Rechercher des projets européens

17 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
"The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MAXSIMA is to contribute to the ""safety in MYRRHA"" assessment.MAXSIMA has five technical ...
Voir le projet

 14

 TERMINÉ 

Severe Accident Facilities for European Safety Targets (SAFEST)

Date du début: 1 juil. 2014, Date de fin: 30 juin 2018,

"Severe accident with core meltdown is a threat to the containment integrity. As Chernobyl and Fukushima accidents demonstrate, significant release of radioactive products into the environment can cause severe consequences both for people's health and the country's economy. Severe accidents are the focus of considerable research involving substantial human and financial resources worldwide. The re ...
Voir le projet

 9

 TERMINÉ 

solving CHAllenges in Nuclear DAta (CHANDA)

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2017,

"The CHANDA project main objective is to address the challenges in the field of nuclear data for nuclear applications and its acronym stands for solving CHAllenges in Nuclear DAtaThe project will prepare a proposal for an organization that will coordinate the nuclear data research program, and the infrastructures and capabilities of the EU Member States in a stable structure, well integrated with ...
Voir le projet

 35

 TERMINÉ 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Voir le projet

 37

 TERMINÉ 

MyrrhA Research Infrastructure Support Action (MARISA)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

"The MYRRHA project aims to develop and to construct a world-class and first-of-a-kind nuclear research infrastructure. The design and the construction of the MYRRHA facility is particularly challenging since it requires the management of a large number of activities in view of achieving technical excellence in compliance with the project budget and schedule. Accordingly, state-of-the-art project ...
Voir le projet

 17

 TERMINÉ 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Date du début: 1 mars 2011, Date de fin: 29 févr. 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Voir le projet

 17

 TERMINÉ 

Strategy for Allied Radioecology (STAR)

Date du début: 1 févr. 2011, Date de fin: 31 juil. 2015,

With a renewed interest in nuclear energy and the scientific challenges related to the nuclear fuel cycle, the need for radioecological expertise is increasing world-wide. Concurrently, education related to radioecology has steadily declined, leading experts are approaching retirement, and funding for radioecological research is at a minimum in many European countries. To face this challenge and a ...
Voir le projet

 11

 TERMINÉ 

Safe ExploitAtion Related CHemistry for HLM reactors (SEARCH)

Date du début: 1 nov. 2011, Date de fin: 30 avr. 2015,

"In accordance with the ESNII roadmap MYRRHA will be the first HLM cooled nuclear system to be deployed in Europe. The SEARCH project aims to support the licensing process of MYRRHA by investigating the safe chemical behaviour of the fuel and coolant in the reactor. The control of the oxygen content and the management of impurities in the melt will be studied. A second critical issue in the safety ...
Voir le projet

 13

 TERMINÉ 

MATerials TEsting and Rules (MATTER)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Voir le projet

 30

 TERMINÉ 

Seismic-Initiated events risk mitigation in LEad-cooled Reactors (SILER)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

"SILER is a Project aimed at studying the risk associated to seismic initiated events in Generation IV Heavy Liquid Metal reactors and developing adequate protection measures.The attention is focused on the evaluation of the effects of earthquakes (with particular regards to beyond design seismic events and tsunamis) and to the identification of mitigation strategies, acting both on structures/com ...
Voir le projet

 18

 TERMINÉ 

"MYRRHA Accelerator eXperiment, research and development programme" (MAX)

Date du début: 1 févr. 2011, Date de fin: 31 juil. 2014,

"The present FP-7 proposal MAX is subsequent to the recommendations of the Strategic Research Agenda of SNETP for ADS development in Europe. Its aim is to pursue the R&D required for a high power proton accelerator as specified by the MYRRHA project. There is especially a strong focus on all the aspects that pertain to the reliability and availability of this accelerator.This R&D effort builds on ...
Voir le projet

 11

 TERMINÉ 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Voir le projet

 22

 TERMINÉ 

New MS Linking for an Advanced Cohesion in Euratom Research (NEWLANCER)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2013,

"NEWLANCER project proposes to identify and implement effective and efficient actual solutions leading to enlarged NMS involvement in future Euratom Framework Programmes by strengthening and catalyzing the full R&D potential at national level, by increasing cohesion between New Member States institutions, and by improving their cooperation with Old Member States research centres.The specific sub-o ...
Voir le projet

 19

 TERMINÉ 

BIOcontamination Specific Modeling in HAbitats Related to Space (BIOSMHARS)

Date du début: 1 juin 2011, Date de fin: 31 mai 2013,

"BIOSMHARS is the first phase of a Europe - Russia research effort aiming to develop the scientific and technical tools enabling to have a comprehensive approach of biocontamination inside manned spacecrafts, and to develop appropriate countermeasures. BIOSMHARS will develop and calibrate a mathematical model predicting the transportation of bioaerosols in a closed environment and the induced bioc ...
Voir le projet

 6

 TERMINÉ 
The objective of the proposal is based on the outcome of PATEROS CA to assess more in depth the regional approach to P&T implementation. It will respond to one of the key-topics put forward by the Strategic Research Agenda of SNETP. The project intends to look at the economical aspects of the most realistic scenario for P&T with the hypothesis: limit the MA bearing fuel transport and limit the MA ...
Voir le projet

 11

 TERMINÉ 

EU-CHINA Nuclear Education and Training Cooperation (ECNET)

Date du début: 1 mars 2011, Date de fin: 28 févr. 2013,

The project aims to coordinate the cooperation between the EU and China in the field of Nuclear Education and Training. The project consists of 6 Work Packages. The first three Work Packages are establishing the strategy for long term cooperation in Education and Training and Knowledge Management in the areas of Nuclear Engineering, Radiation Protection and Waste Management and Disposal. The strat ...
Voir le projet

 9

 TERMINÉ 
"Besides the European Global Energy Policy, the European Council adopted an action plan that covers nuclear technologies and supports research in order to ""further improve nuclear safety and the management of radioactive waste"". To obtain a more efficient and sustainable management of radioactive waste and hence reduce the burden on geological storage, one can apply partitioning and transmutatio ...
Voir le projet

 20