Rechercher des projets européens

6 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Cooperative Mobility Systems and Services for Energy Efficiency (eCoMove)

Date du début: 1 avr. 2010, Date de fin: 31 janv. 2014,

The eCoMove project will create an integrated solution for road transport energy efficiency by developing systems and tools to help drivers sustainably eliminate unnecessary fuel consumption (and thus CO2 emissions), and to help road operators manage traffic in the most energy-efficient way. By applying this combination of cooperative systems using vehicle-infrastructure communication, the project ...
Voir le projet

 43

 TERMINÉ 

Drivers' behavioural adaptation over the time in response to ADAS use (ADAPTATION)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

The objective of ADAPTATION is to improve the career perspectives of young researchers by taking part in an innovative European research programme aiming at investigating drivers' behavioural adaptation and its underlying processes over the time in response to Advanced Driver Assistance Systems (ADAS) use. The research programme integrates, under a joint theoritical framework and a joint longitudi ...
Voir le projet

 10

 TERMINÉ 

E-safety Vehicle Intrusion proTected Applications (EVITA)

Date du début: 1 juil. 2008, Date de fin: 31 déc. 2011,

Future safety applications based on car-to-car and car-to-infrastructure communication have been identified as a measure for decreasing the number of fatal traffic accidents. Examples for such applications are local danger warnings, traffic light pre-emption, or electronic emergency brakes. While these functionalities inspire a new era of safety in transportation, new security requirements need to ...
Voir le projet

 14

 TERMINÉ 

Cooperative Intersection Safety (INTERSAFE-2)

Date du début: 1 juin 2008, Date de fin: 31 mai 2011,

Today, most so called 'black spots' have been eliminated from the road networks. However, intersections can still be regarded as black spots. Depending on the region and country, from 30 to 60% of all injury accidents and up to one third of the fatalities are intersection related. This is due mainly to the fact that accident scenarios at intersections are among the most complex ones, since differe ...
Voir le projet

 13

 TERMINÉ 

PRE-DRIVE

Date du début: 1 juil. 2008, Date de fin: 30 sept. 2010,

Based on the overall description of a common European architecture for an inter-vehicle and vehicle-to-infrastructure communication system PRE-DRIVE C2X shall develop a detailed system specification and a working as well as functionally verified prototype. It will be robust enough to be used in future field operational trials of cooperative systems. Furthermore PRE-DRIVE C2X shall develop an integ ...
Voir le projet

 27

 TERMINÉ 

Field opErational teSts supporT Action (FESTA)

Date du début: 5 nov. 2007, Date de fin: 4 juin 2008,

The FESTA Support Action is a vital step in the realisation of scientifically robust and efficiently run Field Operational Tests which aim to evaluate key ICT functions. A consortium of European experts with a wide range of skills has been formed to allow the development of a "best-practise" handbook which will guide the design and implementation of an FOT. The consortium involves the participatio ...
Voir le projet

 21