Rechercher des projets européens

11 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
High deployment of fuel cells and hydrogen technologies is expected in the near term in the EU to decarbonize energy and transport sectors. The idea is to generate vast amounts of green hydrogen from the expected surplus of renewable energy sources (implemented policies are going towards 65% of electricity from renewable energy sources by 2050) to be used in transport (moving fuel cell electric ve ...
Voir le projet

 5

 TERMINÉ 

European-wide field trials for residential fuel cell micro-CHP (ENE.FIELD)

Date du début: 1 sept. 2012, Date de fin: 31 août 2017,

ene.field will deploy up to 1,000 residential fuel cell Combined Heat and Power (micro-CHP) installations, across 11 key Member States. It represents a step change in the volume of fuel cell micro-CHP (micro FC-CHP) deployment in Europe and a meaningful step towards commercialisation of the technology.The programme brings together 9 mature European micro FC-CHP manufacturers into a common analysis ...
Voir le projet

 29

 TERMINÉ 
The ECO-SEE project aims to develop new eco-materials and components for the purpose of creating both healthier and more energy efficient buildings. We will create and symbiotically use natural eco-materials for healthier indoor environments through hygrothermal (heat and moisture) regulation and the removal airborne contaminants through both chemical capture and photocatalysis. Our objectives inc ...
Voir le projet

 19

 TERMINÉ 
KnowHY aims to provide the FC&H2 sector with a training offer for technicians and workers featuring quality in contents, accessibility in format and language, practicality for the targeted audience, ease of scalability and update, and at competitive costs which make the training offer economically sustainable after project completion. Thanks to this project both OEMs as well as professionals can r ...
Voir le projet

 13

 TERMINÉ 

Fluid Management component improvement for Back up fuel cell systems (FluMaBack)

Date du début: 1 juil. 2012, Date de fin: 30 juin 2015,

The FluMaBack (Fluid Management component improvement for Back up fuel cell systems) project aims at improving the performance, life time and cost of balance of plant (BOP) components of back up fuel cell systems specifically developed to face back-out periods of around 1,000h/year for specific markets: USA, Africa and North Europe where hard operative conditions are present (high and low temperat ...
Voir le projet

 10

 TERMINÉ 

Low temperature hydrogen production from second generation biomass (HyTime)

Date du début: 1 janv. 2012, Date de fin: 30 juin 2015,

The aim of HyTime is to deliver a bioprocess for decentral H2 production from 2nd generation biomass with a productivity of 1-10 kg H2/d. The novel strategy in HyTime is to employ thermophilic bacteria which have shown superior yields in H2 production from biomass in the previous FP6 IP HYVOLUTION.Biomass in HyTime is grass, straw, molasses or unsold organic goods from supermarkets. The biomass is ...
Voir le projet

 9

 TERMINÉ 

High Performance Insulation based on Nanostructure encapsulation of air (HIPIN)

Date du début: 1 nov. 2011, Date de fin: 31 mars 2015,

The concept of High Performance Insulation Based on Nanostructured Encapsulation of Air (HIPIN), described in this proposal, is to develop a sustainable and affordable technology to produce a nanostructured thermal insulating coating to improve thermal efficiency in new and retrofitting buildings. The insulating material will have enhanced performance compared with the state of the art products an ...
Voir le projet

 10

 TERMINÉ 
"A total of 19 market-ready fuel cell systems from 2 suppliers (ElectroPS, FutureE) will be installed as UPS/ backup power sources in selected sites across the EU. Real-world customers from the telecommunications and hotel industry will utilize these fuel cell-based systems, with power levels in the 1-10kW range, in their sites. These units will demonstrate a level of technical performance (start- ...
Voir le projet

 13

 TERMINÉ 
Hospital-acquired (nosocomial) infections are a major financial issue in the European healthcare system. The financial impact of these infections counteract medical advances and expensive medical treatments by increasing the length of hospital stay by at least 8 days on average per affected patient, hence adding more than 10 millions patient days in hospitals in Europe per year. The statistics on ...
Voir le projet

 17

 TERMINÉ 
"Today’s technicians and students are the next generation of potential fuel cell users and designers, and education now is a critical step towards the widespread acceptance and implementation of hydrogen fuel cell technology in the near future.Development of training initiatives for technical professionals will be started aiming to secure the required mid- and long-term availability of human resou ...
Voir le projet

 9

 TERMINÉ 

Platform for Integration of Trans regional Energy R&D activities (PITER)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2010,

"The project aims at creating a trans-national platform to facilitate the exchanges between the members of the consortium in terms of: research, technological development and transfers, joint political and economical actions for the development and diffusion of renewable energy. This project contributes to the implementation, at a local and national level, of the European directives concerning a b ...
Voir le projet

 5