Rechercher des projets européens

6 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Energy for Smart Objects (EnSO)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

The goal of EnSO is to develop and consolidate a unique European ecosystem in the field of autonomous micro energy sources (AMES) supporting Electronic European industry to develop innovative products, in particular in IoT markets. In summary, EnSO multi-KET objectives are:• Objective 1: demonstrate the competitiveness of EnSO energy solutions of the targeted Smart Society, Smart Health, and Smart ...
Voir le projet

 36

 TERMINÉ 

Bringing innovAtion by Scaling up nanoMATerials and Inks for printing (BASMATI)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The BASMATI project will address the development of active nanomaterial and electrochemical inks for printing technologies such as screen and inkjet printing. The ink formulations will be tested on a case study through printing of a thin film battery. The general objective of the project is to scale-up the ink formulations to pilot line ensuring large volume fabrication of new products with improv ...
Voir le projet

 11

 TERMINÉ 
Background The chemical and petrochemical sector is responsible for more than 30% of total industrial energy use worldwide (including feedstocks), and is by far the greatest industrial energy user. The phosphate industry is no exception. There is growing demand for phosphates, and especially polyphosphoric acid, from several sectors (pharmaceuticals, cosm ...
Voir le projet

 1

 TERMINÉ 

European Li-Ion Battery Advanced Manufacturing for Electric Vehicles (ELIBAMA)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2014,

The global objective of the ELIBAMA project is to enhance and accelerate the creation of a strong European automotive battery industry structured around industrial companies already committed to mass production of Li-ion cells and batteries for EVs. Europe faces strong competition from Asia and the USA where more investments and production capacities for Li-ion batteries currently exist. The ELIBA ...
Voir le projet

 17

 TERMINÉ 
The focus of the project is on the development of fluorinated electrolyte/separator and binders in combination with active electrodes (anode LiC6 and cathode: LiNixMn2-xO4 - 4,7V) for high performing, safe and durable Li batteries. The main deliverables of the project are the development of cell prototypes capacity > 10 A.h on which performance assessment will be conducted. The AMELIE prototype pe ...
Voir le projet

 12

 TERMINÉ 
"NEW ED aims at closing industrial water cycles and reducing the amount of waste water streams with highly concentrated salt loads stemming from a broad range of industrial production processes by exploiting the waste components (salts) and transforming them to valuable products. This will be achieved by developing new micro- to nano-porous bipolar membranes for bipolar electrodialysis (BPMED), a ...
Voir le projet

 6