Rechercher des projets européens

38 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

ACTRIS PPP - Aerosols, Clouds and Trace gases Preparatory Phase Project (ACTRIS PPP)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The Research Infrastructure (RI) ACTRIS – Aerosols, Clouds and Trace Gases - is the pan-European RI that consolidates activities amongst European partners for observations of aerosols, clouds, and trace gases and for understanding of the related atmospheric processes, to provide RI services to wide user groups. ACTRIS is composed of 8 connected elements: distributed National Facilities (observatio ...
Voir le projet

 28

 TERMINÉ 
The present situation of nuclear energy in Europe asks for a continuing effort in the field of Education and Training aimed to assure a qualified workforce in the next decades. In this scenario, the present proposal is aimed at enhancing and networking the Europe-wide efforts initiated in the past decades by different organisations belonging to academia, research centres and industry to maintain a ...
Voir le projet

 25

 TERMINÉ 
The overall aim of the AERO-UA project is to stimulate aviation research collaboration between the EU and Ukraine through strategic and targeted support. AERO-UA is focused solely on Ukraine, because the country has a huge aerospace potential but a low level of aviation research collaboration with the EU. Ukraine’s aerospace sector spans the full spectrum of systems and components development and ...
Voir le projet

 9

 TERMINÉ 

Coordinated Research Infrastructures Building Enduring Life-science services (CORBEL)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

The social and economic challenges of ageing populations and chronic disease can only be met by translation of biomedical discoveries to new, innovative and cost effective treatments. The ESFRI Biological and Medical Research Infrastructures (BMS RI) underpin every step in this process; effectively joining scientific capabilities and shared services will transform the understanding of biological m ...
Voir le projet

 39

 TERMINÉ 

Advanced European Infrastructures for Detectors at Accelerators (AIDA-2020)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2019,

Particle physics is at the forefront of the ERA, attracting a global community of more than 10,000 scientists. With the upgrade of the LHC and the preparation of new experiments, the community will have to overcome unprecedented challenges in order to answer fundamental questions concerning the Higgs boson, neutrinos, and physics beyond the Standard Model. Major developments in detector technology ...
Voir le projet

 38

 TERMINÉ 
The EUNPACK project unpacks EU crisis response mechanisms, with the aim to increase their conflict sensitivity and efficiency. By combining bottom–up perspectives with an institutional approach, EUNPACK will increase our understanding of how EU crisis responses function and are received on the ground in crisis areas. This entails exploring local agencies and perceptions in target countries without ...
Voir le projet

 12

 TERMINÉ 
Education systems must generate new skills, to respond to the knowledge society and the need to improve education attainment. It is crucial to equip people with key competences, including the basic skills: good communication in mother tongue, foreign languages, interpersonal skills and digital abilities.The success and development of any community is brought about by affective change and developm ...
Voir le projet

 6

 TERMINÉ 

Go International

Date du début: 1 juil. 2016, Date de fin: 30 juin 2018,

For our students, who predominantly come from rural areas and are keen to pursue our two-year course leading to the qualification of ´foreign language assistant´, a work placement abroad is an essential building block for the development of their character. Furthermore, it will improve their opportunities of finding employment. Our students show great interest in these work placements, which is wh ...
Voir le projet

 5

 TERMINÉ 

"Get ready for Europe" ; Zusatzqualifikation zum Europakaufmann

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

Project background:Our labor market turns European. That is why it becomes increasingly important to equip trainees with additional language competences and to motivate them to work in other EU member states.Project goals:We intend to offer our students the possibility of an additional qualification as European commercial management assistants. In this context we support them – in cooperation with ...
Voir le projet

 9

 TERMINÉ 

Human Brain Project Specific Grant Agreement 1 (HBP SGA1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

Understanding the human brain is one of the greatest scientific challenges of our time. Such an understanding can provide profound insights into our humanity, leading to fundamentally new computing technologies, and transforming the diagnosis and treatment of brain disorders. Modern ICT brings this prospect within reach. The HBP Flagship Initiative (HBP) thus proposes a unique strategy that uses I ...
Voir le projet

 126

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

Systems Biology to Identify Molecular Targets for Vascular Disease Treatment (SYSVASC)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2018,

Asymptomatic vascular damage accumulates for years before patients are identified and subjected to therapeutic measures. The limited knowledge on early vascular disease pathophysiology is reflected in the lack of therapeutic options. SysVasc aims to overcome this limitation by mounting a comprehensive systems medicine approach to elucidate pathological mechanisms, which will yield molecular target ...
Voir le projet

