Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The GeoERA proposal is put forward by the national and regional Geological Survey Organisations (GSO) of Europe. Its overall goal is to integrate the GSO’s information and knowledge on subsurface energy, water and raw material resources, to support sustainable use of the subsurface in addressing Europe’s grand challenges. The GeoERA consortium will organise and co-fund together with the EC a joint ...
Voir le projet

 45

 TERMINÉ 
The vision of EU-ToxRisk is to drive a paradigm shift in toxicology towards an animal-free, mechanism-based integrated approach to chemical safety assessment. The project will unite all relevant disciplines and stakeholders to establish: i) pragmatic, solid read-across procedures incorporating mechanistic and toxicokinetic knowledge; and ii) ab initio hazard and risk assessment strategies of chemi ...
Voir le projet

 43

 TERMINÉ 
The RUGGEDISED project will create urban spaces powered by secure, affordable and clean energy, smart electro-mobility, smart tools and services. The overall aims are:1. Improving the quality of life of the citizens, by offering the citizens a clean, safe, attractive, inclusive and affordable living environment.2. Reducing the environmental impacts of activities, by achieving a significant reducti ...
Voir le projet

 34

 TERMINÉ 

Optomechanics for Virology (VIRUSCAN)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2021,

Viral infections diagnosis demands novel, cheaper and rapid technologies to overcome present constraints. Current gold standard for diagnosis of viral infections is based on pathogen-targeted nucleic acid identification; thus, it cannot discern infectious stages from latent ones and it demands time consuming adjustments when mutations occur or new emerging viruses are to be included in the diagnos ...
Voir le projet

 10

 TERMINÉ 

RECAP: Research on European Children and Adults born Preterm (RECAP)

Date du début: 1 janv. 2017, Date de fin: 31 mars 2021,

The project’s overall aim is to improve the health, development and quality of life of children and adults born very preterm (VPT, < 32 weeks of gestation) or very low birth weight (VLBW, < 1500g) – approximately 50 000 births each year in Europe – by establishing an ICT platform to integrate, harmonise and exploit the wealth of data from 20 European cohorts of VPT/VLBW children and adults and the ...
Voir le projet

 21

 TERMINÉ 

PRevention Of Malnutrition In Senior Subjects in the EU (PROMISS)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2021,

PROMISS (PRevention Of Malnutrition In Senior Subjects in the EU) is a multi-country project aiming to turn the challenge of tackling malnutrition in community-dwelling older persons into an opportunity for healthy ageing for the future. The PROMISS consortium contains worldwide expertise in epidemiology, clinical trials, geriatrics, nutrition, physical activity, microbiomics, as well as in behavi ...
Voir le projet

 24

 TERMINÉ 
The EU28 imports 77% of the protein it requires, for food or feed, representing an important vulnerability for our economy, risking our self-sufficiency and food security. Food waste is a top issue, representing losses costing €442/ton of produced food material, plus environmental and ethical problems in EU.GreenProtein aims at a major innovation for these two needs by producing high-added value, ...
Voir le projet

 9

 TERMINÉ 

Optical Infrared Coordination Network for Astronomy (OPTICON)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

Europe has become a global leader in optical-near infrared astronomy through excellence in space and ground-based experimental and theoretical research. While the major infrastructures are delivered through major national and multi-national agencies (ESO, ESA) their continuing scientific competitiveness requires a strong community of scientists and technologists distributed across Europe’s nations ...
Voir le projet

 34

 TERMINÉ 
Environmental heating is a growing challenge for our community and problems are already experienced by millions of Europeans during the summertime and aggravated during heat waves or occupational settings. In addition to the well-known health risks related to severe heat stress, a number of studies have confirmed significant loss of productivity due to hyperthermia. Even if countries adopt the EU ...
Voir le projet

 21

 TERMINÉ 

Big Data Value ecosystem (BDVe)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The mission of BDVe is to support the Big Data Value PPP in realizing a vibrant data-driven EU economy or said in other words, BDVe will support the implementation of the PPP to be a SUCCESS.Behind that mission, there are multiple goals to achieve, which should be taken into full consideration when defining the directions of the PPP. Some of the most challenging ones are: (1) achieving a more comp ...
Voir le projet

