Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
certMILS develops a security certification methodology for Cyber-physical systems (CPS). CPS are characterised by safety-critical nature, complexity, connectivity, and open technology. A common downside to CPS complexity and openness is a large attack surface and a high degree of dynamism that may lead to complex failures and irreparable physical damage. The legitimate fear of security or function ...
Voir le projet

 9

 TERMINÉ 

Building and district thermal retrofit and management solutions (THERMOSS)

Date du début: 1 sept. 2016, Date de fin: 29 févr. 2020,

... platform for smart energy management at building and district-level. The THERMOSS technologies have been picked out from the catalogs of prominent European industrial players, Bosch, Veolia, Exergy, Schneider Electric taking into account business profitability, energy efficiency and potential for large-scale deployment. They will be tuned, combined and sized as part of the project thanks to dedic ...
Voir le projet

 13

 TERMINÉ 
Five DSOs (CEZ distribuce, ERDF, EON, Enexis, Avacon) associated with power system manufacturers, electricity retailers and power system experts, propose a set of six demonstrations for 12 to 24 months. Within three years, they aim at validating the enabling role of DSOs in calling for flexibility sources according to local, time-varying merit orders. Demonstrations are designed to run 18 separat ...
Voir le projet

 20

 TERMINÉ 
An inspiration for INVADE are the world-wide agreements on minimisation of human caused effects to climate change and energy efficiency targets set at the European Union with ambitious goals for reduction of greenhouse gas emission and for increase of renewable energy share. To enable a higher share of renewable energy sources to the smart grid and gain a traction in the market place a few critica ...
Voir le projet

 12

 TERMINÉ 

Massive InteGRATion of power Electronic devices (MIGRATE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

...ation. European TSOs from Estonia, Finland, France, Germany, Iceland, Ireland, Italy, Netherlands, Slovenia, Spain and UK have joined to address such challenges with manufacturers (Alstom, Enercon, Schneider Electric) and universities/research centres. They propose innovative solutions to progressively adjust the HVAC system operations. Firstly, a replicable methodology is developed for appraising ...
Voir le projet

 24

 TERMINÉ 

GrowSmarter

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

GrowSmarter aims to:• Improve the quality of life for European citizens by better mobility, housing and the quality of urban infrastructure while improving the citizens economy by lower energy costs and creating as much as 1500 new jobs (on the demonstration level).• Reduce the environmental impact by lower energy needs by 60 % and increased use of renewable energy thus reducing GHG emissions eve ...
Voir le projet

 41

 TERMINÉ 
Heating consumption in the residential sector in Europe is around 2300 TWh/y, DHW consumptions reaches 500 TWh/y, while cooling consumption is less than 100 TWh/y. The construction sector offers unique opportunities to decarbonise the European economy. However, as the replacement rate of the existing stock is very small (1-1.5 % per year), acceleration is needed.On top of this, the reorganisation ...
Voir le projet

 18

 TERMINÉ 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Voir le projet

 32

 TERMINÉ 
The project will deploy and demonstrate local storage technologies which have reached TRL 5-6 in a real electrical grid, and will develop ICT tools to exploit the synergies between them, the smart grid and the citizens. The demonstration in this real environment will be driven by five use cases covering low voltage and medium voltage scenarios and a wide range of applications and functionalities. ...
Voir le projet

 14

 TERMINÉ 
SMEs play a key role in European economies; they constitute the largest business block and provide the bulk of employment. They generate most of the innovative ideas for ICT and CPS-enabled IoT products, two areas which represent an inflection point for innovators and industry in Europe. EuroCPS is an ambitious project that aims to arm Europe with a network of design centres that will boost and i ...
Voir le projet

 15

 TERMINÉ 

Framework for Innovation Competencies Development and Assessment

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

EU’s Innovation Union Initiative underlines the importance of innovations in all sectors of the economy. For creating new innovations we need individuals that are capable to participate in diverse everyday innovation processes. One main problem is that universities don’t have proper tools to measure the development of the students’ innovation competencies during their studies. Therefore, we don’t ...
Voir le projet

 14

 TERMINÉ 

Local Electricity retail Markets for Prosumer smart grid pOWER services (EMPOWER)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The aim is to explore and develop an integrated ICT solution to support the development of an electricity local market place and innovative business models, including operational methods to encourage micro-generation with renewable resources and participation of consumers and prosumers. The creation of incentives for all players would allow for exploiting the latent flexibility of the user-side of ...
Voir le projet

 8

 TERMINÉ 
CommONEnergy focuses on existing shopping malls to be refurbished and buildings with a different original function, redesigned to become shopping malls. Wholesales&Retail buildings represent 28% of the total non-residential building stock (BPIE, 2010), accounting for approximately 157 Mtoe in 2005 (EU EEAP). Considering typical shopping malls high impact on modern society (ICSC, 2008), the project ...
Voir le projet

