Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Voir le projet

 31

 TERMINÉ 
PROTECT aims to introduce to the market One step antimicrobial finish processes for polymeric materials used in i) specialty textiles for public areas and hospitals, ii) water treatment membranes, and iii) implantable medical devices. Compared to main existing manufacturing routes, the proposed one-step coating technologies are simple, fast, and reproducible. For this, PROTECT uses as a starting p ...
Voir le projet

 23

 TERMINÉ 

Synthetic bacterial lipid rafts to optimize industrial bioprocesses (Rafts4Biotech)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

Genetic tractability of bacterial cells allows generating synthetic microbial chassis platforms (SMCPs) with remarkable biotechnological applications but their functionality currently faces important off-genome limitations due to deficient protein-protein interactions, unfavorable protein stoichiometry or generation of toxic intermediates that ultimately compromise the industrial production proces ...
Voir le projet

 13

 TERMINÉ 

Smart optical and ultrasound diagnostics of breast cancer (SOLUS)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2020,

SOLUS is a trans-disciplinary 48-month project bringing together 9 partners: industries (4), academic and clinical institutions from 5 countries (engineers, physicists and radiologists) representing cutting-edge expertise in their fields, to develop an innovative non-invasive, point-of-care, low-cost, easy-to-operate, multi-modal imaging system (diffuse optics and ultrasounds/shear wave elastograp ...
Voir le projet

 10

 TERMINÉ 
SUITS takes a sociotechnical approach to capacity building in Local Authorities and transport stakeholder organisations with special emphasis on the transfer of learning to smaller sized cities, making them more effective and resilient to change in the judicious implementation of sustainable transport measures. Key outputs will be a validated capacity building program for transport departments, an ...
Voir le projet

 21

 TERMINÉ 
Background The project targets a range of fauna species found in Ticino Park - 15 species listed in Annex I of the Birds Directive and Annex II, IV and V of the Habitats Directive. The park acts as a source of biodiversity for the whole Padana Plain, hosting most of the species of conservation interest related to this geographic area. Currently, it is the ...
Voir le projet

 3

 TERMINÉ 
The basic idea is to embed the waste from building demolition (fragmented bricks, fragmented plaster or concrete, fragmented glasses, machined wood from windows frame or from wood beams after demolition etc.) in a geopolymer matrix to produce prefabricated panels for different use.The main objective of InnoWEE is in fact the development of an optimized reuse of Construction and Demolition Waste (C ...
Voir le projet

 10

 TERMINÉ 
Approximately one third of all food produced globally is wasted every year throughout the whole value chain-from farmers to consumers. To extract the significant amounts of valuable compounds contained in these wastes, AgriMax will combine affordable and flexible processing technologies (ultrasound assisted and solvent extraction, filtration, thermal and enzymatic treatments) for the valorization ...
Voir le projet

 30

 TERMINÉ 
Background European countries are increasingly facing floods, water scarcity, heatwaves, prolonged droughts, unpredictable river flows, temperature rises and decreased rainfall with related impacts on vegetation. These phenomena are closely related to human development and climate change. Their impact is expected to intensify existing risks, particularly ...
Voir le projet

 9

 TERMINÉ 
The overall goal of the RE4-Project is to promote new technological solutions for the design and development of structural and non-structural pre-fabricated elements with high degree of recycled materials and reused structures from partial or total demolition of buildings. The developed technology will aim at energy efficient new construction and refurbishment, thus minimizing environmental impact ...
Voir le projet

 14

 TERMINÉ 

Safe Food and Feed through an Integrated ToolBox for Mycotoxin Management (MyToolBox)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

MyToolBox mobilises a multi-actor partnership (academia, farmers, technology SMEs, food industry and policy stakeholders) to develop novel interventions aimed at achieving a 20-90% reduction in crop losses due to fungal and mycotoxin contamination. MyToolBox will not only pursue a field-to-fork approach but will also consider safe use options of contaminated batches, such as the efficient producti ...
Voir le projet

 23

 TERMINÉ 

Innovative approach to soil management in viticultural landscapes (LIFE+ SOIL4WINE)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

Background The vineyard landscapes of North Apennines areas are affected by various soil threats, such as erosion, decline of organic matter, local and diffuse contaminations, sealing, compaction, decline in biodiversity and landslides. All these are generated by environmental factors (such as geomorphology and slopes, climate change and soil types) and b ...
Voir le projet

 5

 TERMINÉ 
Background In Europe, there is a general lack of knowledge about the diverse functions of soils, and in particular about the best available measures for their improvement and conservation. In the specific case of vineyards, which have both economic and landscape value in Europe, there are several soil management problems that are often not adequately addr ...
Voir le projet

 8

 TERMINÉ 

Magnetic DIagnostic Assay for neurodegenerative diseases (MADIA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

MADIA aims at realizing a versatile and cheap diagnostic device based on magnetoresistive sensors, microfluidic device, ultra–small Magnetic Nanoparticles (MNPs) and advanced bio-chemical functionalization methods for the early and ultrasensitive in vitro detection of biomarkers trustfully associated with 2 incurable neurodegenerative diseases: Alzheimer’s Disease (AD) and Parkinson Disease (PD). ...
Voir le projet