 11

 TERMINÉ 

Multi-modal Optical Diagnostics for Ocular and Neurodegenerative Disease (MOON)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2020,

The rising life expectancy of EU citizens is creating a dramatic increase in age-related degenerative diseases and associated healthcare costs. The MOON Project (Multi-modal Optical Diagnostics for Ocular and Neurodegenerative Disease) meets this societal challenge by applying photonics to diagnose age-related diseases of the eye and central nervous system. Consistent with the ICT-29-2016: Photoni ...
Voir le projet

 6

 TERMINÉ 
The ORCA Project proposal addresses topic GV-03-2016, of the Transport Work Programme. The work proposed will, in a single coordinated project, address all the aspects of the domain 2 “For pure and plug-in hybrids, power-train system integration and optimisation through the re-use of waste heat, advanced control, downsizing of ICEs, innovative transmissions and the integration of electronic compon ...
Voir le projet

 11

 TERMINÉ 

HOLIstic optimisation of SHIP design and operation for life cycle (HOLISHIP)

Date du début: 1 sept. 2016, Date de fin: 31 août 2020,

Most maritime products are typically associated with large investments and are seldom built in large series. Where other modes of transport benefit from the economy of series production, this is not the case for maritime products which are typically designed to refined customer requirements increasingly determined by the need for high efficiency, flexibility and low environmental impact at a compe ...
Voir le projet

 39

 TERMINÉ 

ENabling Onshore CO2 Storage in Europe (ENOS)

Date du début: 1 sept. 2016, Date de fin: 31 août 2020,

To meet the ambitious EC target of an 80% reduction in greenhouse gas emissions by 2050, CO2 Capture and Storage (CCS) needs to move rapidly towards full scale implementation with geological storage solutions both on and offshore. Onshore storage offers increased flexibility and reduced infrastructure and monitoring costs. Enabling onshore storage will support management of decarbonisation strateg ...
Voir le projet

 20

 TERMINÉ 
HORSE aims to bring a leap forward in the manufacturing industry proposing a new flexible model of smart factory involving collaboration of humans, robots, AGV’s (Autonomous Guided Vehicles) and machinery to realize industrial tasks in an efficient manner. HORSE proposes to foster technology deployment towards SMEs by developing a methodological and technical framework for easy adaptation of robot ...
Voir le projet

 15

 TERMINÉ 
The target of this project is to prepare and train future engineers for the design challenges and opportunities provided by modern optics technology. Such challenges include lossless photon management, modelling at the system, components and feature level, and the link between design and technology. Today all optical designs are often perceived following different approaches, namely geometrical op ...
Voir le projet

 13

 TERMINÉ 

Demonstration of soft stimulation treatments of geothermal reservoirs (DESTRESS)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

DESTRESS is aimed at creating EGS (Enhanced geothermal systems) reservoirs with sufficient permeability, fracture orientation and spacing for economic use of underground heat. The concepts are based on experience in previous projects, on scientific progress and developments in other fields, mainly the oil & gas sector. Recently developed stimulation methods will be adapted to geothermal needs, app ...
Voir le projet

 16

 TERMINÉ 

Analysis System for Gathered Raw Data (ASGARD)

Date du début: 1 sept. 2016, Date de fin: 29 févr. 2020,

ASGARD has a singular goal, contribute to Law Enforcement Agencies Technological Autonomy and effective use of technology. Technologies will be transferred to end users under an open source scheme focusing on Forensics, Intelligence and Foresight (Intelligence led prevention and anticipation). ASGARD will drive progress in the processing of seized data, availability of massive amounts of data and ...
Voir le projet

 34

 TERMINÉ 
Five DSOs (CEZ distribuce, ERDF, EON, Enexis, Avacon) associated with power system manufacturers, electricity retailers and power system experts, propose a set of six demonstrations for 12 to 24 months. Within three years, they aim at validating the enabling role of DSOs in calling for flexibility sources according to local, time-varying merit orders. Demonstrations are designed to run 18 separat ...
Voir le projet

