Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
IMAJINE aims to formulate new integrative policy mechanisms to enable European, national and regional government agencies to more effectively address territorial inequalities within the European Union. It responds to evidence that spatial inequalities within the EU are increasing, contrary to the principle of territorial cohesion embedded as a third dimension of the European Social Model in the Tr ...
Voir le projet

 16

 TERMINÉ 

Marine Renewable Infrastructure Network for Enhancing Technologies 2 (MARINET2)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2021,

...identifying critical areas for further technical investigation and enhancement. Whilst activities proposed under MaRINET 2 will follow the same formula, balancing networking/ joint research/ and transnational access, the consortium and scope of work is expanded to include xx partners in xx countries with xx facilities. The e-infrastructure programme fills a strategic gap. Taking stock of existing ...
Voir le projet

 39

 TERMINÉ 

Immune Response and Social Cognition in Schizophrenia (iRELaTE)

Date du début: 1 juil. 2016, Date de fin: 30 juin 2021,

Schizophrenia, affecting 0.5-1% of the population, is ranked by the World Health Organisation as more disabling than paraplegia or blindness in 18-34 year olds. Current treatments, developed over 50 years ago, are only partly effective in treating this disability, and new treatments are lacking. To address this treatment impasse, this project aims to develop and test a novel immune based model of ...
Voir le projet

 1

 TERMINÉ 
...mentary skills available at each of the hosting institutions. The inter-sectoral Network comprises 8 leading Universities, 1 public research institution, 4 companies (from spin-off to large multi-national) and 1 governmental agency. A major objective of this Network will be to exploit the fundamental research to develop novel antimicrobial treatments that have applications in the food and public h ...
Voir le projet

 14

 TERMINÉ 
The aim of this Project is to create an International and Intersectoral network to facilitate the exchange of staff to progress developments in reminding technologies for persons with dementia which can be deployed in smart environments. The focus will be on developing staff and partner skills in the areas of user centered design and behavioral science coupled with improved computational technique ...
Voir le projet

 12

 TERMINÉ 
The World Health Organisation (WHO) has included low back pain in its list of twelve priority diseases. Notably, Degenerative disc disease (DDD) presents a large, unmet medical need which results in a disabling loss of mechanical function. Today, no efficient therapy is available. Chronic cases often receive surgery, which may lead to biomechanical problems and accelerated degeneration of adjacent ...
Voir le projet

 18

 TERMINÉ 

Optical Infrared Coordination Network for Astronomy (OPTICON)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

...come a global leader in optical-near infrared astronomy through excellence in space and ground-based experimental and theoretical research. While the major infrastructures are delivered through major national and multi-national agencies (ESO, ESA) their continuing scientific competitiveness requires a strong community of scientists and technologists distributed across Europe’s nations.OPTICON has ...
Voir le projet

 34

 TERMINÉ 

Big Data Value ecosystem (BDVe)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The mission of BDVe is to support the Big Data Value PPP in realizing a vibrant data-driven EU economy or said in other words, BDVe will support the implementation of the PPP to be a SUCCESS.Behind that mission, there are multiple goals to achieve, which should be taken into full consideration when defining the directions of the PPP. Some of the most challenging ones are: (1) achieving a more comp ...
Voir le projet

 11

 TERMINÉ 

Drug Discovery and Delivery NEtwork for ONcology and Eye Therapeutics (3D NEONET)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

....The overall goal of 3D-NEONET is the improvement of available treatments for cancer and ocular disease by enhancing drug discovery-development and delivery to targeted tissues, through advanced international co-operation between academic and non-academic partners. The interdisciplinary expertise provided by 18 partners in 7 countries encompasses among others: drug screens, ADME, toxicology, precl ...
Voir le projet

 18

 TERMINÉ 

GENetic diversity exploitation for Innovative macro-ALGal biorefinery (GENIALG)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The GENIALG project aims to boost the Blue Biotechnology Economy (BBE) by increasing the production and sustainable exploitation of two high-yielding species of the EU seaweed biomass: the brown alga Saccharina latissima and the green algae Ulva spp. GENIALG will demonstrate the economic feasibility and environmental sustainability of cultivating and refining seaweed biomass in multiple use deman ...
Voir le projet

