 TERMINÉ 

Innovative CO2 capture (iCap)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

In post-combustion CO2 capture, a main bottleneck causing significant reduction in power plant efficiency and preventing cost effectiveness is the low flue gas CO2 partial pressure, limiting membrane flux, solvent selection and capacity. In pre-combustion CO2 capture, key bottlenecks are number of processing steps, possible low hydrogen pressure, and high hydrogen fraction in the fuel Global deplo ...
Voir le projet

 14

 TERMINÉ 

CO2 Enhanced Separation and Recovery (CESAR)

Date du début: 1 févr. 2008, Date de fin: 31 mai 2011,

...ssed and compared with mainstream techniques to provide a fast track towards further scale-up and demonstration. CESAR unites leading organisations within the field of CO2 capture, covering the whole value chain from research institutes to end-users. The consortium consists of 3 research organizations, 3 universities, 1 solvent supplier, 1 membrane producer (SME), 3 equipment suppliers, 2 oil an ...
Voir le projet

 22