Rechercher des projets européens

28 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Background Freshwater habitats are among the most threatened habitat types globally. In the 2007-2012 conservation status assessment of the EU Habitats Directive (Article 17), none of the freshwater, coastal, and groundwater dependent wetland habitats in Europe fully met favourable conservation status, and most are in unfavourable conservation status. Alm ...
Voir le projet

 30

 TERMINÉ 

Energy Saving Lighthouse Cities in the NPA region (e-Lighthouse)

Date du début: 26 avr. 2016, Date de fin: 25 avr. 2019,

Description (EN): Project actions will support increased energy efficiency in buildings (40% of EU energy consumption) and increase the uptake of renewable energy, thus decreasing carbon dioxide emissions. Our goal is to support and follow-up the retrofit of more than 250 public buildings. In the private sector with the consultation of building supervisory authorities, the project a ...
Voir le projet

 10

 TERMINÉ 

Smart Labels for High-quality Products (SMART FISH)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

Description (EN): The core product developed in Smart-Fish is an electronic label (an electronic device printed onto a thin, flexible label) that will be put on individual food packages. Also developed, is a service for collecting and presenting data from the electronic labels.  It can be used for monitoring and tracking location and temperature of packages during transport, and the ...
Voir le projet

 5

 TERMINÉ 

Auslandspraktikum im Rahmen der Erstausbildung zum/zur Ergotherapeuten/in

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

Background Germany is the only European country in which qualification as a state-registered occupational therapist is not associated with the award of an academic title. This limits the mobility of students of occupational therapy and their career opportunities at the European level. Objectives The objective of a placement in a hospital or other institution offering occupational therapy in other ...
Voir le projet

 8

 TERMINÉ 
To accommodate for increased cross border activity and development within sustainable building technology, cooperation and business for the high north. Achievements: The project did a lot of research: two master dissertations were written on the project. It has lifted a ...
Voir le projet

 5

 TERMINÉ 

Learning Lab for Accessibility in Built Environment

Date du début: 18 janv. 2013, Date de fin: 30 déc. 2014,

Objective of the projectThe objective of the project was to improve accessibility in built environment increasing the possibilities for disabled and elderly people to manage in their daily activities and opportunities for social participation. Main activities• Survey of the accessibility competence in target areas.• Planning and implementing education modules for accessibility in built environment ...
Voir le projet

 8

 TERMINÉ 
...e of local bioenergy resources in the district heating and in small-scale combined heat and power production plants. Main activities• To plan an education program.• To organize pilot trainings in Oulu and Petrozavodsk.• To develop an automated education, training and management system for the DH plants in Russia.• To establish a Bioenergy training center.• To develop a virtual learning environment ...
Voir le projet

 4

 TERMINÉ 
... to promote the values and mechanisms of life-long learning for the professionals in the field of cultural industries and event management in the peripheral territories of the Republic of Karelia and Oulu region. Main activities• Assessment of training needs and demands.• Setting new networks for lifelong learning. • Development and organizing of in-service training courses, master-classes and sem ...
Voir le projet

 4

 TERMINÉ 

Bothnian Arc Steel & Metal Industry

Date du début: 30 juin 2001, Date de fin: 29 juin 2014,

The project aims at enhancing the competitiveness of SMEs and at ensuring their economical growth in the selected sector that is linked to the steel and metal industry as well as to the mining and energy sectors. The project also aims at identifying resources available within the industry, society and the academic world in the Bothnian Arc area and at disseminating information about their activiti ...
Voir le projet

 6

 TERMINÉ 

Sustainable Living Assistant (SuLA)

Date du début: 31 janv. 2012, Date de fin: 29 juin 2014,

The SuLA project is the vision of a home supervising service which will enable house-owners and social housing providers to provide a service that will allow householders to reduce energy use in their homes and save on energy costs for space heating. This is particularly important in the Northern Periphery region where many of the inhabitants are in a position of fuel poverty because of the harsh ...
Voir le projet

 3

 TERMINÉ 

UNELMA

Date du début: 31 mars 2012, Date de fin: 29 avr. 2014,

The project aims to develop research and analysis activities of companies operating in Northern Finland and Sweden, and to focus especially on the different imaging techniques used in materials research. The goal of this project is to disseminate information to industry on the co-applicants tangible opportunities to analyze materials, and collect data on the business needs today and to develop dif ...
Voir le projet

 5

 TERMINÉ 

Increasing Energy Efficiency in Buildings (IEEB)

Date du début: 31 juil. 2010, Date de fin: 30 juil. 2013,

The project Increasing Energy Efficiency in Buildings (IEEB) has the following objectives: 1. Technological development of low-energy solutions in housing 2. Transfer of knowledge about energy solutions to the construction industry and the society 3. Measurement techniques to decrease energy consumption in both new and existing buildings 4. Measuring the energy consumption in existing buildings th ...
Voir le projet

 7

 TERMINÉ 

Opportunities for Community groups Through Energy Storage (OCTES)

Date du début: 14 mars 2011, Date de fin: 14 mars 2013,

The project will develop a business model that can deliver a new Integrated Renewable Energy Management Service (IREMS) that can be adapted to suit local needs in a transnational context. The developed Renewable Energy Management Service incorporating smart grid technology with existing renewable energy (RE) know-how will be made available to existing advisory services across the NPP region.The co ...
Voir le projet

 6

 TERMINÉ 

Improved accessibility of the Baltic Sea Region by air transport (BALTIC BIRD)

Date du début: 8 juin 2011, Date de fin: 7 mars 2013,

Peripheral Baltic Sea regions have been characterized by depopulation and weak socio-economic conditions. These trends are contrary to the EU Strategy for the Baltic Sea Region (BSR), VASAB and the integrated territorial development of the EU (see Art. 3 (2c) of the Council Regulation (EC) No. 1083/2006 and Art. 6 (2) of Regulation (EC) No 1080/2006). Although train and ferry connections exist, on ...
Voir le projet