 19

 TERMINÉ 
Clouds are a very important, yet not well understood feedback factor in climate change and they contribute to the effective radiative forcing (ERF) from aerosol-cloud interactions (ACI). The uncertainty in ERFaci is larger than for any other forcing agent. Also, feedbacks between the terrestrial and marine biosphere and the atmosphere involving ACI are thought to play an important role in regulati ...
Voir le projet

 22

 TERMINÉ 

Target language improvement in the MFL classroom

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

We have a focus in school about improving literacy and within MFL we are very keen on improving the pupils speaking skills along with reading and writing. This project would put emphasis mainly upon speaking and listening meaning that pupils would have the opportunity to develop improved accent and vocabulary and confidence in using the target language. We would like to improve attainment within ...
Voir le projet

 1

 TERMINÉ 

BeTheCuRE (BTCURE)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2017,

BTCure is based on the recognition that RA is a heterogeneous disease where a major subset involves adaptive immunity, and that animal models have to develop the line with the different subsets of the human diseases in order to be optimally used for drug discovery and drug evaluation. Our aim is to develop an understanding of the early process in human arthritis subsets and the animal models that ...
Voir le projet

 41

 TERMINÉ 

Process Line Implementation for Applied Surface Nanotechnologies (PLIANT)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2017,

In this proposed integrating project we will develop innovative in-line high throughput manufacturing technologies which are all based on atmospheric pressure (AP) vapour phase surface and on AP plasma processing technologies. Both approaches have significant potential for the precise synthesis of nano-structures with tailored properties, but their effective simultaneous combination is particularl ...
Voir le projet

 24

 TERMINÉ 

Research and Competence Training Network for Sustainability-Driven Innovation (I4S)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2016,

The EC is committed to a research and innovation policy that drives ‘smart, sustainable and inclusive growth’. The I4S training network is designed to study sustainability-driven innovation (SDI) in support of this objective. This is much needed as SDI is poorly understood, with companies only now experimenting with practice in this emerging field. This provides opportunity for a new program of r ...
Voir le projet

 9

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Voir le projet

 116

 TERMINÉ 

Fit For Global Business

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

For our students, who predominantly come from rural areas and are keen to pursue our two-year course leading to the qualification of ´foreign language assistant´, a work placement abroad is an essential building block for the development of their character. Furthermore, it will improve their opportunities of finding employment. Our students show a great deal of interest in these work placements, w ...
Voir le projet

 6

 TERMINÉ 

Safety of ACtinide Separation proceSSes (SACSESS)

Date du début: 1 mars 2013, Date de fin: 30 juin 2016,

"Nuclear power plays a key role in limiting EU’s greenhouse gases emissions, and makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensur ...
Voir le projet

 26

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

Infrastructure for Systems Biology - Europe (ISBE)

Date du début: 1 août 2012, Date de fin: 31 juil. 2015,

The Infrastructure for Systems Biology in Europe (ISBE) programme comprises an infrastructure that is designed to meet the needs of European systems biology, in terms of development, applications and training. In order to address this requirement, we are proposing a distributed, interconnected infrastructure which primarily comprises three types of centres: Data Integration Centres (DICs), and sys ...
Voir le projet

 24

 TERMINÉ 

Advanced European Infrastructures for Detectors at Accelerators (AIDA)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2015,

AIDA (http://cern.ch/aida) addresses the upgrade, improvement and integration of key research infrastructures in Europe, developing advanced detector technologies for future particle accelerators, as well as transnational access to facilities that provide these research infrastructures.In line with the European Strategy for Particle Physics, AIDA targets the infrastructures needed for R&D, prototy ...
Voir le projet

 39

 TERMINÉ 

European Nuclear Science and Applications Research (ENSAR)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2014,

ENSAR is the Integrating Activity of Nuclear Scientists from almost all European countries performing research in three of the major subfields of Nuclear Physics: Nuclear Structure, Nuclear Astrophysics and Applications of Nuclear Science. It proposes an optimised ensemble of Networking (NAs), Transnational Access and Joint Research Activities (JRAs), which will ensure qualitative and quantitative ...
Voir le projet

 32

 TERMINÉ 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Voir le projet

 143

 TERMINÉ 

European Coordination for Accelerator Research and Development (EuCARD)

Date du début: 1 avr. 2009, Date de fin: 31 juil. 2013,

Particle physics stands at the threshold of a new era of discovery and insight. Results from the much awaited LHC are expected to shed light on the origin of mass, supersymmetry, new space dimensions and forces. In July 2006 the European Strategy Group for Particle Physics defined accelerator priorities for the next 15 years in order to consolidate the potential for discovery and conduct the requi ...
Voir le projet

