Rechercher des projets européens

4 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Improvement of Express Passenger Train "Vilnius-Minsk" (PT VM)

Date du début: 30 nov. 2013, Date de fin: 29 avr. 2015,

PROBLEM: Every month about 7000 passengers are going to both directions Belarus and Lithuania. Traveling time from Vilnius to Minsk (or vice versa) by train is 4 to 5 hours. This is caused by inconvenient and long lasting customs control procedures. To overcome this lack of competitiveness there is a need for improvement, interoperability and integration of transport systems of both Lithuania and ...
Voir le projet

 3

 TERMINÉ 
The overall objective of the project is to contribute to improvement of traffic conditions of the IA Pan-European Transport Corridor by improving the conditions for transit and long distance traffic and reducing the problems caused by the traffic with which inhabitants of Panemune settlement (Lithuania) and Sovetsk town (Russia) are encountering. ...
Voir le projet

 2

 TERMINÉ 
The Trans-European railway Rail Baltica, linking Helsinki – Tallinn – Riga – Kaunas – Warsaw and continuing on to Berlin, is to be developed within the territories of the co-operating EU Member States.The Interreg IIIB project Rail Baltica had two main goals: (a) the definition of the most favourable route for the Rail Baltica railway link in terms of spatial planning and regional development, and ...
Voir le projet

 23

 TERMINÉ 
The infrastructure and conditions for the border checking at the Švendubrė-Privalka state border river crossing point (Lithuania-Belarus) are poor and insufficient; the state border protection during the out-of-season period and at night is not ensured. This negatively affects the travelling persons flow and the Lithuanian-Belarusian cross-border cooperation. The project aims at improving (creatin ...
Voir le projet

 3