 21

 TERMINÉ 

Network of Expertise for Energy in Cold Climate

Date du début: 31 mars 2010, Date de fin: 30 mars 2012,

The goal is to develop the "Network of Expertise for Energy in Cold Climate" to a competitive, strong network that ensures long-term survival. The network will continuously create workshops and other venues that provide opportunities for new innovative solutions to technology development based on renewable energy can be integrated through new partnerships between SMEs, universities / schools, corp ...
Voir le projet

 7

 TERMINÉ 

Micro Waste to Energy Business: micro energy to rural enterprise 3.6 (MicrE)

Date du début: 31 déc. 2008, Date de fin: 30 déc. 2011,

MicrE will provide a service to develop and promote innovative small scale renewable energy solutions for rural SMEs and local organisations in the Northern Periphery. These solutions will use new and existing technologies which have not been tried in a rural environment before, especially those which generate energy from by-products and waste, and adapt them to suit NPP rural regions. ...
Voir le projet

 8

 TERMINÉ 

Oil analysis

Date du début: 30 sept. 2008, Date de fin: 29 avr. 2011,

Aim 1. Interdisciplinary research within the following spheres: a. Lubrication and wear of machine part with focus on particle generate. b. System for optical particle analysis. c. Built-in system for tough environment including communication. d. Interaction between human being – machine. 2. Develop a demonstration system based on results from research. 3. At least one industrial pilot installatio ...
Voir le projet

 4

 TERMINÉ 
PELLETime will develop an accessible package of tools to design sustainable pellet supply chains, thereby promoting the role of local entrepreneurs in utilising local renewable energy resources and supporting the energy self-sufficiency of northern peripheral regions. The small scale production of pellets currently faces both technological limitations, as well as lack of knowledge. The project add ...
Voir le projet

 9

 TERMINÉ 

Increasing Energy Efficiency in Buildings (IEEB) - prestudy

Date du début: 28 mai 2009, Date de fin: 29 nov. 2009,

IEEC preparatory project will create a plan for a real project to study various energy saving measurement ways, methods and equipment, to be used in buildings. By studying and comparing existing measurement methods and new mobile/wireless systems for various contruction materials the project could define best practises and recommendations for energy saving. Measurement parameters include temperatu ...
Voir le projet

 3

 TERMINÉ 

Multimodal Communication System for Health Services

Date du début: 14 avr. 2009, Date de fin: 14 oct. 2009,

Objective of this preliminary project is to make a survey of similar research in this field, what products are on the market in advanced language and communication models. How does mobile communication look like? How does user interface look like? A survey for technique state-of- the-art will be done.
Voir le projet

 3

 TERMINÉ 

Development of the European Business Advisor Training and Exchange (DEBATE)

Date du début: 31 janv. 2005, Date de fin: 30 déc. 2007,

The overall objective of DEBATE is to build a support structure for European business advisors, in order to provide them with resources and qualifications to support their clients in the modern economy and society.Further objectives are to establish a professional profile for a European Business Advisor, to create a more positive image of this profession and to develop an educational structure and ...
Voir le projet

 16

 TERMINÉ 

Training and Development Project – Northern Route to Karelia

Date du début: 31 juil. 2002, Date de fin: 30 janv. 2005,

...f 2001 to develop the tourism routes between Finland and the Republic of Karelia in a holistic manner. The goal of the Northern Route to Karelia project was to develop tourism between the Province of Oulu and the northern parts of the Republic of Karelia. The route was to begin in Oulu and travel via Kainuu, Kostomuksha, Kalevala and the Kemi regions to the Solovetski Islands and back. In particul ...
Voir le projet

 11

 TERMINÉ 
...together with Finnish and Russian companies and educational institutions. The Russian partners participated in training events and trade fairs in Finland. Teacher exchanges were carried out between Oulu University of Applied Sciences, Petrozavodsk State University and the Petrozavodsk Construction Teknikum. Basic research of the educational cooperation was completed and a foundation created for wo ...
Voir le projet

 4

 TERMINÉ 
...fore develop training and infrastructure to enable European companies to operate more innovatively and efficiently. This project is executed in partnership with: Coventry University (CEPAD), UK Oulu University of Applied Sciences, Finland, Munster University of Applied Sciences , Germany Turin Polytechnic , Italy Technical University of Delft, the Netherlands
Voir le projet

 5

 TERMINÉ 
Innovation is now a pre-requisite for competitiveness in business. Preparing new graduates for this reality is essential. 34 students from countries including Finland, Austria, Estonia, Romania, Slovenia, Bulgaria, Norway and Serbia took part in an intensive 11-day seminar in July 2007 under the Erasmus programme. The aim of the seminar was to test and validate curriculums for training in the area ...
Voir le projet

 12

 TERMINÉ 
European people are living in complex and dynamic environments. Previously used learning practices need to be adapted in order to cope with these rapid changes. Innovative solutions that promote problem-solving (e.g.in working life) are required and, in those situations, creativity plays a central role. Creativity can be applied to every domain of knowledge and must be seen as a fundamental compet ...
Voir le projet

 8

 TERMINÉ 

International Internship AGORA

Date du début: 1 janv. 2011,

Universities of the 21st Century are expected to reconsider their relationship with both the regional and global economy. Practical placement may act as an important pillar of it, as well as a multifunctional tool for improving the employability of graduates. While flexibility of course delivery and physical/virtual mobility have received quite a lot of attention, leading to widely available good ...
Voir le projet

 11

 TERMINÉ 
Voir le projet

 113