 19

 TERMINÉ 

Targeting IRE1 in disease (INSPIRED)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The overarching objective of this Interfere to Suppress or Promote IRE1 (INSPIRED) RISE programme is to drive research and innovation in cell stress and drug development for cancer and neurodegenerative diseases by forming an interdisciplinary and intersectoral network of experts with strong, dynamic and productive interactions. The partners will work together, each bringing their unique expertise ...
Voir le projet

 4

 TERMINÉ 
MedTrain is a new Industry-Academia Training, Career Development, and Mobility Fellowship Programme in Medical Device Research and Development at CÚRAM. CÚRAM, the national Centre for Research in Medical Devices, is a distributed research centre, headquartered in the National University of Ireland, Galway (NUIG), and composed of multiple academic partners from around Ireland (NUIG, University Coll ...
Voir le projet

 1

 TERMINÉ 

Frontier Research on the Dielectric Properties of Biological Tissue (BIOELECPRO)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2020,

The dielectric properties of biological tissues are of fundamental importance to the understanding of the interaction of electromagnetic fields with the human body. These properties are used to determine the safety of electronic devices, and in the design, development and refinement of electromagnetic medical imaging and therapeutic devices. Many historical studies have aimed to establish the diel ...
Voir le projet

 1

 TERMINÉ 
...of current and future academic and industrial researchers able to exploit these capabilities; 3. multidisciplinary, coordinated, top-level applied consultancy to industrial end-users (both large multinationals and SMEs). The creation and development of this infrastructure will also impact academic research by creating a training opportunity for over 300 researchers in computational science as appl ...
Voir le projet

 18

 TERMINÉ 

ACTivating InnoVative IoT smart living environments for AGEing well (ACTIVAGE)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2020,

ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Voir le projet

 50

 TERMINÉ 

Marine Ecosystem Restoration in Changing European Seas (MERCES)

Date du début: 1 juin 2016, Date de fin: 31 mai 2020,

The project MERCES is focused on the restoration of different degraded marine habitats, with the aim of: 1) assessing the potential of different technologies and approaches; 2) quantifying the returns in terms of ecosystems services and their socio-economic impacts; 3) defining the legal-policy and governance frameworks needed to optimize the effectiveness of the different restoration approaches. ...
Voir le projet

 28

 TERMINÉ 
INNOQUA will accelerate the path to market of a modular set of innovative, patent protected, award winning and scalable fully ecological sanitation solutions that address wide market needs in rural communities, for agricultural industries, for sustainable home-builders or collective housing owners and for developing countries worldwide. The modular system is based on the purification capacity of b ...
Voir le projet

 20

 TERMINÉ 
ATLAS creates a dynamic new partnership between multinational industries, SMEs, governments and academia to assess the Atlantic’s deep-sea ecosystems and Marine Genetic Resources to create the integrated and adaptive planning products needed for sustainable Blue Growth. ATLAS will gather diverse new information on sensitive Atlantic ecosystems (incl. VMEs and EBSAs) to produce a step-change in our ...
Voir le projet

 24

 TERMINÉ 

Clarifying Optimal Sodium Intake Project (COSIP)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2020,

...pressure pattern; c) determine whether the association between sodium intake and CVD varies by ethnicity, sex, age, other dietary factors (e.g. potassium intake), or other factors in 2 large international epidemiologic studies (PURE and INTERSTROKE; n>125,000 individuals). d) quantify the population-attributable fraction of excess sodium intake on global burden of CVD (stroke, myocardial infarctio ...
Voir le projet

 1

 TERMINÉ 

Preventing and mitigating farmed bivalve diseases (VIVALDI)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

The overarching goal of VIVALDI is to increase the sustainability and competitiveness of the European shellfish industry by improving the understanding of bivalve diseases and by developing innovative solutions and tools for the prevention, control and mitigation of the major pathogens affecting the main European farmed shellfish species: Pacific oyster (Crassostrea gigas), mussels (Mytilus edulis ...
Voir le projet

