Rechercher des projets européens

9 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Virtualisation of the testing environment (VITE)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

The VITE proposal is addressed to the call S2R-OC-IP2-02-2015-IT virtualization of testing environment. The main objective of VITE proposal is to reduce on-site tests for signalling systems leading to reducing overall testing costs. To achieve this main objective the work is organized in two main streams:First, to propose a testing framework by carefully analysing user’s needs and current situatio ...
Voir le projet

 11

 TERMINÉ 

Innovative Intelligent Rail (IN2RAIL)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Voir le projet

 56

 TERMINÉ 

ERTMS on SATELLITE – Enabling Application Validation (ERSAT EAV)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2017,

The main ERSAT EAV objective is to verify the suitability of EGNSS (including EGNOS and Galileo early services) for safety railway application, in particular in regional lines scenario, for which a safe localization of the trains, based on satellite technologies, will be defined and developed, leading the way for the harmonization with the European ERTMS standard, by implementing the solution on ...
Voir le projet

 14

 TERMINÉ 

Optimal Networks for Train Integration Management across Europe (ON-TIME)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2014,

"The aim of this project is a step-change in railway capacity by reducing delays and improving traffic fluidity. This will be achieved by a partnership between railway industry experts, system integrators, small dynamic knowledge led companies and academic researchers.There are 4 levels of work:L1: High level principles, definitions and requirements to direct researchL2: Methods and algorithms der ...
Voir le projet

 19

 TERMINÉ 
Facing the problem of enhancing the railway security with a systematic top-down approach (i.e. to search for an all-inclusive solution valid for all the conceivable threat scenarios) is judged by PROTECTRAIL members too ambitious even if it could generate potential economies of scale and effort rationalisation. The proposed PROTECTRAIL approach is therefore to split the problem of making the railw ...
Voir le projet

 31

 TERMINÉ 

Trans-Rail Integrated Goods European-Express Routes Demonstrators (TIGER DEMO)

Date du début: 1 avr. 2011, Date de fin: 31 déc. 2013,

TIGER Project developed under the 7FP addresses the issues of promoting sustainable logistics introducing innovative railway services connecting the sea ports of the European Union with the Hinterland. This is done with particular attention to the flows generated to/from the Far East and South East Asia, involving all European major Ports, suffering from traffic congestion. In particular, two Nort ...
Voir le projet

 19

 TERMINÉ 
The recent EU Commission paper on the establishment of a “Primary European Rail Freight Network” is the confirmation that Europe wants to develop a long term freight sustainable mobility.Infrastructure investments are costly and take long time to come to fruition. Hence force the need to adopt a realistic mid term strategy for developing the use of freight trains to bridge the gap up to when the ...
Voir le projet

 23

 TERMINÉ 

ERRAC Road Map

Date du début: 1 juin 2009, Date de fin: 31 juil. 2012,

ERRAC- ROADMAP covers research related to all types of freight and passenger rail services as well as their interaction with other modes within the transport system (High Speed and conventional rail over long, medium and short distances, as well as urban rail and co-modal services), the implementation of such research, and to support the various activities of the European Rail Research Advisory Co ...
Voir le projet

 21

 TERMINÉ 

INtegrated European Signalling System (INESS)

Date du début: 1 oct. 2008, Date de fin: 31 mars 2012,

"Due to the seamless guidance by rails, the railway system requires a dedicated signalling sub-system, whereby a major part of the functionality must be ensured and controlled on the infrastructure side. From a European perspective, the traditional signalling is one of the most conservative parts of the railway system strongly bound to the national traditions by all involved parties.Since 1990 the ...
Voir le projet

 31