Rechercher des projets européens

14 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2018,

Food Integrity “the state of being whole, entire, or undiminished or in perfect condition”.Providing assurance to consumers and other stakeholders about the safety, authenticity and quality of European food (integrity) is of prime importance in adding value to the European Agri-food economy. The integrity of European foods is under constant threat from fraudulently labelled imitations that try to ...
Voir le projet

 64

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Voir le projet

 116

 TERMINÉ 

AIRBorne information for Emergency situation Awareness and Monitoring (AIRBEAM)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

The AIRBEAM project proposes a situation awareness toolbox for the management of crisis over wide area taking benefit of an optimised set of aerial (unmanned) platforms, including satellites.The number of unmanned air- and space-borne platform available and their associated sensors present a new set of challenges to end users involved in the effective management of emergencies and actions of law e ...
Voir le projet

 24

 TERMINÉ 
Unprecedented growth in the accessibility of imaging data of persons with brain diseases has led to the development of computational infrastructures offering scientists access to image databases and e-Science services. FP7 neuGRID is the leading e-Infrastructure where neuroscientists can find core services and resources for brain image analysis. "neuGRID for Users" (N4U) will provide an e-Science ...
Voir le projet

 14

 TERMINÉ 

Intelligent Fault Correction and self Optimizing Manufacturing systems (IFaCOM)

Date du début: 1 nov. 2011, Date de fin: 30 avr. 2015,

The goal of zero defect manufacturing encompasses both short and long term perspectives. The short term perspective is to develop and implement a real time process control system that eliminates the production of any faulty component due to variances in materials, components and process properties. The long term perspective is to minimize all failures by continuous optimizing of the production pro ...
Voir le projet

 15

 TERMINÉ 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Voir le projet

 44

 TERMINÉ 
We propose to develop new strategies to mobilize skeletal muscle tissue-associated stem cells as a tool for efficient tissue repair. This will be combined with exploring novel approaches that limit tissue damage, and will focus on agents that modify muscle and muscle vasculature progenitor cells. These molecules include nitric oxide associated with non-steroidal anti-inflammatory drugs, HMGB1, Cri ...
Voir le projet

 22

 TERMINÉ 

Seismic-Initiated events risk mitigation in LEad-cooled Reactors (SILER)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

"SILER is a Project aimed at studying the risk associated to seismic initiated events in Generation IV Heavy Liquid Metal reactors and developing adequate protection measures.The attention is focused on the evaluation of the effects of earthquakes (with particular regards to beyond design seismic events and tsunamis) and to the identification of mitigation strategies, acting both on structures/com ...
Voir le projet

 18

 TERMINÉ 

POWERtrain for FUture Light-duty vehicles (POWERFUL)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2014,

"The Project aims to develop new powertrain concepts able to give a substantial contribution to the achievement of a 50% CO2 reduction (based on 2005 figures) for passenger cars and light-duty vehicles for the new vehicle fleet in 2020. In particular, the research target on spark ignited (SI) engines powered vehicles is to achieve 40% lower CO2 emissions with respect to the 2005 values and 20% low ...
Voir le projet

 18

 TERMINÉ 

Novel tree breeding strategies (NOVELTREE)

Date du début: 1 mai 2008, Date de fin: 31 oct. 2012,

"The challenges facing forest geneticists and tree breeders include recognition of changing demands on forests for a wider range of high value forest products and sustainability of forest ecosystems under climate change. NOVELTREE is designed to enable significant genetic improvement of tree characteristics and forest products properties to satisfy the needs (quality, quantity, sustainability, vul ...
Voir le projet

 16

 TERMINÉ 

Services and Applications For Emergency Response (SAFER)

Date du début: 1 janv. 2009, Date de fin: 31 mars 2012,

"SAFER aims at implementing preoperational versions of the Emergency Response Core Service. SAFER will reinforce European capacity to respond to emergency situations: fires, floods, earthquakes, volcanic eruptions, landslides, humanitarian crisis. The main goal is the upgrade of the core service and the validation of its performance with 2 priorities: First priority is the short term improvement o ...
Voir le projet

 57

 TERMINÉ 

MEMS ATOMIC CLOCKS FOR TIMING, FREQUENCY CONTROL AND COMMUNICATIONS (MAC-TFC)

Date du début: 1 sept. 2008, Date de fin: 29 févr. 2012,

Atomic clocks provide enhanced accuracy, stability, and timing precision compared to quartz-based technologies. However, the size and power consumption of existing atomic clocks far exceeds that those of quartz-based clocks, not preventing their deployment in portable applications.The goal of the MAC-TFC proposal is to develop and demonstrate all the necessary technology to achieve an ultra-miniat ...
Voir le projet

 12

 TERMINÉ 
According to recent studies, Risks Against Patient Safety (RAPS) represent one of the most important factors of dead in hospitals: during therapy, more then 8% of patients recovered in hospitals suffer for additional disease that in almost 50% of the cases produce either dead or significant additional health problems. RAPS occur in any stage of the patient care process.REMINE project idea origina ...
Voir le projet

 18

 TERMINÉ 

Integrated synthesis and purification of single enantiomers (INTENANT)

Date du début: 1 juin 2008, Date de fin: 31 mai 2011,

Several industries have an increasing interest in improving their access to pure single enantiomers of biologically active substances. The latter often form the basis for valued added products relevant for, among others, the pharmaceutical, cosmetic, and food industries. Up to now there exist two generally rivalling concepts for producing pure enantiomers. One approach is based on developing and a ...
Voir le projet

 11