 20

 TERMINÉ 

Advanced Low Flying Aircrafts Detection and Tracking (ALFA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The last decades witnessed the ever growing effectiveness of Europe-subsidized border protection projects like SIVE and SIVICC. As maritime smuggling from Morocco towards the European borders of Portugal and Spain was combatted more effectively, the criminal modus operandi changed drastically, approaching air routes with cheap and small planes. New drone technology opens opportunity to both manned ...
Voir le projet

 9

 TERMINÉ 
The InSCOPE project will set-up an open access pilot line service for Hybrid TOLAE (H-TOLAE) technologies capable of sampling products at TRL6-7. It positions itself in between R&D and industry and deploys a service for validating potential H-TOLAE products. Manufacturing progresses beyond R&D level (TRL5 towards 6) by improving processes, functionality and reliability allowing sampling at high qu ...
Voir le projet

 14

 TERMINÉ 

Capacitive Identification Tokens (CAPID)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

Almost every person in Europe now has access to a connected touch device and the creation of new capacitive sensing devices has become easy and cost effective. Building on this, the CAPID project wants to develop ‘c-tokens’, that interact with these touchscreen and capacitive readers. C-tokens are thin and flexible, metal-oxide tags, integrated in paper and plastic products. The tags will send a d ...
Voir le projet

 7

 TERMINÉ 
ICT is embedded and pervasive into our daily lives. The notion of Cyber Physical Systems (CPS) has emerged: embedded computational collaborating devices, capable of controlling physical elements and responding to humans.The Cross-layer modEl-based fRamework for multi-oBjective dEsign of Reconfigurable systems in unceRtain hybRid envirOnments (CERBERO) project aims at developing a design environmen ...
Voir le projet

 12

 TERMINÉ 

Physical Activity and Nutrition INfluences In ageing (PANINI)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

Life expectancy is increasing dramatically, but the period of good health (healthspan) enjoyed by most is not keeping pace, with implications for health, social care, and pensions resulting in estimated costs more than doubling by 2050. Thus, understanding the many factors that contribute to healthy ageing versus frailty, and validating interventions and influencing policy to promote healthy agein ...
Voir le projet

 8

 TERMINÉ 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Voir le projet

 43

 TERMINÉ 

Energy for Smart Objects (EnSO)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

The goal of EnSO is to develop and consolidate a unique European ecosystem in the field of autonomous micro energy sources (AMES) supporting Electronic European industry to develop innovative products, in particular in IoT markets. In summary, EnSO multi-KET objectives are:• Objective 1: demonstrate the competitiveness of EnSO energy solutions of the targeted Smart Society, Smart Health, and Smart ...
Voir le projet

 36

 TERMINÉ 
From government to consumer applications, personal identification is an ever increasing concern and demand. Fingerprints are the oldest and the most reliable features to be used because of their singularity and inalterability. The main goal of the PYCSEL project is to develop a low cost thin and large area fingerprint sensing surface enabling the personal identification via the development of a TO ...
Voir le projet

 9

 TERMINÉ 
Advanced aRchitectures for ultra-thin high-efficiency CIGS solar cells with high Manufacturability (ARCIGS-M)This project´s goal is advanced materials and nanotechnologies for novel CIGS PV device architectures with efficiencies ≥ 23.0 %, thus beyond that of the current state-of-the-art technologies. The technology targets the BIPV sector and enables several innovative solutions for BIPV.The novel ...
Voir le projet

 15

 TERMINÉ 
The objective of the caLIBRAte project is to establish a state-of-the-art versatile Risk Governance framework for assessment and management of human and environmental risks of MN and MN-enabled products. The framework will be a web-based “system-of-systems” linking different models and methods for: 1) screening of apparent and perceived risks and trends in nanotechnology, 2) control banding, quali ...
Voir le projet

 26

 TERMINÉ 

High Performance Laser-based Additive Manufacturing (HIPERLAM)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

HIPERLAM is an SME driven Research and Innovation Action (RIA) well-aligned to the Factories of the Future (FoF) Initiative with a strong emphasis upon demonstrating superior cost and speed performance in end-to-end processes featuring laser-based additive manufacturing in two key applications requiring high resolution printed conductive metallic lines, namely laser printed RFID antenna and laser ...
Voir le projet

