Rechercher des projets européens

27 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
"The objective of BIOCOMES is to develop 11 new biological control agents (BCAs) for key markets in European agriculture and forestry. BCAs were identified through market analysis by six manufactures of biological control products. BCAs will primarily be for use in open field crops of vegetables (3), of which 2 are also for use in protected crops, arable crops (3), fruit crops (3), and three diffe ...
Voir le projet

 27

 TERMINÉ 

Targeting cardiac fibrosis for heart failure treatment (FIBRO-TARGETS)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

The Fibro-Targets project is a multi-disciplinary 4 years program involving 10 partners ambitioning “the identification, characterisation and validation of in vitro and in vivo models of novel therapeutically relevant targets” for myocardial interstitial fibrosis (MIF) in heart failure. The project is based on the hypothesis that the intervention on novel fibrosis-related targets involved in the p ...
Voir le projet

 11

 TERMINÉ 

BeTheCuRE (BTCURE)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2017,

BTCure is based on the recognition that RA is a heterogeneous disease where a major subset involves adaptive immunity, and that animal models have to develop the line with the different subsets of the human diseases in order to be optimally used for drug discovery and drug evaluation. Our aim is to develop an understanding of the early process in human arthritis subsets and the animal models that ...
Voir le projet

 41

 TERMINÉ 

Guiding Light through Disorder in Adaptive Photonic Resonator Arrays (PHAROS)

Date du début: 1 oct. 2011, Date de fin: 31 janv. 2017,

Planar photonic crystals are dielectric nanostructures that are pursued worldwide as a platform for integrated nanophotonic circuits. Such circuits will process signals coded in light and will consist of thousands of basic components such as resonant nanocavities. At present, unavoidable nanometer-scale disorder makes such large-scale integration impossible. Disorder causes the resonances of the n ...
Voir le projet

 3

 TERMINÉ 
"BRAINVECTORS aims devising new gene therapy(GT)-based treatments for Parkinson’s and other neurodegenerative diseases, in substitution of current systemic treatments, by delivering neurotrophic factors (GDNF) into the CNS with new vectors derived from adeno-associated (AAV), canine adenoviruses (CAV) and lentiviruses (LV) with inducible gene expression.Although AAV, CAV and LVV are considered acc ...
Voir le projet

 12

 TERMINÉ 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Date du début: 1 janv. 2012, Date de fin: 29 févr. 2016,

The proposed HiPEAC network of excellence is a follow-up of an existing network and wants (i) to steer and to increase the European research in computing systems; (ii) to improve the quality of the European computing systems research, and (iii) to create a visible and integrated pan-European community in computing systems. The network is structured along four programs. The membership program aims ...
Voir le projet

 14

 TERMINÉ 

Social Innovation - Empowering the Young (SocIEtY) for the Common Good (SOCIETY)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

“Social Innovation–Empowering the Young (SocIEtY) for the Common Good” will both focus on and integrate disadvantaged young people into the research process to improve their quality of life and to foster social innovation. Therefore SocIEtY will extend the given informational basis for designing and implementing policies to reduce inequalities by giving voice and opportunities for developing aspir ...
Voir le projet

 13

 TERMINÉ 

Access to cultural heritage networks for Europeana (AthenaPlus)

Date du début: 1 mars 2013, Date de fin: 31 oct. 2015,

AthenaPlus will build on the successful experience developed by the previous ATHENA project – where LIDO and the ATHENA Ingestion Server and Mapping Tool (MINT), widely used across the Europeana's ecosystem of projects including the ongoing Linked Heritage project were developed, in order to further advance and complete the effective infrastructure and tools developed to support museums and other ...
Voir le projet

 41

 TERMINÉ 
SARABAND project aims to take advantage of the Q-band frequency (40,5 to 43,5 GHz) in a cost effective way to provide higher performing and integrated network nodes for wireless backhaul of future mobile radio and last mile access for the digital divide by developing smart antennas and front-end radio modules. The use of millimeter waves, particularly the Q-band where 3GHz bandwidth has been regul ...
Voir le projet

 10

 TERMINÉ 

Designing for Adaptability and evolutioN in System of systems Engineering (DANSE)

Date du début: 1 nov. 2011, Date de fin: 31 janv. 2015,

Systems of Systems consist of collections of (possibly independent, pre-existing, geographically distributed and following their own goals) constituent systems whose behaviours are coordinated to provide services and additional value with respect to their original intended operations. This kind of entities offer severe technical, management, and political challenges as witnessed by energy blackout ...
Voir le projet

 11

 TERMINÉ 

REduction of COgnitive BIAses in Intelligence Analysis (RECOBIA)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2015,

The aim of the RECOBIA project is to improve the quality of intelligence analysis by reducing the negative impact of cognitive biases upon intelligence analysis.To this end, we will make an assessment of cognitive biases and assess how these biases affect the practice of intelligence.Building on this initial assessment, best practices to reduce the negative impact of cognitive biases will be defin ...
Voir le projet

 10

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Next Generation Hybrid Interfaces for Spintronic Applications (HINTS)

Date du début: 1 juin 2011, Date de fin: 31 mai 2014,

The development of conceptually new materials following a “double beyond” trend, that is going “beyond CMOS” with “beyond silicon” materials, is one of the most challenging issues for the next generation of products for Information and Communication applications. Future devices for information processing able to increase the public wealth and occupation require a further material downscaling, toge ...
Voir le projet