 21

 TERMINÉ 
ADAS&ME (“Adaptive ADAS to support incapacitated drivers &Mitigate Effectively risks through tailor made HMI under automation”) will develop adapted Advanced Driver Assistance Systems, that incorporate driver/rider state, situational/environmental context, and adaptive interaction to automatically transfer control between vehicle and driver/rider and thus ensure safer and more efficient road usage ...
Voir le projet

 30

 TERMINÉ 
Using the clinical and signal data (cardiac and respiratory traces, video quantification of movement and sound) from a large cohort of hospitalised newborn and pregnant women recordings Digi-NewB aims to propose a new decision support system (DSS). This DSS will assist the clinician in his decision-making through non-invasive monitoring of sepsis risk and of cardio-respiratory and neurobehavioral ...
Voir le projet

 8

 TERMINÉ 

Sexual Plant Reproduction – Seed formation (SexSeed)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

...tion factor, which is the master regulator in the production of seeds. The objective of this proposal is to strengthen research partnerships through staff exchanges and networking activities, at international and intercontinental levels. By combining transcriptomic and genetic approaches, we aim to uncover new functions for STK targets and implicate them in putative signalling cascades, increasing ...
Voir le projet

 4

 TERMINÉ 

Climate change and European aquatic RESources (CERES)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

CERES advances a cause-and-effect understanding of how future climate change will influence Europe’s most important fish and shellfish populations, their habitats, and the economic activities dependent on these species. CERES will involve and closely cooperate with industry and policy stakeholders to define policy, environment, social, technological, law and environmental climate change scenarios ...
Voir le projet

 26

 TERMINÉ 
Tendon Therapy Train is a research, training and innovation programme for human and equine tendon repair and regeneration that will exploit recent advancements in tissue engineering by self-assembly (TESA) technologies which have led to the clinical translation and commercialisation of advanced therapy medicinal products (ATMPs). Although TESA therapies have the potential to revolutionise healthc ...
Voir le projet

 9

 TERMINÉ 

Translating neuroimaging findings from research into clinical practice (PSYSCAN)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2020,

Abstract 9Neuroimaging (NI) has enormous potential to improve the clinical care of patients with psychiatric disorders, but has yet to deliver. The PSYSCAN project will address this issue directly by developing a NI-based tool that will help clinicians resolve key clinical issues in the management of patients with psychotic disorders. Clinicians will use the tool to assess patients with a standard ...
Voir le projet

 24

 TERMINÉ 

ACTRIS PPP - Aerosols, Clouds and Trace gases Preparatory Phase Project (ACTRIS PPP)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

... of aerosols, clouds, and trace gases and for understanding of the related atmospheric processes, to provide RI services to wide user groups. ACTRIS is composed of 8 connected elements: distributed National Facilities (observation platforms and exploratory platforms) both in Europe and globally, and 7 Central Facilities (Head Office, Data Centre and 5 Calibration Centres). ACTRIS provides access t ...
Voir le projet

 28

 TERMINÉ 

Exploiting Protein Complexes that Induce Cell-death (EPIC)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

... knowledge from outside the EU to benefit EU-based research. Establishment of EPIC through RISE will generate lead molecules with demonstrable utility and knowledge that will underpin applications to national funding agencies to sustain the communal effort beyond the life of the RISE award. It will also generate intellectual property that will enable the network to approach biotech and pharma to f ...
Voir le projet

 5

 TERMINÉ 
BrainMatTrain focuses on a comprehensive understanding of Parkinson’s disease (PD), from basics to translation, fully supported by 8 full partners partner organisation (4 research institutions, 2 hospitals, 2 SMEs) and one partner organisation (SME specialist in device design). This ETN will educate and train 15 Earlty Stage Researchers (ESRs) in functioanlised biomaterials, materials science, fun ...
Voir le projet

 8

 TERMINÉ 
...perability and standards approaches at technical and semantic levels for object connectivity, protocols, data formats, privacy, security, trusted IoT, open APIs and share the road-mapping with international initiatives. The project will foster the exchange on requirements for legal accompanying measures, development of common methodologies and KPI for design, testing and validation and for succes ...
Voir le projet