 10

 TERMINÉ 
To date, three way catalytic converters (TWCs) have been established as the most effective engine exhaust after-treatment system. However, TWCs not only fail to address the issue of particulate matter (PM) emissions but are also the main industrial consumer of Critical Raw Materials (CRMs) mainly Platinum Group Metals (PGMs) and Rare Earth elements (REEs), with the automotive industry accounting f ...
Voir le projet

 14

 TERMINÉ 

Driving up Reliability and Efficiency of Additive Manufacturing (DREAM)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

The aim of DREAM is to significantly improve the performances of laser Powder Bed Fusion (PBF) of titanium, aluminium and steel components in terms of speed, costs, material use and reliability, also using a LCA/LCC approach, whilst producing work pieces with controlled and significantly increased fatigue life, as well with higher strength-to-weight ratios.DREAM targets the development of a compet ...
Voir le projet

 10

 TERMINÉ 
Measurement campaigns have shown major discrepancies in buildings energy performance between planned energy demand and real energy consumption, while nowadays most of the newly constructed offices buildings are equipped with BMS systems, integrating a more or less extended measurement layer providing large amounts of data. Their integration in the building management sector offers an improvement c ...
Voir le projet

 23

 TERMINÉ 
CELBICON aims at the development, from TRL3 to TRL5, of new CO2-to-chemicals technologies, conjugating at once small-scale for an effective decentralized market penetration, high efficiency/yield, low cost, robustness, moderate operating temperatures and low maintenance costs.In line with the reference Topic text, these technologies will bridge cost-effective CO2 capture and purification from the ...
Voir le projet

 13

 TERMINÉ 

Smart Grids Energy management Staff (SMART GEMS)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

Smart grid is a dynamically interactive real-time infrastructure concept that encompasses the many visions of diverse energy system stakeholders. The Smart Grid is integrating the electrical and information technologies in between any point of generation and any point of consumption. The main objective of the project is to fully analyze all aspects of smart grids targeting in the improvement of re ...
Voir le projet

 12

 TERMINÉ 

Drones: Experiential Learning and new Training Assets

Date du début: 1 déc. 2016, Date de fin: 31 mai 2019,

The project aims at:- socializing (with case studies reconstructed for educational purposes) pupils and teachers of VET schools with drone technology, designing its integration with curricular STEM programs as teacher-led approach- co-designing with companies innovative working environments, developing the necessary resources for an open and transferable WBL for the realization of a project work “ ...
Voir le projet

 10

 TERMINÉ 
To reduce the total cost of low enthalpy geothermal systems by 20-30 % the project will improve actual drilling/installation technologies and designs of Ground Source Heat Exchangers (GSHE’s). This will be combined with an holistic approach for optimum selection, design and implementation of complete systems across different underground and climate conditions. The proposal will focus on one hand ...
Voir le projet

 17

 TERMINÉ 

Advancing Smart Optical Imaging and Sensing for Health (ASTONISH)

Date du début: 1 juin 2016, Date de fin: 31 mai 2019,

The ageing population and related increase in chronic diseases put considerable pressure on both the healthcare system and the society, resulting in an unsustainable rise of healthcare costs. As a result there is an urgent need to improve efficiency of care and reduce hospitalisation time in order to control cost and increase quality of life. Addressing this need, medical applications need to beco ...
Voir le projet

 25

 TERMINÉ 

Ultralight and ultrasafe adaptable 3-wheeler (WEEVIL)

Date du début: 1 juin 2015, Date de fin: 31 mai 2019,

L category vehicles should answer the demands for less energy consumption and affordability and represent an attractive solution in congested cities with scarce parking space. WEEVIL aims to develop a new L category 3-wheeler that is quiet, clean, energy efficient and safe, as well as attractive to the public so that the barriers for adopting it are minimized. The new vehicle concept is an ultrali ...
Voir le projet

 11

 TERMINÉ 

Enhancing Sales Capacity for Agrifood Products in Europe

Date du début: 1 sept. 2016, Date de fin: 30 avr. 2019,

The “Enhancing Sales Capacity for Agri-food Products in Europe” (ESCAPE) project aims at developing and implementing aninnovative blended learning methodology to train food technology students in sales techniques.Most graduates with Master’s degrees in business are highly skilled in sales, but very often lack technical knowledge in food areas.On the other hand, Food Science programmes mostly train ...
Voir le projet

 6

 TERMINÉ 
Background Ceramics manufacturing is one of the most energy-intensive industries. The sector is a significant contributor to greenhouse gas emissions, producing an estimated 1.84 million tonnes of CO2 globally, including 400 000 tonnes of CO2 in the EU. The LIFE ECONOMICK project fully contributes to the European Union’s climate and energy targets rel ...
Voir le projet

 3

 TERMINÉ 
Microalgae are a source of secondary metabolites useful as new bioactive compounds. Activity of these compounds against bacterial pathogens and biofilm formation has not been determined yet. Biofilm formation is especially important in infections and tissue inflammation related to implants and catheters. These problems finally cause a release of the implant, which must be removed and replaced by a ...
Voir le projet