 14

 TERMINÉ 
"Fungi are heterotrophic microorganisms with devastating impact on agriculture and human health. Agricultural production worth billions of € is destroyed annually by fungal diseases. Human fungal infections have severe consequences on the growing number of immuno-compromised patients, with high mortality rates associated with Aspergillus and Candida infections. There is a critical need to further ...
Voir le projet

 10

 TERMINÉ 

Partage Plus – Digitising and Enabling Art Nouveau for Europeana (PARTAGE PLUS)

Date du début: 1 mars 2012, Date de fin: 30 avr. 2014,

WHY ART NOUVEAU?The Art Nouveau style was a great success all over Europe at the end of the 19th and beginning of the 20th centuries. It is well represented, in almost every art form, in museum collections, archives, libraries, photographic archives, and on buildings throughout Europe. After a short period of disinterest, with the arrival of modernist styles, it seems that Art Nouveau is now even ...
Voir le projet

 25

 TERMINÉ 

DEmonstration of LIdar based Clear Air Turbulence detection (DELICAT)

Date du début: 1 avr. 2009, Date de fin: 31 mars 2014,

"Atmospheric turbulence encounters are the leading cause of injuries to passengers and crews in non-fatal airline accident. The number of turbulence accidents has been growing by a factor of 5 since 1980. A whole class of turbulence (Clear Air Turbulence), representing 40% of turbulence accidents, cannot be detected by any existing equipment including state-of-the-art weather radar. Operational co ...
Voir le projet

 13

 TERMINÉ 
High power and in particular tunable mid-infrared short pulse laser systems operating in the wavelength range between 3 µm and 11 µm have a large potential in different applications, e.g. analytics, medicine and micromaching. Up to now, those systems are only be realised by multistage set-ups consisting of bulk four or five different units, a configuration which is of course very complex, expensiv ...
Voir le projet

 7

 TERMINÉ 
"The aim of this project is to develop a demonstrable, modular and “close-to-market” demonstrator of a stationary rapid reliable vehicle-portable Two Stage Rapid Biological Surveillance and Alarm System for Airborne Threats (TWOBIAS) with extremely low false alarm rates. TWOBIAS will provide reliable information to command control systems (CCS) and first responders within seconds, enhancing securi ...
Voir le projet

 11

 TERMINÉ 

INQUIRE- inquiry-based teacher training for a sustainable future (INQUIRE)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2013,

The science education community agrees that pedagogical practices based on IBSE methods are more effective. But the reality on the ground is different. For various reasons, this type of teaching is not practiced in most European classrooms. INSPIRE counteract this by developing and offering a one-year practically based IBSE teacher training course that will reach out to hundreds of teachers, and i ...
Voir le projet

 18

 TERMINÉ 
Plants sustainably produce low levels of secondary metabolites of high industrial value. However, they are often too complex to be economically manufactured by chemical synthesis. Advanced metabolic engineering and exploitation of plants as Green Factories has been prevented due to poorly understood metabolic pathways in plants and the regulation thereof. SmartCell brings together 14 leading Europ ...
Voir le projet

 19

 TERMINÉ 

Impact Measurement and Performance Analysis of CSR (IMPACT)

Date du début: 1 mars 2010, Date de fin: 31 juil. 2013,

Corporate Social Responsibility (CSR) assumes greater practical significance and political relevance in the EU. A central concern is the extent to which CSR delivers benefits for economies, societies and the environment, providing a business contribution to the EU’s policies for growth, competitiveness, better jobs (Lisbon Strategy) and sustainable development (Gothenburg strategy). By contrast th ...
Voir le projet

 18

 TERMINÉ 
"VIRTUOSO projects aims at providing European Security stakeholders with a toolkit based on an open-source-software framework and a set of advanced information processing tools. This toolkit will allow building end-user oriented applications: - Ranging from open source collection to decision support - Providing at each step actionable, rated, validated information - Integrated in an open framework ...
Voir le projet

 19

 TERMINÉ 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Voir le projet

 27

 TERMINÉ 
ERACOBUILD aims at strengthening and enlarging the strategic networking of RDI programmes in the field of “construction and operation of buildings” initiated in the previous ERABUILD coordination action. ERACOBUILD gathers 34 programme owners or managers coming from 17 EU Members States, 4 Associated Countries and 1 European Region. The new countries will benefit from the experience and results o ...
Voir le projet

 35

 TERMINÉ 
"The diseases caused by Streptococcus pneumoniae are a major public health problem all over the world. Children, elderly people and immuno-compromised individuals are the high-risk targets for pneumococcal diseases. In spite of the availability of a large number of antibiotics the mortality and morbidity due to S. pneumoniae infections remain very high. There are two reasons for this: Firstly, the ...
Voir le projet

 13

 TERMINÉ 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Date du début: 1 févr. 2008, Date de fin: 31 janv. 2012,

Due to technology limitations, the domain of high-performance processors is experiencing a radical shift towards parallelism through on-chip multi-cores and chip customization leading to heterogeneous multi-core systems. Furthermore, the commodity market, the supercomputing market and the embedded market are increasingly sharing the same challenges, leading to convergence of the three markets.The ...
Voir le projet

 14

 TERMINÉ 
This project will be an in-depth qualitative study of the practice and social consequences of the diagnostic and predictive genetic testing of children, focusing specifically on the experiences of parents and health professionals.The study will be based a t the Research Centre for Biotechnology, Society and the Environment (BIOGUM) at the University of Hamburg and carried out by Dr. Jacquelyne Luc ...
Voir le projet

 1