 23

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 
To solve the energy dilemma, research effort was concentrated on stand-alone buildings weakly tight to their immediate environment. Specifically in each building only key sub-systems were considered individually. Such individual systems were made more effective by becoming pervasive into any building area (the reign of “boxes” and “controllers”). Importing parameters from other sub-systems allowed ...
Voir le projet

 18

 TERMINÉ 

Energy Efficient Converters using GaN Power Devices (E2COGAN)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2016,

The E2COGaN project will target the demonstration of GaN-on-Si as a disruptive power device technology platform through the whole value chain up to demonstrators with high industrial, societal and environmental relevance. Its innovative character will be proven through a well-balanced and application specific trade-off between the “corner” benefits given by higher efficiency, higher switching freq ...
Voir le projet

 25

 TERMINÉ 
Description Packaging and thermal management in an efficient and cost effective way for SiC and GaN-based power devicesFor industrial motor-drive, UPS and solar inverters applications and aerospace or telecom radio frequency applications, new emerging power semiconductor technologies, respectively SiC and GaN, have demonstrated their high ...
Voir le projet

 15

 TERMINÉ 

SCUBA - Self-organising, Cooperative, and robUst\n Building Automation (SCUBA)

Date du début: 1 nov. 2011, Date de fin: 31 déc. 2014,

Large scale embedded Monitoring and Control (M&C) systems in energy management, transporta-tion, security and safety often co-exist alongside each other with little cooperation within and among heterogeneous systems which hampers the increasing demand to operate the whole system optimally. A good example is building management, a market worth in excess of $36 billion annually by 2015, where a wide ...
Voir le projet

 9

 TERMINÉ 
The SOLUTION project mobilises public / private resources to build showcases of energy self sufficient communities in Austria, Croatia, Finland and Switzerland (together with the associated Slovenian community) with a strong potential for replication throughout Europe. SOLUTION is designed to respond to the needs of an effective take-off of the European SET-plan by demonstrating novel applications ...
Voir le projet

 19

 TERMINÉ 
The overall objective of CitInES is to design and demonstrate a multi-scale multi-energy decision-making tool to optimise the energy efficiency of cities or large industrial complexes by enabling them to define sustainable, reliable and cost-effective long-term energy strategies. Demonstrations will take place in two cities in Italy, Cesena and Bologna, and in one oil refinery in Turkey, Tupras.In ...
Voir le projet

 13

 TERMINÉ 

ArchitecturE for Service-Oriented Process - Monitoring and Control (IMC-AESOP)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2013,

IMC-AESOP will investigate a Service-oriented Architecture approach for monitoring and control of Process Control applications (batch and continuous process). Large process industry systems are a complex set of multi-disciplinary, connected, heterogeneous systems that function as a complex system of which the components are themselves systems. They link many components from individual groups of se ...
Voir le projet

 19

 TERMINÉ 

INTelligent Electrical Grid Sensor communications (INTEGRIS)

Date du début: 1 févr. 2010, Date de fin: 31 déc. 2012,

INTEGRIS project proposes the development of a novel and flexible ICT infrastructure based on a hybrid Power Line Communication-wireless integrated communications system able to completely and efficiently fulfill the communications requirements foreseen for the Smart Electricity Networks of the future.This includes encompassing applications such as monitoring, operation, customer integration, dema ...
Voir le projet

 9

 TERMINÉ 

Cooperating Objects NETwork of excellence (CONET)

Date du début: 1 juin 2008, Date de fin: 30 nov. 2012,

A number of different system concepts have gained a lot of relevance in the area of embedded systems over the past couple of years: Embedded systems, pervasive computing and wireless sensor networks. These three types of quite diverse systems share a lot of commonalities but also have some complementary aspects in common that make a combination into a coherent system vision promising.The term "Coo ...
Voir le projet

 18

 TERMINÉ 
More than 40% of the total energy consumed in the EU is used to cover the needs for heating, cooling and electricity of buildings. As the major part of this energy is produced from combustion of oil and natural gas, both the EU and the EU Building Sector are highly depended on imported fossil fuels. Moreover, the Sector is also a major contributor to Green-House Gas (GHG) emissions. To address iss ...
Voir le projet

 19

 TERMINÉ 

Flexible Wireless Automation in Real-Time Environments (flexWARE)

Date du début: 1 sept. 2008, Date de fin: 29 févr. 2012,

The project Flexible Wireless Automation in Real-Time Environment aims to implement a novel platform, which will have a real-time communication based on WLAN (IEEE 802.11). This novel secure middleware between the physical communication and the application will be designed with special respect to security, flexibility and mobile, real-time enabled nodes that can roam between the Access Points of t ...
Voir le projet

 9