the field of railway signalling and automation sys ...
Voir le projet

 22

 TERMINÉ 
IN2SMART represents the 1st proposal of the Shift2Rail members referred, according to MAAP, to the following Technology Demonstrators (TDs): TD3.7 Railway Information Measuring and Monitoring System (RIMMS), TD3.6 Dynamic Railway Information Management System (DRIMS) and TD3.8 Intelligent Asset Management Strategies (IAMS). These TDs will deploy an overall concept for Intelligent Asset Management ...
Voir le projet

 22

 TERMINÉ 

Research into enhanced tracks, switches and structures (IN2TRACK)

Date du début: 1 sept. 2016, Date de fin: 28 févr. 2019,

Research into Enhanced Track, Switches and StructureThe railway of the future needs to meet the predicted growth in societal demand in terms of capacity and service, address the environmental challenges of the 21st century, and enable the political objectives of the European Union. IN2TRACK is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by del ...
Voir le projet

 26

 TERMINÉ 

Viable Wagonload production Schemes (VIWAS)

Date du début: 1 sept. 2012, Date de fin: 30 nov. 2015,

Single wagonload (SWL) transport is still a major component in numerous European states transport systems and in the logistics of different economic sectors such as steel, chemical industry and automotive. However changing framework conditions and increasingly demanding market requirements have led to dramatic market losses and even to complete shutdown of SWL business in some countries. As this b ...
Voir le projet

 10

 TERMINÉ 
D-RAIL will focus on freight traffic, identifying root causes of derailment of particular significance to freight vehicles, which have a wider range of operating parameters (as a result of the huge range in loads, speeds and maintenance quality) than passenger vehicles. One key question that will be studied is how independent minor faults (e.g., a slight track twist and a failing bearing) could co ...
Voir le projet

 22

 TERMINÉ 

Railway Induced Vibration Abatement Solutions (RIVAS)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2013,

"Ground vibration, effected by rail services, is an important environmental concern, affecting European citizens nearby any rail infrastructure. Surveys show that many Europeans are subjected to annoying levels of feelable vibration and vibration-induced noise. Although solutions are available for track in tunnels, tracks at grade are a much more extensive problem even for vibration-induced noise. ...
Voir le projet

 27

 TERMINÉ 

Public Transportation - Accessibility for All (PubTrans4all)

Date du début: 1 sept. 2009, Date de fin: 30 nov. 2012,

Pubtrans4all will develop a prototype vehicle-based boarding assistance system that can be built into new rail vehicles or retrofitted into existing rail vehicles to improve accessibility for all persons. Accessibility for rail vehicles is particularly problematic since rail vehicles have a long service life and so many currently inaccessible vehicles will remain in service well into the future. P ...
Voir le projet

 14