Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Accelerated Development of Vaccine benefit-risk Collaboration in Europe (ADVANCE)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2018,

Aim: The ADVANCE vision is focused on Timely and Best Evidence on Vaccine Effects. Our mission is to establish a best practice framework to rapidly provide robust data on vaccine benefits and risks to support accelerated decision-making.Approach: To achieve this vision through a public-private partnership, ADVANCE partners 1. establish common grounds and rules for collaboration between public and ...
Voir le projet

 30

 TERMINÉ 

Chromatin in Plants – European Training and Mobility (CHIP-ET)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

"The Research Training Network CHIP-ET will focus on the study of protein complexes that modulate chromatin structure to activate RNA polymerase II–mediated transcription. Research will address how developmental and environmental stimuli such as light and circadian rhythm signal to these complexes to modulate transcription. The interactome of the complexes will be determined, as well as their geno ...
Voir le projet

 6

 TERMINÉ 
"The YEASTCELL ITN will train 11 Early Stage Researchers for productive careers as research scientists and leaders in the public or private yeast biotechnology sectors. Yeast biotechnology spans fundamental and applied research and is an area with an immediate need for highly trained researchers to advance knowledge and to develop new applications. The training consortium comprises 9 Public Sector ...
Voir le projet

 13

 TERMINÉ 
STREAMER is an industry-driven collaborative research project on Energy-efficient Buildings (EeB) with cases of mixed-use healthcare districts. Such districts are the best real examples of neighbourhood with integrated energy system consisting of mixed building types (i.e. hospitals and clinics; offices and retails; laboratories and educational buildings; temporary care homes, rehabilitation and s ...
Voir le projet

 20

 TERMINÉ 
"The main objective of NATURTRUCK is to develop injected plastic parts for the commercial vehicles industry (mainly cabin truck parts) made with thermoplastic composite materials from renewable resources (at least 80% w/w), namely physically modified polylactic acid (PLA) grades and natural fibres, with improved thermal and flame retardancy properties and high quality surface finishing to be used ...
Voir le projet

 14

 TERMINÉ 
Quality assurance plays a key role in the food industry. Current control of safety and quality characteristics in the bakery industry is carried out mainly by random sampling of the initial, intermediate and/or final products. However, this methodology does not allow immediate adjustments to the production process in case any negative quality features are detected and consequently large batches of ...
Voir le projet

 12

 TERMINÉ 
ALLOW THE YOUTH MOBILITY BY UPGRADING SKILLS ACQUIRED THROUGH LEARNING MADE WITHIN THE EUROPEAN SPACE The Regional Federation of MFR (FRMFR) in Brittany undertakes, in its mission of facilitating networks, eight MFR located throughout the Breton territory. The 161 young people involved in the Erasmus + program will go to twelve different countries: Switzerland, Ireland, Spain, Sweden, Poland, Port ...
Voir le projet

 165

 TERMINÉ 
"The overall objective of the ELASSTIC project is to improve the security and resilience of large scale multifunctional building complexes to natural and man-made disasters by providing a methodology and tools which enable to include security and resilience from the early design and planning phase of such projects.The ELASSTIC concept proposed is based upon the following key features:1) A comprehe ...
Voir le projet

 9

 TERMINÉ 

Aero-Thermodynamic Loads on Lightweight Advanced Structures II (ATLLAS II)

Date du début: 1 mai 2011, Date de fin: 31 oct. 2015,

ATLLAS II is a logical follow-up of a recently finalized FP6 project which has as objectives the identification and assessment of advanced light-weight and high-temperature resistant materials for high-speed vehicles up to Mach 6.The material requirements are first defined through an in-depth feasibility study of a Mach 5-6 vehicle. The consortium has now this capability at hand as they can rely o ...
Voir le projet

 16

 TERMINÉ 
The main idea of the PERFORMANCE project is to develop and validate a holistic, personalized food supply chain for frail elderly in nursing homes, ambient assisted living facilities or at home (served by nursing services). The supply “chain” in this case will resemble a loop with the elderly consumers forming the initial link (personal preference and needs) and final link (consumption). As a resul ...
Voir le projet

 14

 TERMINÉ 
"It is increasingly evident that the era of mass production is being replaced by the era of market niches. The key to creating products that can meet the demands of a diversified customer base is a short development cycle yielding low cost, high quality goods in sufficient quantity to meet demand. This makes flexibility an increasingly important attribute to manufacturing.In response the reconfigu ...
Voir le projet

 12

 TERMINÉ 

SAFER AND FASTER EVIDENCE-BASED TRANSLATION (SAFE-T)

Date du début: 15 juin 2009, Date de fin: 14 juin 2015,

The public-private consortium composed of complementary SMEs, academic and clinical centers of excellence and EMEA as partner proposes SAFE-T (Safer And Easter Evidence-based Iranslation) project for the establishment of a biomarker (BM) qualification process and its validation in clinical biomarker studies designed for the translation, performance testing and eventual regulatory qualifIcatIon of ...
Voir le projet

 26

 TERMINÉ 

VARiability In safety critical Embedded Systems (VARIES)

Date du début: 1 mai 2012, Date de fin: 30 avr. 2015,

"In order to succeed or even to survive, manufacturers and system integrators must be able to deliver new products with speed, diversity, high quality, and at an acceptable cost.Embedded Systems (ES) are rarely entirely conceived from scratch. Companies developing ES constantly face decisions about using and adapting existing products or product assets versus new developments. Determining the long ...
Voir le projet