 15

 TERMINÉ 
Background The European Union's Water Framework Directive (WFD) states that its “ultimate aim is to achieve the elimination of priority hazardous substances and contribute to achieving concentrations in the environment near background values for naturally occurring substances”. Some of these substances are synthetic organic chemicals that come from in ...
Voir le projet

 4

 TERMINÉ 
The objective of Morpheos is to create in EU a centralized open ecosystem based on consumer morphology where creative enterprises can have access to knowledge about customers expectations and need (“customization knowledge” in the following) to enhance their creativity and design processes. It will address the needs of EU creative SME manufacturers, consumers and creative web developers and entrep ...
Voir le projet

 6

 TERMINÉ 
Ageing population is steeply increasing worldwide. A consequence of age related decline is the clinical condition of frailty. Frailty is a biological syndrome of decreased reserve and resistance to stressors, resulting from cumulative declines across multiple physiologic systems and causing vulnerability to adverse outcomes. Susceptibility to stressors is influenced by biological, behavioral, env ...
Voir le projet

 9

 TERMINÉ 
The requirement for sustainable food production is a global issue to which the EU contributes as a major livestock producer. It is critical to improve animal production efficiency while sustaining environmentally friendly milk production. More profitable dairy production requires increased milk yield, cow health, longevity and fertility; reduced environmental footprint and optimised use of inputs. ...
Voir le projet

 17

 TERMINÉ 
The project SmartNet aims at providing architectures for optimized interaction between TSOs and DSOs in managing the exchange of information for monitoring and for the acquisition of ancillary services (reserve and balancing, voltage regulation, congestion management) both at national level and in a cross-border context. Local needs for ancillary services in distribution systems are supposed to co ...
Voir le projet

 22

 TERMINÉ 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2018,

Food Integrity “the state of being whole, entire, or undiminished or in perfect condition”.Providing assurance to consumers and other stakeholders about the safety, authenticity and quality of European food (integrity) is of prime importance in adding value to the European Agri-food economy. The integrity of European foods is under constant threat from fraudulently labelled imitations that try to ...
Voir le projet

 64

 TERMINÉ 
BEACONING sets a forefront in multifaceted education technologies through large-scale piloting of a digital learning platform that blend physical and digital spaces. As innovation action strategies, pilots combine opportunities for new ICTs in multiple ways that merge learning acquired in formal, non-formal and informal means, developing the skills for today’s abled and disabled learners and workf ...
Voir le projet

 15

 TERMINÉ 

Wearable Experience for Knowledge Intensive Training (WEKIT)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

OBJECTIVES: Build on multi-discipline research (e.g., human-centred methodology integrates cognitive models, ergonomics, understanding of worker’s well being) to accelerate how we identify, acquire and exploit skills valued by industry. Get high take-up by early adopters (e.g., in manufacturing). Augment training in situ with live expert guidance, a tacit learning experience and a re-enactment of ...
Voir le projet

 14

 TERMINÉ 

New Technologies for Handicraft

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

One of the most important economic sector in Europe is Crafts and small businesses, that employ more than 66% of Europe's workforce. In Europe, small enterprises and craft businesses are a prominent source of jobs and a breeding ground for business ideas. Handicrafts and Art handicraft(H&Ah) sector have a specific cultural and social value for Europe heritage and economy. H&Ah sector is facing hug ...
Voir le projet

 5

 TERMINÉ 
The World Health Organisation in its report on Neglected Tropical Diseases has stated that there is overwhelming evidence to show that the burden caused by many of the 17 diseases that affect more than 1billion people worldwide can be effectively controlled and, in many cases, eliminated or even eradicated. Leishmaniasis caused by Leishmania spp is one of them and poses a grave health risk to an e ...
Voir le projet

 9

 TERMINÉ 
In the frame of previous FP6 and FP7 projects with involvement of IZADI-NANO2INDUSTRY consortium members nanotechnologies have demonstrated their effectiveness for enhancing materials and manufacturing processes performance up to a certain level tested in intended environment (TRL 5). Different nanotechnology based strategies have been addressed to develop methods to improve thermoplastics and m ...
Voir le projet

 14

 TERMINÉ 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Voir le projet

 38

 TERMINÉ 

Training goes Global

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

Especially the extension of the European Union requires more mobility and intercultural skills than ever before. Our domestic and foreign business locations as well as the labor market itself need interculturally skilled and internationally deployable employees. At the same time participants should receive attractive development opportunities in the international labor market. Furthermore when int ...
Voir le projet

 11

 TERMINÉ 

JOSÉ MARÍA DE LLANOS-PROYECTO EUROPA V

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

Mobility project conducted by the CES Y FP 1º de Mayo (Fundación José María de Llanos). This school of Secondary Education and Vocational Training is located in the neighborhood of Entrevías-El pozo del tío Raimundo (Madrid ), one of the most depressed areas of the city .The project targets 14 students of Vocational Training from 4 professional profiles present in our center:- Electromechanical ve ...
Voir le projet

 6