 39

 TERMINÉ 

InfraStructure for the European Network for Earth System Modelling (IS-ENES)

Date du début: 1 mars 2009, Date de fin: 28 févr. 2013,

"IS-ENES will develop a Virtual Earth System Modelling Resource Centre (V.E.R.C.), integrating the European Earth system models (ESMs) and their hardware, software, and data environments. The overarching goal of this e-infrastructure is to further integrate the European climate modelling community, to help the definition of a common future strategy, to ease the development of full ESMs, to foster ...
Voir le projet

 20

 TERMINÉ 
Outstanding progress has been made in recent years in developing novel structures and applications for direct fabrication of 3D nanosurfaces. However, exploitation is limited by lack of suitable manufacturing technologies. In this project we will develop innovative in-line high throughput technologies based on atmospheric pressure surface and plasma technologies. The two identified approaches to d ...
Voir le projet

 22

 TERMINÉ 
The development and production of glycoarrays will provide the foreground knowledge necessary to lead to a step change in the diagnosis and treatment of diseases ranging from cancers to autoimmune diseases. Carbohydrates play a pivotal role in the molecular interactions that govern biological events at the centre of health and disease. This has become more evident as the characterisation and ident ...
Voir le projet

 17

 TERMINÉ 

Advanced Radio Astronomy in Europe (RadioNet-FP7)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2012,

RadioNet is an integrating activity that has pulled together ALL of Europe's leading radio astronomy facilities to produce a focused, coherent and integrated proposals that will significantly enhance the quality and quantity of science performed by European astronomers. RadioNet FP7 has 25 partners. They range from operators of major radio telescope facilities to laboratories that specialise in m ...
Voir le projet

 28

 TERMINÉ 
The main scope of the DoubleNanoMem project is the development of nanostructured membranes based on the most appropriate combination of nanofillers with well-defined size and porosity, dispersed in advanced high free volume polymers with inherent nanoporosity for application in specific gas and vapour separations. This approach is driven by the main requirement for successful replacement of tradit ...
Voir le projet

 10

 TERMINÉ 

Integrated European Industrial Risk Reduction System (IRIS)

Date du début: 1 oct. 2008, Date de fin: 31 mars 2012,

Current practices in risk assessment and management for industrial systems are characterized by its methodical diversity and fragmented approaches. In retrospect these risk and safety paradigms resulted from diverse industries driven and limited by available knowledge and technologies. A change based on industry driven R&D work is needed. At present the European Industry recognised their obligatio ...
Voir le projet

 37

 TERMINÉ 

Biobanking and Biomolecular Resources Research Infrastructure (BBMRI)

Date du début: 1 févr. 2008, Date de fin: 31 janv. 2011,

The Preparatory Phase for a pan-European Biobanking and Biomolecular Resources Research Infrastructure (BBMRI) will focus on technical, legal, governance, and financial issues to • prepare to construct BBMRI, building on existing biobanks, resources and technologies, specifically complemented with innovative components and properly embedded into European scientific, ethical, legal and societal fra ...
Voir le projet

 55

 TERMINÉ 

Enabling Grids for E-sciencE III (EGEE-III)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2010,

A globally distributed computing Grid now plays an essential role for large-scale, data intensive science in many fields of research. The concept has been proven viable through the Enabling Grids for E-sciencE project (EGEE and EGEE-II, 2004-2008) and its related projects. EGEE-II is consolidating the operations and middleware of this Grid for use by a wide range of scientific communities, such as ...
Voir le projet

 167

 TERMINÉ 
Voir le projet

 113

 TERMINÉ 
This project will develop and disseminate an approach to in-service teacher development that addresses one of the biggest challenges facing schools across Europe, that of responding to learner diversity. Building on earlier work carried out by members of the project team, it will be based on the following propositions:1. Evidence collected within a school create spaces for reappraisal and rethink ...
Voir le projet

 12

 TERMINÉ 

The Learning Museum

Date du début: 1 nov. 2010,

2010 marks a turning point in European policies, with the assessment of the impact of the Lisbon Strategy (2000) and the indication of a new way forward. From previous EU documents, from the outcomes of the Access to Culture Platform and of the Open Method of Coordination, but especially from the Commission Working Document “Consultation on the Future EU 2020 Strategy” it emerges that the achievem ...
Voir le projet

 23

 TERMINÉ 
This TN project brings together within a single network all actors in HE in chemistry and chemical engineering in Europe. There are schools, universities, industries, national chemical societies, and accreditation bodies. The project brings all these actors together to collaborate in the development of a knowledge based economy, specifically in chemistry and chemical engineering. The project:- wil ...
Voir le projet

 118