 8

 TERMINÉ 
A significant challenge to ensuring sustainable production and use of nanotechnologies is to understand safety and health risks of the technology and its end-products, and to implement practical strategies to manage these risks. Knowledge is growing rapidly, but effective use of this knowledge for risk management is lagging behind. We therefore need to bridge the gap between knowledge on hazard an ...
Voir le projet

 17

 TERMINÉ 
The GEMex project is a complementary effort of a European consortium with a corresponding consortium from Mexico, who submitted an equivalent proposal for cooperation. The joint effort is based on three pillars: 1 – Resource assessment at two unconventional geothermal sites, for EGS development at Acoculco and for a super-hot resource near Los Humeros. This part will focus on understanding the tec ...
Voir le projet

 26

 TERMINÉ 

Nanomaterial FAte and Speciation in the Environment (NanoFASE)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

Concept: NanoFASE will deliver an integrated Exposure Assessment Framework, including methods, parameter values, model and guidance that will allow Industry to assess the full diversity of industrial nano-enabled products to a standard acceptable in regulatory registrations. Methods to assess how use phases, waste streams and environmental compartments (air, soil, water biota) act as “reactors” in ...
Voir le projet

 39

 TERMINÉ 

Interfaces in opto-electronic thin film multilayer devices (INFORM)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

Development of new materials over the past decade paved the way for organic/hybrid electronics into commercial applications. Now, perfection of material interfaces in organic/hybrid thin-film devices is key to drive the technology further and enable new, more advanced applications. INFORM offers a paradigm shift from focusing on materials to focusing on devices by probing, modelling and controllin ...
Voir le projet

 11

 TERMINÉ 
Within the project SURE (Novel Productivity Enhancement Concept for a Sustainable Utilization of a Geothermal Resource) the radial water jet drilling (RJD) technology will be investigated and tested as a method to increase inflow into insufficiently producing geothermal wells. Radial water jet drilling uses the power of a focused jet of fluids, applied to a rock through a coil inserted in an exist ...
Voir le projet

 11

 TERMINÉ 

Industrial scenarios for connected factories (ConnectedFactories)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

There is a consensus among industry and policymakers that Europe is currently in the middle of an industrial revolution initiated by the digitisation of industrial processes. Cyber Physical Systems (CPS), the Industrial Internet and the Internet of Things (IoT) connect people, devices, machines and enterprises like never before. For many years companies and research organisations have been address ...
Voir le projet

 16

 TERMINÉ 
The main objective of POWER2DM is to develop and validate a personalized self-management support system (SMSS) for T1 and T2 diabetes patients that combines and integrates (1) a decision support system (DSS) based on leading European predictive personalized models for diabetes interlinked with predictive computer models, (2) automated e-coaching functionalities based on Behavioural Change Theories ...
Voir le projet

 8

 TERMINÉ 

Breakthrough solutions for adaptable envelopes for building refurbishment (BRESAER)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2019,

The overall objective of BRESAER project is to design, develop and demonstrate an innovative, cost-effective, adaptable and industrialized envelope system for buildings refurbishment including combined active and passive pre-fabricated solutions integrated in a versatile lightweight structural mesh:‒ Dynamic window with automatic and controlled air-tightness and insulated solar blinds complementin ...
Voir le projet

 17

 TERMINÉ 

Joining Efforts for Responsible Research and Innovation (JERRI)

Date du début: 1 juin 2016, Date de fin: 31 mai 2019,

The goal of the project is to foster RRI transition in Europe by developing and testing good RRI practices in pilot cases, for a further upscaling among the RTOs in the EU28. A Responsible Research and Innovation (RRI) Plan will be developed and implemented at the biggest European RTOs, the Fraunhofer-Gesellschaft and TNO, covering the five RRI key dimensions (societal engagement, gender equality ...
Voir le projet

 5

 TERMINÉ 
"The BuyZET project will develop innovative procurement plans to help the participating cities achieve their goals of zero emission urban delivery of goods and services.The core cities in the project - Rotterdam, Oslo and Copenhagen - will first identify which goods and service procurement areas have the highest "transportation footprint" - i.e. the number of motorised vehicle trips to transport g ...
Voir le projet

 8