Rechercher des projets européens

9 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

High efficient Particulate free Gasoline Engines (UPGRADE)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

The UPGRADE project aims to support the transition to a high efficient, cleaner and affordable powertrain technology systems, based on Spark Ignited GDI (Gasoline Direct Injection) approach, suitable for future Light Duty applications. The project also includes a deep analysis of the phenomenon of the formation of the nanoparticles in relationship to the engine design and its operating conditions ...
Voir le projet

 12

 TERMINÉ 

Mild Hybrid cOst effective solutions for a fast Market penetratiON (THOMSON)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

Mild Hybrid cOst effective solution for a fast Market penetratiON. THOMSON (Mild Hybrid cOst effective solutions for a fast Market penetration) project aims to the development of cost effective solutions, based on 48V architectures, answering the need in reducing the environmental impact of the transportation sector through a clever combination of advanced engines technologies, electrification and ...
Voir le projet

 12

 TERMINÉ 
In nearly every sector of industrial manufacturing surface processing techniques are used, e.g. for structuring or polishing of aesthetical or functional surfaces. In many applications laser based surface processing techniques already achieve highest precision and quality. But often the throughput is limited.State of the art for many applications in laser surface processing is the utilization of o ...
Voir le projet

 10

 TERMINÉ 

Worker-Centric Workplaces in Smart Factories (FACTS4WORKERS)

Date du début: 1 déc. 2014, Date de fin: 30 nov. 2018,

It is the high ambition of the project to create “FACTorieS for WORKERS” (FACTS4WORKERS), therefore a serious effort will be put into integrating already available IT enablers into a seamless & flexible Smart Factory infrastructure based on worker-centric and data-driven technology building blocks. As FACTS4WORKERS is underpinned by a clear human-centric approach: usability, user experience and te ...
Voir le projet

 17

 TERMINÉ 

REal World Advanced Technologies foR Diesel Engines (REWARD)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

The overall objective of the REWARD project is to develop the knowhow, intellectual property rights and technical capabilities to adequately and cost-effectively produce cleaner, highly efficient Diesel powertrains and aftertreatment technologies for future cleaner class A, B, C, D and E passenger cars and light commercial vehicles (LCVs) up to 3,500 kg that “go beyond Euro 6 limits under Real Dri ...
Voir le projet

 16

 TERMINÉ 

Intelligent Bearing (iBearing)

Date du début: 1 mars 2016, Date de fin: 30 avr. 2018,

...in order to calculate the most reliable prediction of the time to failure, without intervention of any testing operator.The consortium composed by Active Space Technologies, Cranfield University, and Schaeffler intend study the best solutions to achieve the iBearing goal. The selected solutions will be designed, implemented and tested on the Schaeffler test rigs, in the framework of the present ac ...
Voir le projet

 3

 TERMINÉ 

Mobilnošću učenika i osoblja do novih kompetencija

Date du début: 1 sept. 2016, Date de fin: 31 août 2017,

...l competences in the field of vocational training; which will consist of programming and working on CNC machine tools according to technical and technological documentation and will be carried out at Schaeffler Technologies AG & Co. KG Herzogenaurach - acquire multilingual competences (English, German), particularly in the vocational field and the understanding of technical and technological docum ...
Voir le projet

 4

 TERMINÉ 
The FAG Magyarország Ipari Kft. employs nearly 1400 employees. The company as a member of the Schaeffler Group produces bearings mainly for the automotive industry. The recent economic crisis has hit the automotive industry, however, the FAG reacted successfully to the new challenges: the company?s new goal is to increase its production volume to 3 million pieces by 2015 compared to the 1.6 millio ...
Voir le projet

 2

 TERMINÉ 

Corrosion protection with perfect atomic layers (CORRAL)

Date du début: 1 sept. 2008, Date de fin: 31 août 2011,

The aim of this project is to develop high density defect-free ultra-thin sealing coatings with excellent barrier properties and improved corrosion resistance. Their successful functioning will be provided by the synergy of the coating “perfect” morphology and its complex structural design, which can be tailored at the nanoscale. The study will be focused on development of novel nanostructured coa ...
Voir le projet

 15