 20

 TERMINÉ 
Considerable challenges remain today regarding Europe´s transition towards a decarbonised energy system that meets the economic and social needs of its citizens. Rebound effects, that is, a full or partial cancelling-out of efficiency gains over time through increased overall energy use, highlight the centrality of consumption in multi-scalar decarbonisation efforts, urgently requiring attention f ...
Voir le projet

 10

 TERMINÉ 

Endoplasmic Reticulum Stress in Health and Disease (TRAIN-ERS)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2019,

...for the treatment of ER stress-associated diseases. The TRAIN-ERS network will provide early stage researchers (ESRs) with high quality scientific and complementary skills training combined with international, intersectoral work experience. This will produce highly trained, innovative, creative and entrepreneurial ESRs with greatly enhanced career prospects, who will continue to advance the state ...
Voir le projet

 12

 TERMINÉ 

Making Internationalisation a Reality for Occupational Therapy Students

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

... therapists and evaluate these outcomes to demonstrate how working with ‘real’ projects in a contextualised manner which engages students differently develops their understanding. 2. Use the international community to strengthen and deepen professional identity to encourage students to work confidently with an occupationally focused approach. This unique approach aims to bring about transformation ...
Voir le projet

 3

 TERMINÉ 
Decoding the Disciplines in European Institutions of Higher Education: Interdisciplinary and Inter-Cultural Approach to Teaching and Learning is a transnational project that aims at introducing to European institutions of higher education a set of innovative teaching tools that will help European professors to integrate students of immigrant and refugee background into the European educational sys ...
Voir le projet

 5

 TERMINÉ 

Excellence in SImulation of Weather and Climate in Europe (ESiWACE)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

ESiWACE will substantially improve efficiency and productivity of numerical weather and climate simulation on high-performance computing platforms by supporting the end-to-end workflow of global Earth system modelling in HPC environment. This will be obtained by improving and supporting (1) scalability of models, tools and data management on state-of-the-art supercomputer systems (2) Usability of ...
Voir le projet

 16

 TERMINÉ 

New generation of Intelligent Efficient District Cooling systems (INDIGO)

Date du début: 1 mars 2016, Date de fin: 31 août 2019,

In Europe, different prognosis show an increase in cooling demand of almost 60% in 2030 with respect to nowadays. District cooling (DC) can play a part in satisfying this demand in a sustainable way (since can offer 5 to 10 times higher efficiency solutions than on‐site stand‐alone distributed systems). Even if DC captures only minor portion of the prospective market, this will translate into a dr ...
Voir le projet

 6

 TERMINÉ 
Measurement campaigns have shown major discrepancies in buildings energy performance between planned energy demand and real energy consumption, while nowadays most of the newly constructed offices buildings are equipped with BMS systems, integrating a more or less extended measurement layer providing large amounts of data. Their integration in the building management sector offers an improvement c ...
Voir le projet

 23

 TERMINÉ 

Remotely Operated CBRNe Scene Assessment Forensic Examination (ROCSAFE)

Date du début: 1 juil. 2016, Date de fin: 30 juin 2019,

The overall goal of ROCSAFE is to fundamentally change how CBRNe events are assessed, in order to and ensure the safety of crime scene investigators by reducing the need for them to enter high-risk scenes when they have to determine the nature of threats and gather forensics. For this, ROCSAFE will make use of cost-effective modern remotely-controlled robotic air and ground vehicles (RAVs/RGVs) th ...
Voir le projet

 14

 TERMINÉ 

Transforming Transport (TT)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Voir le projet

 48

 TERMINÉ 
The centrosome is the major microtubule-organizing centre of a cell. It also serves as the base for the primary cilium, an antenna-like structure that allows cells to respond to external stimuli. Around the centrosome lie a number of electron dense cytoplasmic granules, termed centriolar satellites. These are involved in protein trafficking and are crucial for normal centrosome and cilium assembly ...
Voir le projet

 1