Rechercher des projets européens

9 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Accelerated Development of Vaccine benefit-risk Collaboration in Europe (ADVANCE)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2018,

Aim: The ADVANCE vision is focused on Timely and Best Evidence on Vaccine Effects. Our mission is to establish a best practice framework to rapidly provide robust data on vaccine benefits and risks to support accelerated decision-making.Approach: To achieve this vision through a public-private partnership, ADVANCE partners 1. establish common grounds and rules for collaboration between public and ...
Voir le projet

 30

 TERMINÉ 

Rational Bioactive Materials Design for Tissue Regeneration (BIODESIGN)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2016,

The development of functional materials for tissue regeneration is today mostly based on perceived and limited design criteria often using a single point approach with lengthy animal trials. The outcome after in-vitro and in-vivo evaluation is often disappointing resulting in a tedious iteration process. The main objective of this project is to achieve radical innovations in state-of-the-art bioma ...
Voir le projet

 21

 TERMINÉ 
An ideal intervention in a chronic inflammatory disease such as Rheumatoid Arthritis (RA) would be a preventive one. In order to develop preventive strategies and therapies two key developments need to occur: (1) Biomarkers need to be identified that can be used to predict an individual’s risk of developing RA. (2) Modifiable disease mechanisms need to be identified and characterized in the early ...
Voir le projet

 17

 TERMINÉ 

Portable Automated Water Analyser for Viruses (AQUAVIR)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

Water-borne viral diseases pose high risks for public health worldwide. The urban wastewater contains large number of pathogen viruses, and even the most advanced wastewater treatment is not safe for full removal of virus particles.The conventional biological water quality indicators do not provide adequate information about the presence of pathogenic viruses. The currently available reliable viru ...
Voir le projet

 14

 TERMINÉ 
Existing test standards for biomass room heating appliances (pellet and firewood stoves, and inset appliances) have supported technology development tremendously in past decades. Due to today’s changing and more demanding requirements, however, there is the obvious need for refined testing procedures in order to differentiate between poor and excellent products. Such differentiation should take in ...
Voir le projet

 15

 TERMINÉ 
AUTOGRASSMILK is a unique cooperation of SME associations representing close to 100,000 SME’s in Ireland, Denmark, The Netherlands, France, Belgium, and Sweden and the core agricultural RTD’s of these countries. AUTOGRASSMILK will analyze, develop, experiment and disseminate concepts for integrating grazing and automatic milking (AM) for dairy farms. By using a network of RTD’s, advisory connected ...
Voir le projet

 17

 TERMINÉ 

Gastro-intestinal Peptides in Obesity (GIPIO)

Date du début: 1 oct. 2008, Date de fin: 30 sept. 2012,

"Obesity is the fasted growing health problem in the Western World. In the United States, obesity as cause of preventable mortality (365,000 deaths in the year 2000) will soon overtake tobacco (435,000 deaths) and already has overtaken alcohol consumption (85,000 deaths), infectious diseases (75,000) and motor vehicle crashes (43,000). More important, it is also a problem in children and adolescen ...
Voir le projet

 7

 TERMINÉ 

Integrated system for safe transportation of children to school (SAFEWAY2SCHOOL)

Date du début: 1 sept. 2009, Date de fin: 31 août 2012,

"Between 1994 and 2001, 361 children were injured or killed during transportation to/from their school in Sweden, whereas 455 were killed or injured in Austria only in 2007 and 97 were killed in Italy in 2005. In a single school bus accident in Greece in 2003, 20 children lost their lives. Different as the above numbers may be, they all tell us one thing: Crashes involving school buses and crashes ...
Voir le projet

 16

 TERMINÉ 

CO2 Enhanced Separation and Recovery (CESAR)

Date du début: 1 févr. 2008, Date de fin: 31 mai 2011,

"CESAR aims for a breakthrough in the development of low-cost post-combustion CO2 capture technology to provide economically feasible solutions for both new power plants and retrofit of existing power plants which are responsible for the majority of all anthropogenic CO2 emissions (worldwide, approx. 5,000 power plants emit around 11 GtCO2/year). CESAR focuses on post-combustion as it is the only ...
Voir le projet

 22