Rechercher des projets européens

6 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

SPIRAL2 PREPARATORY PHASE (SPIRAL2PP)

Date du début: 1 nov. 2007, Date de fin: 31 mars 2012,

The SPIRAL 2 Preparatory Phase project aims to achieve the development and signing of the consortium agreement allowing for the construction of the facility. The SPIRAL 2 project located at the GANIL facility (Caen, France) will deliver energetic rare (radioactive) isotope beams with intensities not yet available with presently running machines. The studies of the properties of nuclei forming thes ...
Voir le projet

 25

 TERMINÉ 

Facility for Antiproton and Ion Research (FAIR)

Date du début: 1 août 2007, Date de fin: 31 janv. 2012,

"Subject of this EU project is the implementation of the FAIR GmbH for the construction of the new research infrastructure FAIR. The "Facility for Antiproton and Ion Research" is an integrated system of particle accelerators which will provide high energy and high intensity beams of ions from antiprotons to uranium with unprecedented quality for basic research in different fields of phys ...
Voir le projet

 24

 TERMINÉ 

Preparatory Phase of the Large Hadron Collider Upgrade (SLHC-PP)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2011,

"The Large Hadron Collider upgrade (SLHC) is the project with highest priority in “The European strategy for particle physics” document, unanimously approved by the CERN Council in July 2006. The SLHC, with expected 1 B€ budget, includes the upgrade of specific elements of the LHC accelerator, major upgrades in the accelerator injector complex, as well as upgrades to the two high-luminosity experi ...
Voir le projet

 18

 TERMINÉ 

Preparatory Phase of the IRUVX-FEL Consortium (IRUVX-PP)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2011,

The successful demonstration of single-pass free electron lasers (FEL) around the year 2000 triggered a number of research centres in Europe, the United States and Asia to initiate the construction of new research infrastructures. These projects are based on strong science cases put forward by interested research communities. The new FEL sources combine the wide and continuously tunable wavelength ...
Voir le projet

 7

 TERMINÉ 

GEOSS INSPIRE and GMES an Action in Support (GIGAS)

Date du début: 1 juin 2008, Date de fin: 31 mai 2010,

The GEOSS INSPIRE and GMES an Action in Support (GIGAS) promotes the coherent and interoperable development of the GMES, INSPIRE and GEOSS initiatives through their concerted adoption of standards, protocols, and open architectures. Given the complexity and dynamics of each initiative and the large number of stakeholders involved, the key added value of GIGAS is bringing together the leading organ ...
Voir le projet

 20

 TERMINÉ 

The European Spallation Neutron Source (ESS) (NeutronSourceESS)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2010,

The European Spallation neutron Source (ESS) will be the world’s most powerful source of neutrons. Its design parameters makes it the most cost-effective top tier source for 40 years or more. A genuine pan‑European facility, it will serve a user community of 5,000 users annually across many areas of science and technology. Neutron beams produced by reactors are inherently intensity-limited. The ES ...
Voir le projet

 11