Rechercher des projets européens

16 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Partir et ouvrir son regard sur les autres avec Erasmus+

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

Since many years, « Maisons Familiales Rurales” of Franche-Comté have been working on setting internships for our students and apprentices via the previous Leonardo program. It seems obvious for us to work on the new Erasmus+ project entitled “leave and open up your mind and look to the others”. We will focus on several objectives: - The acquisition of new professional practices, both technical an ...
Voir le projet

 21

 TERMINÉ 
Despite dramatic advances in molecular and imaging technologies, there are currently no effective pharmacological treatments for the core symptoms of autism spectrum disorder (ASD). Major obstructions to this include a lack of aetiologically-driven or pathophysiologically-accurate animal models; an absence of tests that indicate efficacy; and reliance of clinical trials on DSM/ICD10 categories wh ...
Voir le projet

 29

 TERMINÉ 
Cultural expression is not limited to architecture, monuments or collections of artifacts. It also includes fragile intangible live expressions, which involve knowledge and skills. Such expressions include music, dance, singing, theatre, human skills and craftsmanship.These manifestations of human intelligence and creativeness constitute our Intangible Cultural Heritage (ICH). ICH is at the same t ...
Voir le projet

 17

 TERMINÉ 

LOw COst Manufacturing and Assembly of Composite and Hybrid Structures (LOCOMACHS)

Date du début: 1 sept. 2012, Date de fin: 31 août 2016,

The continued use of composite materials in the aerospace industry has been addressed in several past research projects which have focused on new design solutions and composite manufacturing processes. However an area which has been given much less attention up until now is how to achieve a time and cost effective lean assembly production system. The current airframe assembly process of composite ...
Voir le projet

 33

 TERMINÉ 

Partir et revenir autrement

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

Since many years, « Maisons Familiales Rurales” of Franche-Comté have been working on setting internships for our students and apprentices via the Leonardo program. It seems obvious for us to work on the Erasmus+ project entitled “leave and return differently”. We will focus on several objectives: - The acquisition of new professional practices, both technical and educational. - Open-mindedness to ...
Voir le projet

 28

 TERMINÉ 

Aviation Noise Research Network and Coordination (X-NOISE EV)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2015,

The X-NOISE EV Coordination Action, through its network structure and comprehensive workplan involving experts groups, scientific workshops, international cooperation seminars and a common information system, addresses the noise challenges faced by Aviation. To this end, it will more specifically:- Evaluate EU-funded projects results and assess their contribution to the state-of-the-art.- Formulat ...
Voir le projet

 28

 TERMINÉ 

City Alternative Transport System (CATS)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2014,

The CATS project objective is the final development and experimentation of a new urban transport service based on a new generation vehicle. Its major innovation is the utilisation of a single type of vehicle for two different usages: individual use or collective transport. This new transport service is aimed at filling the gap between public mass transport and private individual vehicles. It is ba ...
Voir le projet

 12

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

MATerials TEsting and Rules (MATTER)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Voir le projet

 30

 TERMINÉ 

Virtual Biodiversity Research and Access Network for Taxonomy (ViBRANT)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2013,

Biodiversity science brings information science and technologies to bear on the data and information generated by the study of organisms, their genes, and their interactions. ViBRANT will help focus the collective output of biodiversity science, making it more transparent, accountable, and accessible. Mobilising these data will address global environmental challenges, contribute to sustainable dev ...
Voir le projet

 20

 TERMINÉ 

@qua Innovation Network for Water Efficiency (@qua)

Date du début: 1 mai 2011, Date de fin: 31 oct. 2013,

Description @qua Innovation Network gathers ICT and water services leading actors from SME to majors, research entities developing competences in both sectors, local and regional authorities directly responsible for water policy and water management. Partners have developed significant expertise about the interface of ICT and water and at th ...
Voir le projet

 17

 TERMINÉ 

Casting of Large Ti Structures (COLTS)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

"This proposal is in response to the call for EU and China collaboration on casting large Ti structures. The consortium consists of 7 EU and 7 Chinese partners. This proposal aims to make a step-change for casting of large Ti components by overcoming some key challenges in the casting process. Such a step-change is critical if the production of large Ti components is to meet the requirement in cos ...
Voir le projet

 11

 TERMINÉ 

Weather hazards for aeronautics (WEZARD)

Date du début: 1 juil. 2011, Date de fin: 30 juin 2013,

"On April 14th, 2010, the eruption of the Eyjafjallajökull volcano and the accompanying cloud of volcanic ash forced most countries in northern Europe to shut their airspace, grounding more than 100,000 flights, affected an estimated 10 million travellers and had a financial impact of 5 bn US$ over a seven day period. This event revealed to what extent our society and economy rely on the availabi ...
Voir le projet

 13

 TERMINÉ 

geoland2 - towards an operational GMES Land Monitoring Core Service (geoland2)

Date du début: 1 sept. 2008, Date de fin: 31 déc. 2012,

geoland2 intends to constitute a major step forward in the implementation of the GMES Land Monitoring Core Service (LMCS). The three components (Local, Continental and Global) of the LMCS are addressed. The goal of geoland2 is (i) to prepare, validate and demonstrate pre-operational service chains and products that will underpin the LMCS, and (ii) to propose and demonstrate a concrete functional o ...
Voir le projet

 54

 TERMINÉ 
In EU countries, volcanic risks assessment and management are tackled through scientific knowledge and monitoring, although there is still a need for integration between all risk management components. For international cooperation partner countries (ICPCs), the risk management depends on local situations but is often less favourable. Therefore, following UN International Strategy for Disaster Red ...
Voir le projet

 15

 TERMINÉ 

Transmissions in Aircraft on Unique Path wirEs (TAUPE)

Date du début: 1 sept. 2008, Date de fin: 29 févr. 2012,

"The technologies for power and data transmissions over unique path wires are strongly developed. The OPERA project made feasible High Speed/High Voltage transmissions for Power Line Communication. The U-Broad project demonstrated that Fast Ethernet (100 Mb/s) can be provided over existing telephone network cabling. But, even if these technologies have been rapidly exploited in the automotive sect ...
Voir le projet

 18