 29

 TERMINÉ 

Safety and quality assurance measures along the pellets supply chain (SAFEPELLETS)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2014,

Isolated incidents due to increased, toxic emissions in pellet storages have aroused great relevance and urgency on operational and customer safety in wood pellet supply chains. Reportedly two cases of death have occurred in large size vessels for ocean transportation and in harbour facilities. Another three incidents were reported in end-users´ storage rooms, the last of which resulted in the dea ...
Voir le projet

 15

 TERMINÉ 

European Coordinating Body in Maths, Science and Technology Education (ECB) (ECB)

Date du début: 1 févr. 2011, Date de fin: 31 oct. 2014,

The European Coordinating Body in Maths, Science and Technology Education (ECB) is a large-scale strategic response to the FP7 call to reinforce links between science education and science and technology careers in the private sector through reinforcing the partnership industry/education.The overall aim of the ECB is to increase young Europeans’ interest in mathematics, science and technology (MST ...
Voir le projet

 29

 TERMINÉ 

User-centric Wireless Local-Loop (ULOOP)

Date du début: 1 sept. 2010, Date de fin: 31 oct. 2013,

The flexibility inherent to wireless technologies is giving rise to new types of access networks and allowing the Internet to expand in a user-centric way. This is particularly relevant if one considers that wireless technologies such as Wireless Fidelity (Wi-Fi) currently complement Internet access broadband technologies, forming the last hop to the end-userr. This fact becomes even more signific ...
Voir le projet

 15

 TERMINÉ 

Miniaturized Flow Control Unit (µFCU)

Date du début: 1 déc. 2011, Date de fin: 30 sept. 2013,

"This proposal is related to FP7 space call 2011 - SPA.2011.2.2-02 (Space critical technologies). The purpose of the proposed work is the development of a miniaturized flow control unit (µFCU) for noble gases like xenon. The proposed technology is relevant to the call as it is listed in the Urgent Action List (ID 13). It is requested by space industry and agencies according ESTER database (e.g. re ...
Voir le projet

 5

 TERMINÉ 

Semiconductor Equipment Assessment Leveraging Innovation (SEAL)

Date du début: 1 juin 2010, Date de fin: 30 sept. 2013,

Description Seal is an EC-funded project covering semiconductor equipment assessment to strengthen the European semiconductor equipment industry. SEAL is an integrated project consisting of 17 equipment assessment sub-projects in the area of semiconductor manufacturing equipment. The assessment th ...
Voir le projet

 39

 TERMINÉ 

Beyond CMOS Nanodevices for Adding Functionalities\nto CMOS (NANOFUNCTION)

Date du début: 1 sept. 2010, Date de fin: 31 août 2013,

Description NANOFUNCTION addresses the merging of advanced More than Moore (MtM) devices with Beyond-CMOS. Topics: Si nanowires for sensing, on-chip energy harvesting, nano-cooling and porous Si for RF passives.The NANOFUNCTION project aims to integrate at the European level the excellent European research laboratories in order to strengt ...
Voir le projet

 21

 TERMINÉ 

Flexible, Fast and Future Production Processes (F³ FACTORY)

Date du début: 1 juin 2009, Date de fin: 31 juil. 2013,

The F3 consortium’s vision is that the EU’s chemical industry’s competitive position would be strongly enhanced if it could operate modular continuous plant (F3 plant) which combines world scale continuous plant efficiency, consistency and scalability with the versatility of batch operation. Our project will deliver such a radically new production mode based on: a) Plug–and–play modular chemical ...
Voir le projet

 29

 TERMINÉ 

Enhanced Nano-fluid Heat Exchange (NanoHex)

Date du début: 1 sept. 2009, Date de fin: 28 févr. 2013,

Henix will translate promising laboratory based nanotechnology results into pilot lines for the production of nanofluid coolants. This project, conceived and led by its European industrial partners, is designed to improve the competitiveness of European industry by developing new and more efficient cooling technologies and processes; specifically a new, state of the art, nanofluid coolant with a s ...
Voir le projet

 10

 TERMINÉ 

Cost-Efficient Methods and Processes for Safety Relevant Embedded Systems (CESAR)

Date du début: 1 mars 2009, Date de fin: 30 juin 2012,

"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Voir le projet

 54

 TERMINÉ 
"Within the context of the GMES Initiative, the G-MOSAIC Collaborative Project aims at identifying and developing products, methodologies and pilot services for the provision of geo-spatial information in support to EU external relations policies and at contributing to define and demonstrate sustainability of GMES global security perspective. The activities will be devoted to: Investigate the oper ...
Voir le projet

 39

 TERMINÉ 

Integrating Research in Interactive Storytelling (IRIS)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2011,

Description Virtual Centre of ExcellenceInteractive Storytelling is a major endeavour to develop new media which could offer a radically new user experience, with a potential to revolutionise digital entertainment. European research in Interactive Storytelling has played a leading role in the development of the field, and this creates a u ...
Voir le projet

 11

 TERMINÉ 

GENeric European Sustainable Information Space for Environment (GENESIS)

Date du début: 1 sept. 2008, Date de fin: 31 août 2011,

The GENESIS Project has the objective of providing Environment management and Health actors with an innovative solution based on advanced ICT. Relying on interoperability standards and harmonization process, GENESIS helps to constitute complex information networks, by combining benefits of various information systems with a collaborative systems approach. The proposed generic solution allows easy ...
Voir le projet

 29